6473 results found for 'Gemini'

6473 results found for 'Gemini'
Order results by

A list of search results

  • 20 September 2011
    Technology

      REpower Systems SE (WKN 617703) is launching a system to harmonise wind farm management systems in September. The new REguard Interface B IEC 61400-25 is available now for all wind farms around the world in which REpower turbines are used. The system means that the various interfaces in a wind farm can be replaced […]

  • 8 September 2011
    Wind Farm Update

      The German Groups EWE and ENOVA have placed an order with G&G International in Willebroek worth 55 million EUR for the construction of Riffgat, a new offshore wind farm close to German Borkum. G&G International will deliver 30 gigantic foundation structures for offshore wind turbines between May and July 2012. It is the largest […]

  • 3 August 2011
    Operations & Maintenance, R&D

     The German plan to completely phase out nuclear power by 2022 announced May 30 by Chancellor Angela Merkel and the Christian Democratic… Andrew Burger (cleantechnica) [mappress] Source: cleantechnica, August 03, 2011

  • 13 May 2011
    Business & Finance

      According to provisional calculations REpower Systems AG (Prime Standard, WKN 617703) generated a total performance of EUR 1,275.7 million and recorded revenues of EUR 1,216.1 million. These figures correspond to a decline of 4.1% and 6.7% respectively compared to the same period of the previous year (total performance: EUR 1,330.4 million, revenues: EUR 1,303.6 […]

  • 4 April 2011
    R&D

    The European Union’s High Power, High Reliability Offshore Wind Technology (HiPRWind) project is looking into the development of up to 20 MW…   (reinforcedplastics) [mappress] Source: reinforcedplastics, April 04, 2011

  • 28 March 2011

    The European Union’s HiPRWind project hopes to produce floating offshore wind-turbines with more than double the production capacity of … (publicservice) [mappress] Source: publicservice, March 28, 2011

  • 15 August 2010
    Technology

    Palfinger has supplied 24 cranes for alpha ventus, Germany’s first offshore wind farm. A platform and nacelle crane on each wind turbine… (cranestodaymagazine) [mappress] Source: cranestodaymagazine, August 15, 2010;

  • 29 July 2010
    R&D

    Norbert Röttgen, German Federal Environment Minister, has thrown his backing behind developing more offshore wind farms in Germany. Röttgen announced today that offshore companies can rely on debt guarantees from the governemnt to secure the financing of “10 mega projects” in the North and Baltic seas up until the end of 2011. The announcement signals […]

  • 10 June 2010
    Wind Farm Update

    EnBW Erneuerbare Energien GmbH and Siemens Energy have today signed a contract for the supply of 80 wind turbines each with a capacity of 3.6 megawatts (MW) and a rotor diameter of 120 meters for the offshore wind farm EnBW Baltic 2. The order, which represents an investment volume in the triple-digit million range, marks […]

  • 29 April 2010
    Authorities, Business & Finance, Environment, Wind Farm Update

    AREVA’s Transmission and Distribution division and Dutch consortium partner Keppel Verolme B.V. have secured a €62 million order for an Offshore High Voltage Substation project with Wetfeet Offshore Windenergy GmbH, a German wind energy project development company and AREVA T&D partner. This turnkey project involves the supply and installation of a self-floating, self-installing 155/33 kV […]

  • 14 May 2013

    The terminal operator, Cuxport, handled a major order for the wind turbine manufacturer REpower Systems SE between the end of February and the middle of May – and completed it without making any errors at all. Cuxport transhipped 22 tower segments, which were manufactured at AMBAU in Cuxhaven. The components are earmarked for 11 offshore […]

  • 18 April 2013

    After already manufacturing the foundations for the OWF EnBW Baltic 1, EEW Special Pipe Constructions GmbH has now also been appointed with the delivery of 123 Pin Piles (Lot 2) as well as 39 Monopiles and Transition Pieces (Lot 3) for EnBW Baltic 2. The MPs/TPs will be manufactured in a joint venture with Bladt […]

  • 11 April 2013

    DONG Energy and Siemens AG have entered into agreements securing potential supplies and servicing of a total of 154 offshore wind turbines of 6 megawatt each, giving a total capacity of 924 megawatt. The agreements give DONG Energy the option to install the turbines on its Gode Wind projects in Germany from 2015. Utilisation of […]

