10000 results found for 'first'

10000 results found for 'first'
Order results by

A list of search results

  • 13 January 2016
    Authorities, Business & Finance

    WindEnergy Hamburg, a bi-annual trade fair for wind energy, and the annual conference of the European Wind Energy Association (EWEA) will continue to be held in parallel beyond the year 2016, that is in the even-numbered years, up to and including 2020. EWEA thus specifies a fixed venue for its annual conference in even-numbered years for […]

  • 24 October 2017

    GE Renewable Energy has published a photo showing its Haliade 150-6MW nacelles for the 396MW Merkur offshore wind farm being assembled at the company’s Saint-Nazaire site in France.

  • 18 September 2018
    R&D

    Siemens Gamesa has installed and commissioned the first prototype of the SG 8.0 167 DD offshore wind turbine in Østerild, Denmark.

  • 30 November 2021
    Business & Finance

    Keppel FELS, a wholly owned subsidiary of Keppel Offshore & Marine, has signed a global framework agreement with Ørsted to potentially undertake future offshore substation (OSS) projects. The agreement follows Keppel Offshore & Marine’s completion of its first project for Ørsted in Singapore in September, when the company finished construction of two offshore substations for […]

  • 21 September 2020
    Operations & Maintenance

    Germany’s HTM Helicopters has ordered two H145 helicopters from Airbus Helicopters for offshore wind operations. HTM will be the first operator to use the new five-bladed H145 helicopter in the offshore wind segment, according to Airbus Helicopters. “We thank HTM for their continued trust in Airbus Helicopters and our products,” said Thomas Hein, Head of […]

  • 17 August 2020
    Vessels

    Gulf Marine Services’ jack-up vessel GMS Endeavour is set to be deployed at the Moray East offshore wind farm site to support the commissioning of the project’s offshore transformer platforms. The vessel will arrive at the project site on or around 19 August, from when it will provide accommodation for workers carrying out commissioning works […]

  • 26 December 2016
    Business & Finance, Vessels

    Jiangsu Longyuan Zhenhua Marine Engineering has ordered a wind turbine installation vessel (WTIV) at Shanghai Zhenhua Heavy Industries (ZPMC). The wind turbine installation vessel will be 101 metres long, 43 metres wide, with a draft of 8.4 metres. The vessel will have a lifting capacity of 2,000 tons and will be delivered in 2018, ZPMC said. This is the […]

  • 22 August 2016

    Amrumbank West’s meteorological mast was removed from the site in February 2016, as reported by SGS, a Hamburg-based inspection and certification company that supervised the decommissioning at the 302MW offshore wind farm. Prior to the dismantling, the met mast had been gathering data on wind conditions at the site since April 2005, when it was installed by Hochtief and Germany-based […]

  • 8 November 2018
    Authorities, Business & Finance

    Poland plans to develop 8GW of offshore wind energy in the Baltic Sea by 2035 and will soon pass a law to this effect, Polish State Secretary for Energy, Grzegorz Tobiszowski, said.

  • 20 September 2018
    Contracts & Tenders, Wind Farm Update

    Nordwest Assekuranzmakler GmbH & Co. KG (NW Assekuranz) has provided insurance for the 21MW Sprogø offshore wind farm in Denmark on behalf of the Copenhagen-based European Energy Group AS. 

  • 28 December 2018
    Business & Finance, Wind Farm Update

    Japanese utility JERA has entered into an agreement with Macquarie Capital and Swancor to acquire a combined 32.5% equity interest in the Formosa 1 offshore wind power project located off the north-western coast of Taiwan.

  • 13 May 2019
    Grid Connection

    The second cable that will connect the Borssele Alpha offshore high voltage substation in the Dutch North Sea to the transformer station at Borssele has made landfall, according to TenneT. Boskalis Subsea Cables & Flexibles, former VBMS, and NKT are in charge of supplying, delivering and installing two 61km long export cables for the Borssele Alpha […]

  • 30 August 2015

    First Gemini Offshore Substation in Place (11 Photos) The first offshore transformer station at the Gemini offshore wind farm was placed on top of the jacket foundation. World’s Largest Floating Turbine Sails Out “Fukushima Shimpuu”, the largest floating offshore wind turbine in the world, left Onahama port on July 28th and arrived at the testing […]

