2262 results found for 'Ørsted'

2262 results found for 'Ørsted'
Order results by

A list of search results

  • 6 May 2024
    Authorities, Planning & Permitting

    On 30 April, the US state of New Jersey launched its fourth round of offshore wind solicitation, aiming to award between 1.2 GW and 4 GW of generation capacity. The application window will stay open until 10 July 2024. New Jersey Governor Phil Murphy and the New Jersey Board of Public Utilities (NJBPU) president Christine […]

  • 29 May 2024
    Authorities, Planning & Permitting

    The New Jersey Board of Public Utilities (NJBPU) is advancing the state’s fifth offshore wind solicitation, commencing the round more than a year ahead of its original timeline. The state’s Board of Public Utilities announced on 28 May that it is moving up the next solicitation for additional offshore wind projects from the third quarter […]

  • 20 June 2019
    Wind Farm Update

    Norwegian offshore communication network operator Tampnet has won a contract to supply 4G/LTE coverage to Ørsted’s Hornsea One offshore wind farm. The 1,218MW Hornsea One is located 120 kilometers off the Yorkshire Coast, in the UK, and will be the world’s largest offshore wind farm when fully operational in 2020. Tampnet was awarded the contract for […]

  • 14 May 2019
    Grid Connection

    The jacket foundation for the 700MW Borssele Beta offshore platform has been transported to the installation site in the Dutch North Sea and the installation process has begun, TenneT said. The jacket foundation departed from the HSM Offshore’s yard in Schiedam on Monday, 13 May. The jacket left the yard soon after the Borssele Alpha […]

  • 31 December 2019
    Vessels

    Louis Dreyfus Armateurs (LDA) has shared a video showing the construction of its service operations vessel (SOV) Wind of Hope. LDA placed an order with Salt Ship Design last year for the new wind farm SOV, which is being built at Turkey’s Cemre Shipyard. Wind of Hope will feature ABB technology, including the power distribution system […]

  • 10 January 2020
    Wind Farm Update

    Teesside-based EEW Offshore Structures (Britain) (OSB) has loaded out the final transition pieces built for the Borssele 1+2 offshore wind farm. In total, EEW OSB manufactured and loaded out 35 transition pieces for Ørsted’s 752MW project in the Dutch North Sea. ALE Heavy Lift is in charge of transporting the transition pieces to Sif’s facility […]

  • 7 May 2018
    Wind Farm Update

    Fred. Olsen Windcarrier’s jack-up vessel Bold Tern installed the first MHI Vestas 8MW wind turbine at Ørsted’s Borkum Riffgrund 2 offshore wind farm in the German North Sea on 5 May.

  • 2 August 2023
    Infrastructure, Vessels

    Huisman has been awarded a contract by Seaway7, part of Subsea7 Group, for the delivery of the entire monopile installation spread for the jack-up vessel Seaway Ventus, which is currently being built by China Merchants Heavy Industry (CMHI). Under the contract, Huisman will deliver a monopile gripper, an upending frame, and two sets of monopile […]

  • 16 May 2018
    Vessels

    Wind farm installation vessel Seajacks Scylla has arrived at the Port of Esbjerg, Denmark, to undergo demobilization.

  • 15 May 2018
    Vessels

    GeoSea’s jack-up vessel Innovation is currently undergoing maintenance at the Port of Dunkerque in France, after which it will return to the Borkum Riffgrund 2 offshore wind farm in the German North Sea.

  • 28 April 2020
    Vessels

    Louis Dreyfus Armateurs (LDA) has selected SCHOTTEL to supply a range of propulsion systems for its service operations vessel (SOV) Wind of Hope. The propulsion system of Wind of Hope is powered by four diesel generators, which drive the electric motors of the SCHOTTEL propulsion package. Two SCHOTTEL Rudderpropellers type SRP 430 FP, each with […]

  • 11 December 2019
    Contracts & Tenders

    EGS Group has secured a contract to carry out a geophysical survey at Ørsted’s Ocean Wind offshore wind project in New Jersey, the U.S. EGS will use the 50m survey vessel MV Neptune to conduct the survey work at different areas of the 1,100MW wind farm located approximately 15 miles off the coast of Atlantic […]

  • 16 February 2018
    Ports & Logistics, Vessels, Wind Farm Update

    Jan De Nul’s jack-up vessel Vole au vent has left a shipyard in Poland where the vessel underwent certain modifications to the layout of the deck and is now ready for the Borkum Riffgrund 2 offshore wind farm project.

