1165 results found for 'Hywind Demo'

1165 results found for 'Hywind Demo'
Order results by

A list of search results

  • 20 April 2018
    Ports & Logistics, Vessels, Wind Farm Update

    GeoSea has installed all of the transition pieces at the 396MW Merkur offshore wind farm in the German North Sea using A2SEA’s jack-up vessel Sea Challenger.

  • 16 April 2020
    Contracts & Tenders, Wind Farm Update

    FairWind has a won a contract by Bladt Industries to install the electrical scope on 135 transition pieces for the Hornsea Two offshore wind project in the UK. FairWind’s scope of work is full electrical installation, including light study design of cable support system, as well as installing all components and free issued items from […]

  • 29 July 2014
    Wind Farm Update

    GeoSea has just finalized the installation of 77 foundations on the DONG Energy Borkum Riffgrund 1 offshore wind farm. The installation works, including transport from the fabrication yard to the marshalling harbor, have proceeded in record times and finished ahead of schedule. The 77 units consisted of monopiles, weighing between 495 tonnes and 684 tonnes and measuring a diameter […]

  • 19 February 2018
    Ports & Logistics, Vessels, Wind Farm Update

    The Seafox 5 jack-up has arrived in Eemshaven to load the first set of wind turbine components for the 396MW Merkur offshore wind farm project in the German North Sea.

  • 23 February 2021
    Grid Connection, Wind Farm Update

    The first transition pieces for the Saint-Nazaire offshore wind project in France have arrived at the Port of La Rochelle. Smulders shipped off the first four transition pieces for the 480 MW project in mid-February from Belgium to Rotterdam, the Netherlands, from where they were transported to France. DEME’s jack-up vessel Innovation is expected to […]

  • 24 December 2020
    Contracts & Tenders, R&D, Technology

    Norway’s NEL Hydrogen ASA has won the contract to deliver the offshore electrolysis system for the PosHYdon project in the Dutch North Sea. The PosHYdon pilot is an initiative of Nexstep, the Dutch association for decommissioning and reuse, and TNO, the Dutch organisation for applied scientific research, in collaboration with the industry. Companies involved in the project […]

  • 10 December 2019
    Business & Finance, Wind Farm Update

    The Renewables Infrastructure Group Limited (TRIG) and the Dutch pension investor APG have signed an agreement to acquire 100% of Merkur Offshore GmbH, the owner and operator of the 396MW Merkur offshore wind farm in the German North Sea. The two investors signed the agreement with a consortium comprising of funds managed and/or advised by […]

  • 28 February 2020
    Grid Connection, Wind Farm Update

    The first of the two offshore substation topsides to be installed on the SeaMade wind farm in the Belgian North Sea has been loaded onto a barge at ENGIE Fabricom’s yard in Hoboken, Belgium. The 487MW SeaMade is a combination of two offshore wind projects previously known as Mermaid and Seastar. The 1,200-tonne topside will now be […]

  • 12 June 2020
    Ports & Logistics, Vessels

    DEME Offshore’s jack-up Apollo has undergone spudcan shoes extension installation at Damen Shiprepair & Conversion’s yard in Dunkerque, France. With the new spudcan extensions, Apollo will be able to get more stability on a wider variety of seabed soils, Damen said. Following her stay at the Dunkerque yard, the vessel is now ready to sail […]

  • 3 June 2019
    Contracts & Tenders

    Ørsted has contracted Bladt Industries to produce 135 transition pieces for the Hornsea Project Two offshore wind farm in the UK. The fabrication of the transition pieces is planned to begin this year at Bladt’s site in Aalborg, Denmark, with delivery expected to take place from mid-2020 to mid-2021. “We are proud that Ørsted have trusted Bladt Industries as […]

  • 14 June 2021
    Wind Farm Update

    The jacket foundation for the offshore substation that will be part of the Saint-Nazaire offshore wind farm is scheduled to be installed at the project site off France in August. This is according to the latest update from the jacket’s builder Rosetti Marino, which has just sent the structure on a 22-day journey from its […]

  • 8 October 2013
    Business & Finance, Operations & Maintenance

    Since the commissioning, the WINDEA one catamaran has had its schedule fully chartered out. After two short termed charters, the WINDEA one and its crew is now operating for the wind farm Borkum West II for a longer period. The WINDEA one is directly chartered by TRIANEL Windkraftwerk Borkum GmbH & Co. KG and performs […]