  • 3 September 2015
    Business & Finance, Technology

    Ole Jacob Wang Nielsen has joined High Wind NV as Head of Business Development. He will continue the commercialisation of the Boom Lock which allows for safe installation of wind turbine components in higher wind speeds. Ole Jacob has worked in the maritime industry since 2001 and brings with him 8 years of offshore wind experience […]

  • 19 February 2019
    Business & Finance

    MHI Vestas has reached a milestone for its V164 turbine model with the installation of the 200th unit. According to MHI Vestas, the milestone turbine has been installed at the Norther offshore wind farm in Belgium. It is the fifth out of 44 8.4MW turbines to be installed at the 370MW project. Van Oord’s installation vessel Aeolus started […]

  • 13 December 2016
    Vessels

    Damen Shipyards Galati has completed the bow of Bibby Wavemaster 1, the first ever Damen Service Operations Vessel (SOV) ordered by Bibby Marine Services, and moved it from the covered shed to alongside the quay from where the SOV will be launched.  The vessel is being built in two main sections. The aft section is being finished and will […]

  • 9 August 2012
    Business & Finance, Grid Connection

    KfW, German state development bank, published yesterday its results for the first half of 2012 and revealed its future plans.  Under the KfW Action Plan to support the energy turnaround, the bank plans to extend loans to EUR 100 billion for renewable energies and energy efficiency in the next five years. In its further financial […]

  • 18 June 2014

    Commenting on yesterday’s announcement of consent for East Anglia One offshore wind farm, the first round three site in English and Welsh waters and the largest site consented in the UK, Ben Stafford, Head of Public Affairs at WWF-UK said yesterday: “Today’s decision is a strong vote of confidence for the UK’s offshore wind sector. […]

  • 4 January 2013
    Authorities, Business & Finance

    Fishermen’s Energy welcomes the news that Congress has extended the Investment Tax Credit (“ITC”). “The announcement of an Investment Tax Credit (“ITC”) extension, coupled with the recent Department of Energy award to Fishermen’s Energy, will allow New Jersey to capture the economic benefits of offshore wind at a significantly lower cost” commented Rhonda Jackson, Communications […]

  • 19 June 2013

    Alicat Workboats and South Boats IOW will be joining forces for the first time at next week’s Seawork International event in Southampton.  The companies will have their latest boats on display and it is the perfect opportunity to come aboard, have a good look around and maybe go out on a VIP trip to see how they […]

  • 1 November 2017
    Vessels, Wind Farm Update

    A2SEA’s jack-up vessel Sea Challenger arrived at the Orange Blue Terminal in the Eemshaven port last night, 31 October, and will soon start installing transition pieces (TPs) at the Merkur offshore wind farm, Eemshavenonline.nl reports. 

  • 28 July 2023
    Business & Finance, Business development, Outlook & Strategy

    Fugro has reported a revenue of over EUR 1 billion for the first half of 2023, representing a 24.1 per cent growth from EUR 833 million in the first half of 2022, said to be due to continued high client demand in energy markets, in particular for offshore wind site characterization solutions and related nearshore […]

  • 28 October 2014
    Vessels

    Class-leading offshore energy support vessel operator Seacat Services today unveils Seacat Intrepid, the first DNV GL certified 26m-crew transfer vessel to profit from a unique workboat tank-testing programme. With preliminary sea trials now complete, the official unveiling of Seacat Intrepid marks a turning point in the evolution of workboat craftsmanship and design. Seacat Intrepid is […]

  • 31 July 2012

    IBERDROLA, through its UK subsidiary ScottishPower Renewables, has taken the first step towards construction of the Wikinger offshore wind farm in Germany, the largest project of its kind located at such depth (over 40 metres). It has awarded two contracts, worth €18 million, to British company Gardline Group and GEO of Denmark, to conduct a […]

  • 27 July 2012
    Business & Finance

    The persistence of adverse economic and sector conditions continue to erode Gamesa’s results which, nevertheless, in 1H12 recovers operating profitability and initiates its deleveraging process ahead of schedule in 1H12 (initially slated for the second half), generating a net cash inflow of €100MM in 2Q12:  EBIT of €3MM (EBIT margin: 0.2%), this rises to €12MM […]

  • 8 October 2012
    R&D

    On October 6th 2012, Siemens Energy has begun field testing of its new 154 m rotor for the 6-megawatt (MW) offshore wind turbine in Østerild, Denmark. The SWT-6.0-154 turbine is equipped with the world’s longest rotor blades – each blade is 75 meters in length. With a record rotor diameter of 154 meters, each SWT-6.0-154 […]