10000 results found for 'park'

10000 results found for 'park'
Order results by

A list of search results

  • 4 December 2020
    Wind Farm Update

    Asso.subsea has completed the boulder removal campaign for the Kriegers Flak offshore wind project in the Danish Baltic Sea. ASSO was responsible for the boulder clearance of 68 turbine installation locations for jacking operations and all related MBES & SSS surveys, approximately 3500 targets in total. The operations were executed in two campaigns, the first […]

  • 29 October 2020
    Contracts & Tenders, Wind Farm Update

    Offshore marine and engineering consultancy company Waves Group has won the Marine Warranty Surveyor (MWS) contract on the 1.5 GW Hollandse Kust Zuid wind farm in the Dutch North Sea. Owned and developed by Vattenfall, the wind farm will comprise 140 Siemens Gamesa 11 MW wind turbines which will be connected to two 700 MW […]

  • 22 September 2020
    Business & Finance, Wind Farm Update

    Swancor Renewable Energy has revealed plans to develop the 4.4 GW Formosa 4 offshore wind project off the Miaoli County in Taiwan. The portfolio would consist of three sites, including Formosa 4-1, Formosa 4-2 and Formosa 4-3, which would cover a large maritime area located 18 to 20km offshore. Swancor Renewable Energy said it had […]

  • 11 August 2020
    Grid Connection, Wind Farm Update

    Prysmian has started installing the export cables which will connect the 480 MW Saint-Nazaire offshore wind farm to the French grid. The Italian cable manufacturer deployed its cable-laying vessel Cable Enterprise on the project. The cable pull-in operations started off the Courance beach on Sunday, 9 August, Réseau de Transport d’Électricité (RTE), the French transmission […]

  • 23 January 2020
    Vessels

    DEME Group’s DP3 offshore installation vessel Orion has undergone the first liquid natural gas (LNG) bunkering. The world’s largest LNG bunker vessel Kairos, operated by Nauticor, supplied Orion with LNG at the Port of Rostock in Germany. According to DEME, this marks only the second ship-to-ship LNG bunkering operation to take place in Germany and […]

  • 27 July 2020
    Authorities, Grid Connection, Technology, Wind Farm Update

    ScottishPower Renewables has applied for a non-material change to the East Anglia THREE Offshore Wind Farm Order 2017 which would allow the project to take advantage of advancing technologies and deliver a reduction in levelised energy costs. The application, submitted by East Anglia Three Limited, seeks to reduce the number of offshore substations from six […]

  • 7 November 2019
    Business & Finance

    GE Renewable Energy has officially inaugurated the LM Wind Power blade factory in Cherbourg, France. The facility will provide the manufacture of the 107m long blades for the Haliade-X 12MW offshore wind turbine, as well as other blade models. According to GE, production started in early 2019 and five blades have already been delivered for […]

  • 6 November 2019
    R&D

    Innovate UK is inviting Expressions of Interest (EoI) from companies to apply for a share of up to GBP 1.5 million from a bilateral offshore wind R&D program with the U.S. Innovate UK will invest in UK companies partnering with U.S. consortia to work on projects as part of the USD 40 million U.S. National […]

  • 4 April 2018
    Grid Connection, Wind Farm Update

    Energinet has resumed onshore cable installation works for the Kriegers Flak offshore wind farm after the winter break, and is now ready to start with the final stage of cable excavation on land.

  • 12 February 2018
    Authorities, Contracts & Tenders, R&D

    The results of the call for offshore wind tenders in the Dunkirk area in France will be released in March, said French Secretary of State Sébastien Lecornu.

  • 8 February 2018
    Grid Connection, Wind Farm Update

    The fourth and final Siemens Gamesa 7MW wind turbine was installed at the Nissum Bredning site in January, with cabling works now well underway and expected to be completed soon, according to the project’s social media page. 

  • 30 August 2018
    Business & Finance

    MHI Vestas Offshore Wind has appointed Julian Brown as its UK country manager.

  • 23 August 2018
    Grid Connection, Wind Farm Update

    On the evening of 22 August, the offshore high-voltage station (OHVS) for Belgian Norther offshore wind farm was placed on top of its monopile foundation that was installed earlier at the project site located some 23km off the port of Zeebrugge.