  • 20 May 2024
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The first offshore substation (OSS) topside has been installed at the Hai Long offshore wind farm by CSBC-DEME Wind Engineering’s (CDWE) Green Jade vessel in Taiwan. The 1,022 MW Hai Long comprises two offshore wind farms, the 532 MW Hai Long 2 and the 512 MW Hai Long 3 and is being developed in three phases as […]

  • 13 November 2019
    Wind Farm Update

    Siemens Gamesa has been selected as the preferred supplier of turbines for the 300MW Hai Long 2 offshore wind project in Taiwan. The agreement is subject to contract and final investment decision from project developers Northland Power Inc. and Yushan Energy. Siemens Gamesa said it will use its existing footprint and supply base in Taiwan […]

  • 15 August 2022
    Vessels, Wind Farm Update

    Six of the 95 monopile foundations have been installed at Dogger Bank A, the first of the three 1.2 GW phases that comprise Dogger Bank Wind Farm, the world’s largest offshore wind farm under construction. DEME’s installation vessel Innovation installed the first turbine foundation at the site located around 131 kilometres off the east coast […]

  • 16 December 2021
    Grid Connection, Wind Farm Update

    First power from the 1,386 MW Hornsea Two, soon to be the world’s largest offshore wind farm, is expected before the end of the year, a spokesperson for Ørsted told offshore WIND. 139 of the wind farm’s 165 Siemens Gamesa 8.4 MW wind turbines have now been installed, and all of the wind farms inter-array […]

  • 16 May 2018
    Wind Farm Update

    EnBW will start the construction works on its 112MW Albatros offshore wind farm in Germany in September, according to information in the company’s financial results for the first quarter of 2018.

  • 2 March 2021
    Wind Farm Update

    The Triton Knoll offshore wind project in the UK has generated its first power. According to RWE, the milestone follows the delivery of vital onshore and offshore electrical infrastructure on schedule, and despite the challenges of constructing during the Coronavirus pandemic. The project will now kick off a period of rigorous testing and commissioning, while […]

  • 1 July 2019
    Wind Farm Update

    UAE-based Lamprell has held a steel cutting ceremony to mark the start of construction of jacket foundations for the 950MW Moray East wind project offshore Scotland. GeoSea, part of DEME Offshore, the Engineering, Procurement, Construction and Installation (EPCI) contractor for the project’s 100 wind turbine foundations and three offshore substation foundations, contracted Lamprell to fabricate 45 wind turbine and […]

  • 20 December 2017
    Contracts & Tenders, Operations & Maintenance, Wind Farm Update

    GE Renewable Energy has contracted Global Wind Service (GWS) for the offshore installation scope on the 396MW Merkur offshore wind farm located in the German North Sea.

  • 20 June 2014
    Business & Finance

    The wind farm project developer PNE WIND AG presented its expertise and perspective in the development of offshore wind farms at the “Windforce 2014”, an international tradeshow held in Bremen. Of special interest to the visitors were the future projects of PNE WIND AG. Having already received permits for four North Sea offshore wind farms […]

  • 16 December 2022
    Wind Farm Update

    All 38 wind turbines at the Kaskasi offshore wind farm in Germany are now feeding electricity into the grid, according to an update shared on social media by Sven Utermöhlen, CEO Offshore Wind at RWE Renewables. Offshore construction at the project site, located 35 kilometres off the coast of Heligoland in the North Sea, commenced in early March […]

  • 5 December 2022
    Contracts & Tenders, Wind Farm Update

    The first of the 62 transition pieces to be built for Vineyard Wind 1, the first commercial-scale offshore wind project in the United States, has been transferred on 2 December from the Windar Renovables’ offshore facilities (Tadarsa Eólica 4) to the Port of Avilés, Spain. In 2019, Windar Renovables won a contract to manufacture, certify, […]

  • 8 August 2017
    Wind Farm Update

    Chelmsford-based CWind has won a contract to deliver all cable pull-in services for 66 offshore wind turbines and one offshore substation at the 396MW Merkur offshore wind farm.

  • 30 July 2024
    Cables, Grid Connection

    Tekmar Group has completed its role in the Dogger Bank A offshore wind farm by supplying essential cable protection systems (CPS) for the project’s inter-array cables. This month, Dogger Bank A, the first phase of the UK’s 3.6 GW Dogger Bank Wind Farm, achieved a significant milestone with the installation of all inter-array cables at […]

  • 6 August 2010
    R&D

    The Crown Estate today has announced that four companies have been awarded offshore wind demonstration sites. The awards follow an application process conducted in response to the UK offshore wind industry’s need to demonstrate new offshore wind turbines and other technologies in the marine environment. These demonstration projects will play a key part in addressing […]