10000 results found for 'turbine'

10000 results found for 'turbine'
Order results by

A list of search results

  • 16 February 2023

    Siemens Gamesa has installed the first of the three 115-metre blades on the SG 14-236 DD offshore wind turbine prototype at the Danish national test center for large wind turbines in Østerild. The SG 14-236 DD features a 236-metre diameter rotor, with a 43,500 m2 swept area, approximately the size of 6.1 standard football pitches. […]

  • 14 September 2010
    R&D

    Gamesa, a global leader in the manufacture and maintenance of wind turbines, continues to strengthen its position in China, where it will triple its investment through 2012 to expand and adapt its manufacturing centres for the development of its new turbine systems. Gamesa, which by 2009 had invested a total of 42 million euros on […]

  • 8 November 2021
    Contracts & Tenders, Technology

    Vattenfall has named Siemens Gamesa the Preferred Supplier of wind turbines for the 1.8 GW Norfolk Boreas and the 1.8 GW Norfolk Vanguard wind farms offshore Norfolk, UK. The agreement includes the potential deployment of the new SG 14-236 DD offshore wind turbines and a multi-year Service agreement. The agreement is subject to the UK […]

  • 24 January 2023
    Wind Farm Update

    Italy-based company Mazar Wind Srl has requested a maritime concession for a floating offshore wind farm off the Sicilian coast. The project is planned to comprise 74 wind turbines and four offshore substations. The floating wind farm is proposed to be built in the stretch of sea off Mazara del Vallo, at a minimum distance […]

  • 3 July 2017
    Operations & Maintenance, Vessels

    Some 1,500 offshore wind turbines have come out of their warranty and, as the offshore wind farm developers/ owners are now responsible for keeping them up and running, this is a whole new era for the industry, according to Bert van Dijk, Business Advisor Offshore Wind from Van Dijk E-Projects. 

  • 28 February 2011
    R&D

    Vertical axis wind turbines could provide a credible alternative to traditional horizontal offshore turbines in some circumstances, according to a project commissioned by the Energy Technologies Institute. The £2.8m Nova project, a UK-based consortia of Wind Power Limited, OTM Consulting, Cranfield University, , the University of Strathclyde, Sheffield University, James Ingram & Associates, CEFAS and […]

  • 17 April 2012
    R&D

    The global challenge in the field of energy is increasing. Prices on traditional fossil energy are increasing and governments are constantly looking for alternatives with a sustainable profile. This puts wind on the agenda as an energy source that is an operational alternative, and it demands for wind energy to become competitive compared with other […]

  • 19 May 2025
    Business & Finance, Contracts & Tenders, Supply Chain

    PGE Polska Grupa Energetyczna (PGE) and Ørsted have signed a contract with Smulders for the manufacturing of suspended internal platform cages for the 1.5 GW Baltica 2 offshore wind farm in Poland. The additional steel structures for the foundations allow operational crews access to the wind turbine and the distribution box for technical interventions. The […]

  • 24 April 2013
    Authorities

    The EUROGATE Container Terminal Bremerhaven got high-profile visitors from New Bedford in the US state of Massachusetts. The 26-strong delegation from this small port city on the East coast was led by mayor Jonathan Mitchell. Most of the delegates work in urban and harbour development for the city of New Bedford and in research enterprises […]

  • 4 November 2013
    Technology

    After a successful initial study to validate their tidal turbine design software Tidal Bladed, GL Garrad Hassan are preparing for the next phase of full scale validation, under the Reliable Data Acquisition Project for Tidal (ReDAPT) project. Tidal Bladed is a commercial software package which can be used to calculate the performance of, and loading […]

  • 28 October 2019
    Training & Education

    The Port of Blyth is installing a bespoke wind turbine training facility at its Bates terminal as part of a GBP 1 million investment in training provision aimed at the offshore energy sector. This investment has enabled this UK East coast port, through its training arm Port Training Services, to purchase, modify and install a […]

  • 1 September 2016
    Vessels, Wind Farm Update

    The charter of A2SEA’s M/V Torben ended on 15 August without the company’s crew being able to complete the installation of two foundations and two Siemens 4MW turbines at the Formosa 1 pilot project in Taiwan. The installation of the two foundations and the two turbines was initially scheduled to start in June 2016. The A2SEA project […]

  • 28 May 2025
    Business & Finance, Contracts & Tenders, Equipment, Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    PGE Polska Grupa Energetyczna (PGE) and Ørsted have signed a contract with Grupa Przemysłowa Baltic for the production and delivery of additional secondary steel structures for the Baltica 2 foundations that will be installed in the Polish Baltic Sea. Grupa Przemysłowa Baltic will manufacture the platforms for mooring service vessels and anode cages in the Gdańsk […]

