Search results for: thialf

3109 results

A list of search results

  • 1 September 2023
    Business & Finance, Wind Farm Update

    Hellenic Cables has signed a contract with DEME Offshore for the supply of inter-array cables for the Dieppe Le Tréport offshore wind farm in France, being developed by the Eoliennes en mer Dieppe Le Tréport (EMDT) consortium off the French coast in the English Channel. Under the contract, the Greece-based cable supplier will design, manufacture, […]

  • 30 August 2023
    Authorities, Fixed-Bottom, Floating Wind, Outlook & Strategy, Planning & Permitting

    The Australian government will soon launch consultations for two more proposed offshore wind zones, namely the Bass Strait region off Northern Tasmania and the Indian Ocean region off Perth/Bunbury. The government, which has earlier identified six zones, is carrying out consultations as part of the process to officially declare each identified area an offshore wind […]

  • 7 February 2022
    Ports & Logistics, Vessels, Wind Farm Update

    Heerema Marine Contractors is modifying the giant semi-submersible crane vessel Thialf to be able to access and work on projects in the Baltic Sea such as the Arcadis Ost 1 offshore wind farm scheduled to start later this year. Thialf is currently moored at the Calandkanaal, Port of Rotterdam, where the vessel is being fitted […]

  • 1 June 2023
    Vessels, Wind Farm Update

    The installation of wind turbine jacket foundations at the Neart na Gaoithe (NnG) offshore wind farm will resume over the coming few days with the vessel Thialf set to carry out the work. Twelve foundations were installed at the Scottish project’s site last year, two of which are supporting the wind farm’s substations. The upcoming […]

  • 20 October 2014
    Technology, Vessels

    eVision Industry Software  has taken the next step in its partnership with Heerema. Today, Permit Vision goes live on the Thialf, the largest crane vessel in the world. Permit Vision allows Thialf management direct insight in and control of frontline operational risk, which is absolutely crucial to such a large installation. The implementation of Permit Vision on […]

  • 13 April 2023
    Vessels, Wind Farm Update

    Heerema Marine Contractors’ semi-submersible crane vessel (SSCV) Thialf has returned from the Baltic Sea and has been deployed on the Dogger Bank A & B offshore wind farms, where the vessel is currently installing jacket foundations for the project’s two offshore substations. According to AIS data available online and a recently issued Notice to Mariners […]

  • 22 November 2021
    Vessels, Wind Farm Update

    Heerema Marine Contractors is modifying cranes onboard Thialf to enable this world’s second-largest semi-submersible crane vessel to enter the Baltic Sea and work on the Arcadis Ost I offshore wind farm. Heerema Fabrication Group is fabricating the structures needed for the modification of Thialf’s cranes capable of lifting 14,200 metric tons. Thialf is second in […]

  • 28 August 2023
    Fixed-Bottom, Floating Wind, Industry

    Global Wind Energy Council (GWEC) has issued its annual offshore wind report, according to which 2022 was the second-best year for new capacity ever, with 8.8 GW connected to the grid around the world. The report also forecasts that a further 380 GW of offshore wind will be added by 2032, nearly half of which […]

  • 3 October 2022
    Vessels

    Heerema Marine Contractors’ crane vessel Thialf has crossed the Storebaelt Bridge and entered the Baltic Sea as the vessel is being deployed to install the offshore substation at the Baltic Eagle offshore wind farm and wind turbines at at the Arcadis Ost 1 offshore wind farm, both in Germany. Thialf‘s passage under the Storebaelt Bridge, […]

  • 28 February 2018
    Vessels

    Heerema’s vessel Thialf installed the new 1,600-tonne Huisman crane onboard Van Oord’s Aeolus today (28 February), making the vessel ready to handle the latest generation of foundations and turbines for offshore wind projects. 

  • 29 September 2022
    Contracts & Tenders, Vessels

    Heerema Marine Contractors has awarded Huisman a contract to deliver a Motion Compensated Pile Gripper (MCPG) for use in offshore wind farm construction. Designed specifically for Heerema’s semi-submersible crane vessel (SSCV) Thialf, the MCPG will enable Heerema to install monopiles up to 12.5 metres in diameter, with a length of up to 115 metres, and […]

  • 23 January 2023
    Grid Connection, Vessels, Wind Farm Update

    The offshore substation for Iberdrola’s offshore wind farm Baltic Eagle, being built in the German sector of the Baltic Sea, has been completed. The substation will sail out to the project site, located northeast of the island of Rügen, after the installation vessel Thialf completes its work on the Arcadis Ost 1 project. Once installed, […]

