Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›Cuxhaven Ready For Heavy Offshore Wind Loads
News

August 23, 2017 · about 9 years ago

Cuxhaven Ready For Heavy Offshore Wind Loads

Lower Saxony’s Minister of Economics, Labour and Transport Olaf Lies has inaugurated a new berthing space and a new ramp at the port of Cuxhaven’s offshore terminal.

1 minutes read
  • LinkedIn
  • X
  • Email

Lower Saxony’s Minister of Economics, Labour and Transport Olaf Lies has inaugurated a new berthing space and a new ramp at the port of Cuxhaven’s offshore terminal.

The port now offers 1,340 metres of berthing space at the offshore terminal with water depths of up to 11.6 metres. The new ramp, with a dimension of 115 x 55 meters, will allow for the heavy loads to be loaded directly onto RoRo ships.

“Lower Saxony is a pioneer in power generation in Germany. The German offshore industry center in Cuxhaven is already writing success stories and has boosted the offshore industry. Due to our clever and far-sighted investments in the port infrastructure, we have created optimal conditions for the industry in Cuxhaven in time,” said Minister Lies .

The expansion of the port’s offshore terminal was seen as a natural step after Siemens decided to build a wind turbine factory in Cuxhaven, and after a number offshore wind-related companies established their presence in the area.

The newly added berthing space, Berth 9.3, and the new ramp will be utilised for the transportation and load-out of 20 jacket foundations for DONG Energy’s Borkum Riffgrund 2 wind farm.

The first jackets are expected to arrive from Stettin, Poland, in October and the project is expected to be completed by March 2018.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

News

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Gets New Offshore Wind Farm as All Turbines Installed at 704 MW Revolution Wind
  2. 2Vietnam-Made Cable Layer Enters Into Service in Taiwan
  3. 3Germany’s 960 MW He Dreiht Offshore Wind Farm Inaugurated
  4. 4200th Vestas V236-15.0 MW Wind Turbine Installed Offshore

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free