  • 27 December 2010
    Business & Finance

    Wind Turbine Market Analysis to 2015 – Global Capacity, Equipment Market Size and Market Share, Regulatory Framework and Cost Analysis ; The report provides an in-depth analysis of global, regional and key countries wind turbine market. This alternative energy research report gives historical and forecast statistics for the period 2001-2015 for market size of the […]

  • 21 May 2025
    Floating Wind, Foundations, Supply Chain, Technology

    DNV has awarded the basic design certificate to BW Ideol for its floating wind platform that can support wind turbines with an output of 15 MW and beyond. BW Ideol says this certification marks a key milestone in the company’s industrial roadmap and confirms the technical soundness of the platform, which is designed for large-scale […]

  • 14 February 2011

    Research and Markets has announced the addition of the “Global & China Wind Turbine Market By Offshore/Onshore Type, Geography, Installed Capacity, Price Trends & Forecasts (2010 2015)” report to their offering. Global & China Wind Turbine Market The energy demand from renewable source has been rising in this decade. Global Wind turbine cumulative installed capacity […]

  • 8 February 2011
    Technology

    UK Wind Energy Services company, Gaoh Offshore announced the signing of a Letter of Intent covering the design development and construction… (tos) [mappress] Source: tos, February 08, 2011

  • 11 June 2010

      Wind turbine rotor blades are extremely fragile structures, created by combining materials with critical interconnections between sub-components. In addition, they are subjected to highly demanding forces during their operational life. Wind turbine blade failures can have a severe impact on safety, turbine downtime and public exposure. This event, dedicated solely to the topic of […]

  • 19 June 2025
    Business & Finance, Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    Ventyr, a consortium consisting of Parkwind and Ingka Investments, has awarded Worley Rosenberg a preferred contractor agreement for the development of the offshore substation of the Sørlige Nordsjø II (Southern North Sea II) offshore wind farm in Norway. In addition to the preferred contractor agreement, Worley Rosenberg also signed an early works agreement for design […]

  • 18 March 2024
    Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    Wind turbine installation is expected to start soon at Ørsted’s Borkum Riffgrund 3 and Gode Wind 3 offshore wind farms in Germany as Seaway7’s newbuild Seaway Ventus, which has been hired to do the work, arrived in Europe. Seaway Ventus was built by China Merchants Heavy Industry (CMHI) at its shipyard in Nantong, Jiangsu province, […]

  • 22 February 2011

    Gamesa, a world-leading wind energy company, continues to advance its offshore wind strategy, having signed an agreement to supply energy company E.ON with an offshore prototype of its G11X-5.0 MW platform in 2012. The agreement also includes the installation of one, and possibly two, Gamesa G128-4.5 MW wind turbine(s) for an E.ON site in Europe. […]

  • 20 December 2022
    Industry

    Governments need to move from talking about policies to implementation, the offshore wind industry needs to employ standardisation, and clear rules and regulations need to be set for green hydrogen in order to move faster with large-scale deployment and achieve meaningful progress in limiting global warming to 1.5 degrees Celsius. The recently held COP27 showed […]

  • 26 August 2013
    Business & Finance, Operations & Maintenance

    It is no wonder that some wind energy companies are reluctant to hire new employees on a long-term base. Not only is the policy always sending mixed signals on the future of the wind energy, but the network operators are also facing difficulties to connect the wind turbines on time. This means that the high […]

  • 24 June 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    A short geotechnical survey is scheduled to begin at the Dogger Bank D offshore wind farm site in the UK this month. The offshore supply vessel (OSV) Connector will be deployed to carry out the work within the array area and the export cable route. The works will be performed in a single campaign, expected […]

  • 5 June 2025
    Floating Wind, Project Updates, Wind Farm Update

    The 25 MW Provence Grand Large, the first floating offshore wind farm in France and the wider Mediterranean, has been fully commissioned. The floating offshore wind project is owned by Parc Eolien Offshore de Provence Grand Large – a subsidiary of EDF Renouvelables, Enbridge Eolien France 2 S.à.r.l (EEF2), a subsidiary of Enbridge Inc., and […]

  • 22 January 2014
    Training & Education

    Avanti has built a training tower for effective training anytime. A working turbine must be stopped in order for technicians to work or train in the tower, thus increasing downtime costs, unlike the new training tower which can be used without costly downtime. The new training tower is built at Avanti Wind Systems ladder factory, […]