2112 results found for 'voltaire'

2112 results found for 'voltaire'
Order results by

A list of search results

  • 28 July 2011

    The Thanet offshore wind farm is the largest operational wind farm in the world. It consists of 100 turbines each with a 3MW generating capacity. The windfarm is located 11.3 km offshore from Foreness Point, in the North Sea. The WTG’s are interconnected by an offshore 33kV inter array cable network and connected to an […]

  • 7 February 2012
    Grid Connection

    DONG Energy, Fredericia (Denmark) and Nexans Deutschland have concluded a framework agreement for the delivery of up to 900 kilometres of medium-voltage submarine cables. Up until the end of 2015 (or, optionally, 2017), the Danish energy company will take delivery of up to 150 kilometres of high-performance cables every year for new offshore wind farms […]

  • 14 September 2010
    Grid Connection

    Contract value of around EUR 35 million. Preparation for construction of Gwynt y Môr offshore wind farm on schedule. RWE Innogy and nkt cables GmbH have today signed a contract for the manufacture and delivery of high-voltage sea cable for the Welsh offshore wind farm “Gwynt y Môr”. In total, nkt cables will produce around […]

  • 23 November 2021
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Siemens Energy will supply the main electrical equipment for the grid connection of Dominion Energy’s 2.6 GW Coastal Virginia Offshore Wind (CVOW) project in US federal waters. The wind farm will include up to 180 Siemens Gamesa’s SG 14-222 Direct Drive turbines standing slightly more than 800 feet tall and is the largest offshore wind […]

  • 18 September 2018
    Grid Connection, R&D, Technology

    Schneider Electric is launching a new 72.5kV variant of its WI switchgear range, developed to optimise the design, safety, cost and reliability of 72.5kV electrical systems in offshore wind farms.

  • 24 April 2018

    Roxtec has delivered a package of cable sealing solutions for the Beatrice offshore wind farm off Scotland, including fireproof and watertight seals to secure high voltage cables on the two transformer modules.

  • 13 May 2016
    Grid Connection, Wind Farm Update

    The 295MW Nordsee Ost offshore wind farm has generated one million megawatt-hours of electricity almost exactly a year after its full commissioning on 8 May 2015, RWE Innogy reports. “One year after the official opening of our wind farm, we have cracked the one million mark. I am proud because it shows that our systems can meet the planned targets and […]

  • 26 May 2011
    Grid Connection

      Equitix, Amp Capital and Balfour Beatty Consortium Appointed as Preferred Bidder for High-Voltage Link to Greater Gabbard Offshore Windfarm Green Energy Transmission (GET), a consortium comprising Equitix Ltd and AMP Capital Investors, together with Balfour Beatty Capital Limited has been selected by Ofgem E-Serve as the preferred bidder to own and operate the high […]

  • 16 November 2017
    Contracts & Tenders, Wind Farm Update

    Otary, the developer of Seastar and Mermaid offshore wind farms to be built off the coast of Belgium, is looking for EPCI contractor(s) for 225 kV XLPE submarine high voltage cables and connections between the wind farms’ substations and the Belgian modular offshore grid.

  • 21 July 2011
    Grid Connection

    The high-voltage submarine cable market is, by all definitions, a niche market with few purchasers and even fewer manufacturers and installers. The demand for these products is rapidly moving beyond the traditional role slotted for high-voltage submarine cables, connecting islands to nearby national grids. The usage of high-voltage submarine cables for grid interconnections and connecting […]

  • 29 August 2017
    Grid Connection, Wind Farm Update

    JD-Contractor, a danish subsea specialist, has won the contract for the cabling of the 28MW Nissum Bredning test and development wind farm off Denmark where Siemens Gamesa plans to utilise a range of new offshore wind solutions.

  • 4 July 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The fully assembled offshore substation for the 1 GW Thor offshore wind farm has been loaded out at HSM Offshore Energy’s Schiedam yard in the Netherlands. Both the jacket and the topside are now on the barges, and the structures are being prepared for sail-away to their destination off the Danish coast. In 2022, RWE, […]

  • 16 August 2018
    Grid Connection, Ports & Logistics, Wind Farm Update

    The Norther Offshore High Voltage Station (OHVS) built at the Hoboken yard of ENGIE Fabricom by the consortium partners ENGIE Fabricom, Smulders and CG, has set sail towards its destination in the Belgian North Sea.