  • 18 December 2017
    Operations & Maintenance, R&D, Wind Farm Update

    SGS Germany has awarded the 402MW Veja Mate offshore wind farm with the project certificate, marking the wind farm’s final milestone.

  • 22 November 2017

    We are slowly approaching the end of the year. A good moment to look back at the developments of last year and look forward to 2018. 2017 was a turbulent year for the maritime, offshore and energy sector in Holland and beyond, and will keep posing challenges in 2018. Precisely because of these developments, it will be even more important for the industry to ensure that technical and nautical expertise remains in this sector.

  • 7 November 2018
    R&D

    The University of Massachusetts Dartmouth’s School for Marine Science and Technology (SMAST) is hosting four workshops with the fishing industry to identify priorities for the assessment of impacts offshore wind has on fisheries and ecological conditions.

  • 15 October 2018

    Keeping pace with offshore wind is not only on top of the list for the supply chain that delivers its products and services to the fast-growing industry, but also for the sector in its entirety in terms of people working in it and the need for (more) offshore wind professionals. 

  • 29 November 2018
    Business & Finance, Wind Farm Update

    The Moray Offshore Windfarm (East) Limited consortium has secured financing for the construction of its 950MW offshore wind farm in the Outer Moray Firth, Scotland.

  • 11 May 2018
    Grid Connection, Wind Farm Update

    Although the Rampion offshore wind farm is at a stage of looking at full commissioning, the project site recently saw boulder clearance and UXO identification works starting along one of its export cable routes, since the Rampion team has been replacing the initially installed export cables after identifying issues that would have affected the wind farm’s performance and longevity. 

  • 7 June 2018

    E.ON has revamped the Scroby Sands Offshore Wind Farm Visitor Centre in Great Yarmouth, the UK.

  • 1 June 2018
    R&D, Technology, Vessels

    Heerema Marine Contractors and CAPE Holland have installed a Delft Offshore Turbine (DOT) monopile at the site of Eneco’s Princess Amalia offshore wind farm (Prinses Amaliawindpark) by using a Vibro Lifting Tool from Heerema’s vessel Aegir.

  • 12 March 2019
    Business & Finance

    Okeanus Science & Technology LLC has provided equipment to TerraSond in support of recent survey work at a wind farm offshore the U.S. East Coast. Okeanus provided slip ring winches and over-the-side pole and adapter for USBL mobilization, among other equipment, for the launch and retrieval of the A-Frame onboard TerraSond’s chartered vessel Gerry Bordelon. “Okeanus […]

  • 13 June 2019
    R&D

    The Imperial College London has conducted wind tunnel tests of energy kites, said to have helped the concept by Kite Power Systems (KPS) on its way to commercialization. Conducted by the Department of Aeronautics, the research is said to have produced data that helped KPS optimize its device to improve its efficiency and effectiveness, allowing it to […]

  • 25 February 2019
    Authorities, R&D, Technology, Wind Farm Update

    The European Commission has approved French plans to support four demonstration floating wind farms, one in the Atlantic Ocean and three in the Mediterranean. The projects include the Groix Belle Ile wind farm in the Atlantic Ocean, and the Golfe du Lion, Eolmed, and Provence Grand Large wind farms in the Mediterranean Sea. The demonstration floating wind […]

  • 4 February 2019
    Business & Finance

    The U.S. Bureau of Ocean Energy Management (BOEM) has set new dates for the public meetings regarding its Draft Environmental Impact Statement (DEIS) for the Vineyard Wind offshore wind project, which had previously been postponed due to the government shutdown. The first four meetings will be held in Massachusetts, with the first scheduled to begin on […]

  • 1 February 2019
    Wind Farm Update

    Van Oord’s jack-up vessel Aeolus is at MHI Vestas Offshore Wind’s pre-assembly site in Vlissingen to load the first turbine components for the Norther wind farm and install them in the Belgian North Sea. The wind farm comprises 44 MHI Vestas V164-8.4 MW wind turbines to be installed on monopile foundations some 22 kilometres offshore Zeebrugge. The […]