248 results
A list of search results
-
Grid Connection, Wind Farm Update
The foundation for the second Kriegers Flak offshore substation was installed on 22 February, a few days after Jan de Nul installed the first one.
-
Grid Connection, Wind Farm Update
Jan De Nul has installed the first of the two gravity-based foundations that will support the offshore substations on the 605MW Kriegers Flak offshore wind farm in the Danish Baltic Sea.
-
Grid Connection, Ports & Logistics, Vessels, Wind Farm Update
A barge loaded with two gravity-based foundations (GBFs) for the high voltage station of the 605MW Kriegers Flak offshore wind farm has arrived in Koge, Denmark, Blue Water Shipping (BWS), the port agents for the project, told Offshore WIND.
-
Ports & Logistics, Vessels, Wind Farm Update
A barge carrying two gravity based foundations (GBFs) for the high voltage station of the Danish 605MW Kriegers Flak offshore wind farm has left the port of Ostend, Belgium.
-
Business & Finance, Contracts & Tenders, Operations & Maintenance, Ports & Logistics, Wind Farm Update
Vattenfall has chosen Klintholm Harbour in Denmark as its base for the servicing and maintenance of the 605MW Kriegers Flak offshore wind farm.
-
Jan De Nul and Iemants have completed the two gravity-based foundations for Kriegers Flak substations. The steel structures, designed and built by Iemants (Smulders), have been placed on top of their corresponding concrete structures and the foundations are now being prepared to be transported from the port of Ostend in Belgium to Denmark by the end of December.
-
Contracts & Tenders, Grid Connection, Operations & Maintenance, Wind Farm Update
The first steel structure which will support one of Kriegers Flak offshore substations was placed onto the concrete section of the gravity based foundation (GBF) at the port of Ostend, Belgium, Jan De Nul said.
-
Contracts & Tenders, Technology, Wind Farm Update
UK-based cable protection systems specialist Tekmar Energy has won a contract to supply it’s Polyurethane J-tube bellmouths and cover disks for the HVAC transformer platforms on the 600MW Kriegers Flak project in the Danish Baltic Sea.
-
Contracts & Tenders, Grid Connection, Wind Farm Update
Hollandia Offshore and Croonwolter&dros have moved the Kriegers Flak B (KFB) offshore substation topside from Hollandia Offshore’s production hall in Krimpen aan den IJssel and into the yard.
-
Vattenfall is reconsidering building a 420MW offshore wind farm in the Swedish part of Kriegers Flak in the Baltic Sea as a result of recent cost reductions in offshore wind, the company told Offshore WIND.
-
Business & Finance, Contracts & Tenders, Grid Connection, Vessels, Wind Farm Update
Energinet and 50Hertz Transmission GmbH are seeking a jack up rig or a vessel capable of providing accommodation and other services for crew and personnel to be positioned next to an offshore substation on the Kriegers Flak offshore wind farm in the Danish Baltic Sea.
-
Energinet.dk and 50Hertz have selected Greece-based Assodivers for cable burial works at the Kriegers Flak Combined Grid Solution (CGS), a project that will interconnect Danish and German grids via Kriegers Flak and Baltic 2 offshore wind farms.
-
Contracts & Tenders, Vessels
Vattenfall has invited tenders for the provision of wind turbine installation vessels that will work on Kriegers Flak and the two nearshore projects, Vesterhav Nord and Vesterhav Syd.
-
Contracts & Tenders, Grid Connection, Vessels, Wind Farm Update
An export cable for the 600MW Kriegers Flak offshore wind farm made a successful landfall at Rødvig, Denmark, Energinet reports.
-
Danish subsea services provider JD-Contractor assisted the Copenhagen Police with a recovery of the 17-metre submarine – UC3 Nautilus – which sank in Koge Bay on Friday, 11 August, under suspicious circumstances.
-
Grid Connection, Vessels, Wind Farm Update
Danish crew transfer vessel (CTV) owner KEM Offshore has won a framework agreement for providing CTVs for the installation and commissioning of Energinet.dk’s two offshore substations on the Kriegers Flak offshore wind farm.
-
Contracts & Tenders, Grid Connection, Vessels, Wind Farm Update
Jan De Nul Group has taken delivery of the multipurpose vessel Adhémar de Saint-Venant which as of next week will start working on the Kriegers Flak OSS project in Denmark.
-
-
Authorities, Business & Finance, Contracts & Tenders, Grid Connection, Wind Farm Update
The European Commission has found support to be granted to the 600MW Kriegers Flak offshore wind farm in Danish territorial waters to be in line with EU state aid rules.
-
Business & Finance, Contracts & Tenders, Grid Connection, Operations & Maintenance, Vessels, Wind Farm Update
Danish transmission system operator Energinet.dk is looking for a provider of manned crew transfer vessels (CTVs) for the transportation of service crews between the harbors of Klintholm/Rødsand and the Kriegers Flak platforms KFA and KFB in the Baltic Sea.
-
Contracts & Tenders, Grid Connection
Transmission system operators Energinet.dk and 50Hz Transmission are looking for a provider of client representative services during unexploded ordnance (UXO) activities along the cable routes at the Kriegers Flak Combined Grid Solution (CGS).
-
Grid Connection, Wind Farm Update
Danish transmission system operator Energinet.dk, Fugro and subcontractor Boskalis have completed an unexploded ordnance (UXO) survey along the planned cable routes for a grid connecting the 600MW Kriegers Flak wind farm in the Baltic Sea. The survey was carried out in October 2016, Jens Christian Hygebjerg, Energinet.dk’s Chief Project Manager, Project Execution, told Offshore WIND. […]
-
Contracts & Tenders, Grid Connection
Energinet.dk has invited tenders for burial and protection of 150kV subsea cables at Kriegers Flak Combined Grid Solution (CGS). The works include burial and protection of approximately 2 x 24km of submarine cable route, which is to be divided into trenching and jetting work for the Krieger’s Flak CGS connection. The contract will also cover, inter alia, boulder […]
-
Contracts & Tenders, Grid Connection
Nkt cables has appointed VBMS for the installation of approximately 50km of 150 kV AC high-voltage submarine cables for the Kriegers Flak Combined Grid Solution (CGS). The project, owned by Energinet.dk and 50Hertz, will connect the future Danish offshore wind farm Kriegers Flak and the German offshore wind farm Baltic 2, both located in the […]
-
Business & Finance, Grid Connection, Wind Farm Update
Energinet.dk and 50Hertz Transmission GmbH have awarded Iemants and Jan De Nul Group with a contract to construct, install, ballast and protect gravity based foundations (GBFs) for two offshore substations. The two offshore substations will serve Vattenfall’s 600MW Kriegers Flak offshore wind farm in the Danish part of the Baltic Sea, and will also serve as an interconnector between […]
-
Authorities, Business & Finance, Contracts & Tenders, Grid Connection, Wind Farm Update
Swedish energy company Vattenfall has won the tender to build the 600MW Kriegers Flak offshore wind farm in the Danish part of the Baltic Sea with the lowest ever bid of EUR 49.9 per MWh, 58% below the original cap of EUR 120 per MWh. “The announcement is an essential milestone for our ambition to increase our production […]