  • 14 May 2014
    Grid Connection, Technology

    Siemens Smart Grid and distribution network operator Netze BW have started a joint project entitled “Distributed Grid Intelligence”. The project’s goal is to equip the power distribution grid in the Niederstetten region of Baden-Württemberg for the challenges of Germany’s transition to a new energy mix by implementing a distributed intelligence system. At the same time, […]

  • 31 March 2014

    The high voltage supply for LORC Nacelle Testing is being prepared with the construction of a new local substation ensuring a 33 kV supply for the offshore wind turbine test centre. Also, the high voltage supply cables have been installed at both ends and the remaining installation in the utility area of the test hall […]

  • 6 May 2011
    Business & Finance, R&D

      “There are two fundamental drivers behind the decision to collaborate,” says Kjell Eriksson, Director of the Energy Programme in DNV Research and Innovation, “The electrification of both conventional and subsea oil and gas installations, and the growth in offshore wind energy. Both drivers will require new solutions in relation to offshore power transmission.” The […]

  • 13 June 2012

    Nexans, a worldwide leading expert in the cable industry, has started the construction of its first high voltage power cable manufacturing plant in North America. Guests at the official ground-breaking ceremony held today at the site in Berkeley County, located in Charleston, South Carolina included the Honorable Nikki Haley, Governor of South Carolina, Fréderic Michelland, […]

  • 30 July 2020
    Grid Connection, Wind Farm Update

    The 700 MW Borssele Beta high voltage offshore platform is ready for use, the Dutch offshore transmission system operator TenneT said. The platform connecting offshore wind farms Borssele III & IV, and Borssele V to the Dutch grid was completed within budget and on schedule, according to TenneT. Blauwwind, the developer of Borssele III & […]

  • 29 January 2014
    Grid Connection, R&D

    Ecofys performed a Front End Engineering & Design (FEED) study for Navitus Bay Wind Park, which identified the most cost-efficient electrical infrastructure design. This takes the development of the offshore wind farm an important step further. The proposed Navitus Bay Wind Park is a joint venture between Eneco Wind UK Ltd and EDF Energy Renewables […]

  • 27 September 2011
    Grid Connection

    Ofgem E-Serve has today confirmed that TC Barrow OFTO Limited (Transmission Capital Partners) has secured a licence to operate the high voltage link to the 90 MW Barrow offshore wind farm, near Barrow-in-Furness. TC Barrow OFTO Limited has taken over ownership of the £33.6m link from Dong Energy and Centrica, owners of the wind farm […]

  • 13 November 2014
    Business & Finance, Grid Connection, R&D

    A recent report from Navigant Research analyzes the global market for high voltage transmission systems (HVTSs), including global market forecasts for revenue, segmented by technology and region, through 2023. Driven by rapid economic growth and electrification in China, India, and parts of the Middle East and Africa, the high voltage transmission system (HVTS) market is […]

  • 14 July 2016

    Following a three-day journey of Nordsee One’s substation platform from Aalborg, Denmark, a floating crane yesterday placed the 2,100-tonne substation onto a 50-meter tall foundation.  Matthias Esken, Package Manager for the substation, added: “I’m glad to report that the design and fabrication phase was successfully completed on schedule. With installation complete, we are now in the process of offshore […]

  • 4 May 2017
    Vessels

    NKT has held a naming ceremony for NKT Victoria, the company’s new cable-laying vessel which was part of the recently completed acquisition of ABB’s high voltage cable business, at its power cable plant in Karlskrona, Sweden.

  • 26 November 2018
    Contracts & Tenders, Grid Connection

    Boskalis and NKT have secured export cable contracts by 50Hertz for the Ostwind 2 offshore grid connection in Germany.

  • 11 November 2013

    Ingeteam will exhibit at EWEA Offshore 2013, the world’s largest offshore wind energy conference and exhibition that will take place in Frankfurt, Germany from 19-21 November. At the event, Ingeteam will be showcasing its electrical equipment for wind turbines up to 10 MW. The display at Stand 31D70 in Hall 3.1 will include a power […]

  • 10 May 2016
    Grid Connection, Wind Farm Update

    The foundation for the offshore substation of the 332MW Nordsee One offshore wind farm was installed in the German part of the North Sea on 9 May. After loading the piling hammer, the foundation was transported to the construction site approximately 40 kilometres north of the island of Juist, where a floating crane placed the jacket foundation weighing over 1,400 […]