  • 3 May 2023
    Wind Farm Update

    Heerema Marine Contractors’ semi-submersible crane vessel (SSCV) Thialf has installed the offshore substation jacket for the Dogger Bank B offshore wind farm in the UK. After returning from the Baltic Sea, the vessel Thialf was deployed on the Dogger Bank A & B offshore wind farms to install the jacket foundations for the project’s two offshore substations. […]

  • 23 October 2014
    Business & Finance, Vessels

    Pronomar has received a new order from the Dutch established company Heerema Marine Contractors. Heerema placed an order for Pronomar’s drying systems for its deepwater construction vessel, the ‘Thialf’. The ‘Thialf’ is equipped with the following two applications: • Multipurpose drying systems for work overalls • Electrically heated drying panels for boots, shoes or gloves The wall-mounted seawater […]

  • 18 April 2023
    Vessels, Wind Farm Update

    The heavy lift vessel Seaway Strashnov has returned to the Dogger Bank A offshore wind farm site to resume the installation of monopile foundations. Meanwhile, the crane vessel Thialf has installed the jacket foundation for the Dogger Bank A offshore substation and will soon move on to the installation of the topside. The foundation installation on […]

  • 4 February 2022
    Ports & Logistics, R&D, Vessels

    Following the recent completion of the first offshore test, Heerema Marine Contractors has issued a video showing a novel method of assembling and installing XXL wind turbines onboard a floating, dynamically positioned (DP) vessel. The method was tested in the Dutch North Sea onboard the largest semi-submersible crane vessel in the world, Sleipnir. Heerema performed […]

  • 25 November 2022
    Vessels, Wind Farm Update

    The first of the total of 27 Vestas’s V174-9.5 MW wind turbines to be installed at the Arcadis Ost 1 offshore wind farm in the Baltic Sea is now up. The offshore wind farm is developed and owned by Belgian developer Parkwind, for which this is its first project in Germany. The 257 MW Arcadis Ost […]

  • 31 May 2023
    Grid Connection, Wind Farm Update

    50Hertz has completed the pull-in of two 220 kV subsea cable systems into Iberdrola’s Baltic Eagle platform. The two 220 kV subsea cable systems were previously laid on the seabed in a safe area next to the destination of the substation platform. In February of this year, the substation platform was installed at its intended […]

  • 26 August 2013

    The DolWin alpha converter platform has been installed in the North Sea. The platform is a crucial part of DolWin1. This offshore direct current grid connection system will have a length of 165 kilometres and a capacity of 800 MW. It is planned to connect three wind farms. The platform was built at Heerema Fabrication […]

  • 17 August 2023
    Business & Finance, Wind Farm Update

    Ørsted has completed the divestment of 25 per cent of the London Array offshore wind farm in the UK to funds managed by Schroders Greencoat. The company, which held a minority interest in the 630 MW offshore wind farm since 2014 and did not have operations and maintenance (O&M) responsibility on the project, said last […]

  • 8 March 2022
    Vessels, Wind Farm Update

    The 4,800-tonne offshore substation topside has been installed at the 1,075 GW Seagreen wind farm offshore Scotland. At 40 metres long, 45 metres wide, and 15 metres high, the topside will collect and manage the power generated by the 114 Vestas 10 MW wind turbines before transferring it ashore via around 60 kilometres of offshore […]

  • 30 August 2023
    Fixed-Bottom, Floating Wind, Grid Connection, Industry, Market Outlooks, Outlook & Strategy

    The number of New Jersey residents who support offshore wind fell by more than 20 per cent since 2019, from 76 per cent four years ago to just over half (54 per cent) now, and the number of those opposing offshore wind has climbed from 15 per cent to 40 per cent since 2019. This […]

  • 23 February 2023
    Grid Connection, Wind Farm Update

    Heerema Marine Contractors has installed the offshore substation topside for Iberdrola’s Baltic Eagle offshore wind farm in Germany. The substation topside, which was completed last month, was installed by Heerema Marine Contractors’ semi-submersible crane vessel (SSCV) Thialf. The jacket foundation had been placed on the construction site in October 2022. The installation involved the heaviest lifting […]

  • 22 August 2023
    Business & Finance, Floating Wind, Wind Farm Update

    Siravind, a consortium established by RES and Zephyr with an aim to build a floating wind farm in Norway, has already partnered with several companies for the project, including Smulders and Eiffage Métal for the serial production of floating wind foundations. In June, RES announced the consortium’s plans to bid for one of the three […]

  • 7 June 2018
    Wind Farm Update

    Heerema’s vessel Thialf has installed the jacket foundation for the EnBW Hohe See offshore substation (OSS) at the project site in the German North Sea.

  • 19 March 2018
    Ports & Logistics, Vessels

    Following the installation of its 1,600-tonne crane onboard Van Oord’s vessel Aeolus, Huisman has shared a video showing a summary of the works.