Search results for: Gode Wind 1

690 results

A list of search results

  • 1 July 2021
    Business & Finance, Wind Farm Update

    China’s Zhongtian Technology Submarine Cable (ZTT) has awarded Correll Services with contracts related to subsea cables at the Kaskasi II and Gode Wind 3 offshore wind projects in Germany. Correll Services will provide platform cable routing, termination and testing of 155kV subsea cables for the AC grid connection systems on the two wind farms. To […]

  • 21 April 2014
    Authorities, Business & Finance, Technology

    Faced with reduced funds for German offshore wind energy, Dong Energy has been revising its plans in Germany, with a possibility of scaling them back, writes the German manager magazin online edition. The company’s manager for German offshore business, Trine Borum Bojsen, said that ambitious policy goals are needed for a technology breakthrough to take […]

  • 17 June 2021
    Vessels, Wind Farm Update

    Turkey’s Cemre Shipyard has bid farewell to the service operations vessel (SOV) Wind of Hope. Ordered by Louis Dreyfus Armateurs (LDA), Wind of Hope’s first assignment will be on Ørsted’s 1.4 GW Hornsea Two off the UK, which will be the world’s largest wind farm once completed. The vessel will operate from Ørsted’s operations and […]

  • 16 May 2017
    Business & Finance, Operations & Maintenance, Wind Farm Update

    DONG Energy has once again selected the Papenburg-based Johann Bunte Bauunternehmung as the general contractor on the project to expand the existing offshore wind farm operations and maintenance (O&M) centre in Norden-Norddeich, Germany.

  • 31 May 2017
    Vessels

    Cemre Marin Endüstri has ordered four MAN 8L21/31 variable-speed GenSets for a wind service operation vessel (WSOV) currently under construction at the Turkish shipyard for France’s Louis Dreyfus Armateurs (LDA).

  • 2 July 2015
    Wind Farm Update

    A joint venture between Volker Stevin International and Boskalis, which was recently contracted for the design, procurement, fabrication, supply, transportation, installation and testing of 67 foundations for the Veja Mate offshore wind farm, has chosen Bladt Industries and EEW Special Pipe Constructions (SPC) for the supply of monopiles and transition pieces. EEW SPC will fabricate the 67 monopiles at their facilities […]

  • 13 April 2016
    Business & Finance, Operations & Maintenance, Wind Farm Update

    DONG Energy has signed a contract with the UK-based Hughes Sub Sea Engineering for the undertaking of a subsea inspection campaign at offshore wind farms located in Denmark and Germany. The offshore wind farms Hughes SSE will be servicing are Gode Wind 1 and 2 and Borkum Riffgrund located off the north west coast of Germany […]

  • 13 July 2017
    Technology, Vessels

    Uptime International has entered into a contract with Turkey’s Cemre Marin Endüstri A.S. for delivery of a full Uptime access solution.

  • 10 May 2017
    Business & Finance, Contracts & Tenders

    German wind farm developer PNE Wind recorded a solid start in 2017 driven largely by the offshore wind segment.

  • 12 January 2014

    Vestas Makes Major Progress in Wind Industry Vestas has received a record number of wind turbine orders per month in December, which amount to 1,346 MW. Germany: A2SEA to Install 97 Turbines on Gode Wind A2SEA has signed a contract with DONG Energy to install 97 turbines on Gode Wind 1 + 2 in the […]

  • 27 April 2018
    Authorities, Business & Finance, Contracts & Tenders, Wind Farm Update

    The German Federal Network Agency (Bundesnetzagentur) has awarded Ørsted the right to build an additional 551.75MW offshore wind capacity in the German North Sea.

  • 6 March 2017
    Wind Farm Update

    The second offshore substation for the Race Bank offshore wind farm set sail to the UK on 5 March, ENGIE Fabricom and Iemants reported.

  • 14 August 2018
    Business & Finance

    International law firm Pinsent Masons has been appointed to the new German advisory panel of Danish offshore wind farm owner and developer Ørsted.

  • 3 July 2019
    Grid Connection

    Ørsted’s offshore wind farms in the German North Sea have produced and delivered over 10 terawatt hours (TWh) of electricity since the first wind farm started producing in February 2015. The Danish energy company owns and operates four wind farms in the German North Sea with a combined capacity of nearly 1.4GW. “With our four […]

  • 22 August 2017
    Technology, Vessels

    ABB will install Onboard DC Grid power distribution onboard Louis Dreyfus Armateurs’ (LDA) wind farm Service Operation Vessel (SOV) to enable the cost-efficient integration of batteries.