  • 5 April 2013
    Grid Connection, Technology

    The demand for the so-called hybrid cables for converter platforms of offshore wind farms and on board vessels is ever more increasing. In addition to the conventional copper wires, the cables combine numerous other components, such as pneumatic and hydraulic hoses, flexible coaxial cables or optical waveguides. “All in one” hybrid cables are space-saving, easily […]

  • 2 April 2013

    The hull is complete, the steelwork concluded, the building of the deckhouse has begun – in the dock of Sietas shipyard the first jack-up vessel for offshore wind farms developed and constructed in Germany is currently taking shape. Construction started in April 2012; the handover of the ship to the client, the renowned Dutch marine […]

  • 26 March 2013
    Environment

    MMT (Sweden) has been appointed by Siem Offshore Contractors GmbH to conduct a pre lay survey and ROV inspection of the IAG at the Baltic 2 Offshore Wind Park. This project is now ongoing and MMT uses the survey & ROV vessel IceBeam, equipped with a Kongsberg EM2040 Dual Head Multibeam and a Sub-Atlantic Mohican […]

  • 15 March 2013

    One of the world’s largest installation vessels, Oleg Strashnov, is in Cuxhaven since Tuesday, waiting to load components for a wind farm northwest of Helgoland. A total of six transition pieces (TPs) will be loaded onto the vessel, after which they will be installed at the Meerwind Süd/Ost offshore wind farm. The HWG members, Ambau […]

  • 27 February 2013

    The global wind energy industry will meet once again at the Wind Trade Fair the HANNOVER MESSE 2013 (from April 8 to April 12). All major manufacturers, suppliers, logistics providers, operators, service providers and measurement services, energy businesses, research institutions and developers from the wind industry will be present. They will show the latest concepts […]

  • 10 February 2013
    Business & Finance

    International legal practice Norton Rose has advised a consortium of banks led by KfW IPEX-Bank, UniCredit and Bremer Landesbank on the financing of the offshore wind farm Butendiek in the North Sea. The consortium finances this large-scale project with loans in the total amount of approximately €855m; the overall investment volume is about €1.3bn. The […]

  • 12 December 2012
    Business & Finance

    In June 2012 the creditors’ committee voted in favour of an offer by the VeKa Group of the Netherlands to take over the Sietas shipyard. Despite six months of intensive negotiations, it was not possible to complete the deal. The reason is that the Sietas shipyard currently has only one order for a new construction, […]

  • 7 December 2012
    Business & Finance, Grid Connection

    Offshore Marine Management (OMM) signs several contracts with cable suppliers and installers for upcoming Offshore Wind Interconnector installations.  In the beginning of 2012, OMM signed several contracts with cable suppliers and installers for the upcoming Offshore Wind Interconnector installations (BorWin2, HelWin1, Dolwin1, SylWin1, Helwin2) for auxiliary works and supply and management of Guard Vessels. OMM […]

  • 28 November 2012
    Authorities, Grid Connection

    Parties of the German ruling coalition agreed yesterday to lower the limit on damages that grid operators must pay for delays when connecting offshore wind farms to the grid, Joachim Pfeiffer from the Christian Democratic Union told Bloomberg. The limit on damages when grid companies are found negligent was reduced to EUR 17.5 million from […]

  • 9 October 2012

    In little over a month, the first-ever Offshore Wind Energy Summit with an exclusive focus on grids, foundations and installation technology will take place in Hamburg, the principal location for offshore wind in Europe. More than 150 senior level wind industry executives – already comprised of 25 Utilities and 80 installation specialists – have begun […]

  • 13 April 2017
    Authorities, Business & Finance, Grid Connection, Wind Farm Update

    Germany’s Bundesnetzagentur has selected three offshore wind projects by DONG Energy and one project by EnBW in the first auction for grid connections and funding for existing offshore wind farm projects, with one of the operators offering the lowest price bid of 0.00 Euro cents per kilowatt-hour.

  • 21 September 2012
    Technology

    The rolling bearings for rotor shaft bearing arrangements are subjected to highly dynamic loads and operating conditions. Schaeffler develops solutions for rotor bearing arrangements for all modern wind turbine variants from 220 kW up to the current multi-megawatt class. The different concepts range from the classic 3-point shaft bearing arrangement and hub bearing arrangement up […]

  • 17 September 2012
    Wind Farm Update

    The first three tripod foundations for the offshore wind farm Global Tech I have been shipped with the INNOVATION heavy-lift jack-up vessel from Bremerhaven to the construction area. This will start the construction of the wind farm, which is located 180 kilometers north-west off Bremerhaven in the North Sea. The wind farm will contain 80 […]