  • 21 June 2012
    R&D, Technology

    DNV COO Elisabeth Tørstad calls for more research and innovation to better serve the transition to a low-carbon economy.  “We must invest more in research and innovation in order to continuously improve the key renewable technologies. This will drive down life cycle costs and make renewable energy more competitive,” said Elisabeth Tørstad, Chief Operating Officer […]

  • 30 April 2019
    Grid Connection, Wind Farm Update

    HSM Offshore has loaded out the Borssele Alpha substation topside onto a barge at its yard in Schiedam, the Netherlands. The 700MW Borssele Alpha will collect the electricity generated by Ørsted’s Borssele 1 + 2 offshore wind farm and feed it into the Dutch grid. The substation’s jacket foundation was installed in August 2018. The platform […]

  • 7 March 2023
    Authorities, Business development, Contracts & Tenders, Research & Development

    The New Jersey Board of Public Utilities (NJBPU) has given the green light on the state’s third solicitation of offshore wind capacity. This third solicitation seeks to award between 1.2 GW and 4 GW of offshore wind capacity, building on the previously awarded 3.75 GW. The application window opened on 6 March and bids will […]

  • 14 June 2018
    Ports & Logistics, Wind Farm Update

    Poland’s ST3 Offshore has sent off the last shipment of suction bucket jacket foundations built for Ørsted’s Borkum Riffgrund 2 offshore wind farm in the German North Sea.

  • 3 August 2021
    Ports & Logistics

    Siemens Gamesa’s offshore wind nacelle assembly facility in Taichung, Taiwan has assembled its first nacelle. This marks the first time a Siemens Gamesa offshore turbine nacelle has been assembled outside Europe. The construction work on Siemens Gamesa’s assembly facility in Taichung Harbor started in March 2020. The parcel of land being developed in Taiwan measures […]

  • 4 September 2019
    Grid Connection

    Dutch transmission system operator TenneT inaugurated the 700MW Borssele Alpha offshore high voltage substation on Thursday, 5 September. The final piece for the completion of the Borssele Alpha project was the certification provided by DNV GL, TenneT said. The Borssele Alpha will collect the electricity generated at Ørsted’s soon to be built Borssele 1 + 2 offshore […]

  • 23 March 2022
    Contracts & Tenders, Grid Connection

    Electric transmission company LS Power Grid, a subsidiary of LS Power, has unveiled plans to bring power generated from New Jersey offshore wind farms into the state’s onshore electric grid. The company said the costs of its plan are between 20 and 50 per cent lower than the costs of competing proposals, which would amount […]

  • 12 February 2018
    Authorities, Business & Finance, Environment

    The Environmental Protection Administration (EPA) in Taiwan has approved the Environmental Impact Assessments (EIAs) of three offshore wind projects proposed to be built off Changhua County by Macquarie Capital and Swancor Renewable, according to local media.

  • 17 July 2018
    Grid Connection

    TenneT and HSM Offshore will hold a load-out ceremony for the jacket foundation of the Borssele Alpha transformer station in Schiedam on 26 July.

  • 5 April 2024
    Business development, Grid Connection, Onshore Infrastructure, Research & Development

    National Grid Ventures (NGV) and Con Edison Transmission have submitted plans for building a transmission infrastructure that will connect offshore wind power to the New Jersey electricity grid. The project, named the Garden State Energy Path, proposes laying underground cables that will enable the delivery of approximately 6 GW of offshore wind power from its […]

  • 10 May 2019
    Grid Connection

    The topside for the Borssele Alpha substation has departed from HSM Offshore in Schiedam towards the project site in the Dutch North Sea. The topside will travel through the Nieuwe Waterweg and Hoek van Holland where it will enter the North Sea. Upon arrival to the project site, it will be placed onto its jacket foundation, […]

  • 3 December 2019
    Wind Farm Update

    SAL Heavy Lift’s multi-purpose cargo ship Svenja has arrived at the Redcar Bulk Terminal, the UK, to pick up the third batch of transition pieces for the Borssele 1+2 offshore wind project. Svenja is picking up six transition pieces, which were produced by EEW Offshore Structures Britain (OSB) and barged down to the Redcar terminal […]

  • 7 December 2022
    Authorities, Contracts & Tenders

    The State of New Jersey plans to put up for auction up to 4,000 MW of offshore wind capacity in its third solicitation round scheduled to start in the first quarter of 2023. The New Jersey Board of Public Utilities has now issued the draft solicitation guidance document (SGD) for the third solicitation. The release […]