  • 31 July 2023
    Contracts & Tenders, Infrastructure, Ports & Logistics

    The New Jersey Economic Development Authority (NJEDA) has approved agreements with Ørsted for the development and sublease of up to 34 acres at the New Jersey Wind Port (NJWP), which Ørsted will use as a staging and support area for its 1.1 GW Ocean Wind 1 offshore wind project. With the agreement, Ørsted will be […]

  • 20 July 2015

    Borkum Riffgrund 1 Turbine installation work is ongoing at the 312MW Borkum Riffgrund 1 offshore wind farm, located 54km off the German coast and around 37km from the island Borkum. The installation, performed by A2SEA’s SEA INSTALLER, reached half way in mid-March. The first of the 78 Siemens SWT-4.0-130 turbines was installed back in August 2014 and the first electricity was already produced mid-February. […]

  • 11 February 2022
    Business & Finance, Wind Farm Update

    After signing an agreement with Glennmont Partners in October 2021, Ørsted has now completed the divestment of 50 per cent of the 900 MW Borkum Riffgrund 3 offshore wind farm in Germany. This was the developer’s first farm-down to an institutional investor signed prior to taking a final investment decision, which the developer reached in December […]

  • 11 June 2020
    Business & Finance, Wind Farm Update

    Ørsted has installed its 1,500th offshore wind turbine with which the world’s leading offshore wind developer reached 7 GW of capacity installed. Ørsted achieved this milestone recently after installing the 25th Siemens Gamesa 8 MW wind turbine on the 752 MW Borssele 1 & 2 wind farm in the Dutch North Sea. Before construction start […]

  • 11 January 2016
    Business & Finance, Environment, Operations & Maintenance, Wind Farm Update

    Baker Consultants has won a contract with Iberdrola to provide an underwater noise and marine mammal activity monitoring service during the construction phase of the Wikinger offshore wind farm in the Baltic Sea. Baker Consultants will monitor underwater noise emissions as well as the activity of harbour porpoises that may be present within and around […]

  • 15 December 2020
    Contracts & Tenders, Grid Connection

    TenneT has commissioned subsea cable manufacturer Zhongtian Technology Submarine Cable (ZTT) for two offshore wind connections in Germany. ZTT will deliver cable systems to link offshore wind farms to HelWin beta and DolWin kappa converter platforms in the North Sea, with the cable routes being five and 16 kilometre respectively. The cable systems will be […]

  • 19 January 2023
    Vessels

    Jan De Nul’s next-generation floating offshore installation vessel, Les Alizés, sailed out of the China Merchants Heavy Industry’s (CMHI) Haimen shipyard in China on 19 January and is now on its way to Europe, where it will debut on Ørsted’s offshore wind farms in Germany. The CMHI shipyard delivered the vessel to Jan De Nul on […]

  • 27 October 2014
    Vessels, Wind Farm Update

    On 25 October 2014, A2SEA’s vessel SEA INSTALLER installed the first of 78 wind turbines at DONG Energy’s first German offshore wind farm, Borkum Riffgrund 1. Everything went according to plan. ”Installation of the first turbine went according to plan. Together with the project teams from Siemens Wind Power and DONG Energy, and the experienced crew […]

  • 21 September 2020
    Vessels

    Louis Dreyfus Armateurs’ (LDA’s) new service operations vessel (SOV), which will be working at Ørsted’s Hornsea Two offshore wind farm, was launched on 21 September at Cemre Shipyard in Turkey. The Wind of Hope SOV, ordered in 2018, is expected to arrive at Ørsted’s operations and maintenance (O&M) facility at the port of Grimsby in […]

  • 9 September 2022
    Contracts & Tenders, Vessels

    Germany-based SeaRenergy and its compatriot the Asian Spirit Steamship company (ASSC) have joined forces to offer cargo run services to the offshore wind supply chain in the German North Sea. The expansion of offshore energy projects together with the backlog of works due to the corona pandemic has an impact on the supply vessel demand […]

  • 19 December 2018
    Business & Finance, Contracts & Tenders, Vessels

    Louis Dreyfus Armateurs (LDA) has contracted TTS Group to provide an equipment package for its second service operations vessel (SOV) destined to operate for Ørsted.