Corell Services Joins Formosa 1 Team

UK-based Correll Services Ltd has secured a contract to provide subsea and land cable termination and testing works on the Formosa 1 Phase 2 offshore wind farm in Taiwan.

The contract has been awarded by Formosa 1 project turnkey contractor Jan De Nul Group.

Correll Services – a specialist in high voltage, low voltage and fibre optical engineering, installation and maintenance – will be in charge of project documentation, export cable (HV & FO) jointing at the TJB and OSS, array cable terminations (HV & FO) on 22 assets, and post-installation testing from the OSS to offshore assets.

Sam Dowey, Managing Director at Correll Services, said: “We feel privileged to have been selected by Jan De Nul Group to work alongside them on this very prestigious project. For us to be completing the cable T & T works on the first major offshore windfarm in Taiwanese waters, is a fantastic achievement. In association with our parent company, RTS Wind AG, we have opened a branch office in Taiwan and look forward to developing further business opportunities in the region.”

The 120MW Formosa 1 Phase 2 is being developed some 6 kilometres off the west coast of the Miaoli district in the Taiwan Strait. The wind farm comprises 20 Siemens Gamesa 6MW wind turbines scheduled to be operational in 2020.

Related news

List of related news articles

Posted: 2 months ago

FairWind Joins Siemens Gamesa on Formosa 1 Phase 2

FairWind has signed a Letter of Intent with Siemens Gamesa to collaborate on turbine pre-assembly fo...

Categories:
  • Business & Finance
Posted: 2 months ago
Posted: about 1 month ago

First Formosa 1 Phase 2 Blades Taking Shape

Siemens Gamesa has started producing the blades for the Formosa 1 Phase 2 offshore wind project in T...

Categories:
  • Wind Farm Update
Posted: about 1 month ago
Posted: about 1 month ago

FairWind Recruits Formosa 1 Prospects in Taiwan

FairWind is sending the first group of prospective Taiwanese wind turbine technicians to Europe this...

Categories:
  • Jobs & Recruitment
Posted: about 1 month ago
Posted: about 1 month ago

New London Joins Connecticut State Pier Team

The Connecticut Port Authority, Gateway Terminal and the City of New London have established a partn...

Categories:
  • Ports & Logistics
Posted: about 1 month ago