10000 results found for 'turbine'

10000 results found for 'turbine'
Order results by

A list of search results

  • 2 February 2015
    Grid Connection

    JDR has extended its service support operations for the EnBW Baltic 2 offshore wind farm by Siem Offshore Contractors GmbH. Under a contract, JDR is providing pre-commissioning, test and termination services for the 80 turbine project in the Baltic Sea, off the coast of Rostock (Germany). JDR’s offshore wind test and termination team was commissioned to […]

  • 10 February 2025
    Contracts & Tenders, Fixed-Bottom, Operations & Maintenance, Supply Chain, Vessels

    Siemens Gamesa has selected LD Tide, a joint venture between Louis Dreyfus Armateurs and Tidal Transit, to supply a crew transfer vessel (CTV) for operations and maintenance work on the Îles d’Yeu and Noirmoutier offshore wind farm in France. The vessel, one of two CTVs currently being built by Strategic Marine, is scheduled to start […]

  • 16 March 2018
    Operations & Maintenance, Ports & Logistics, Wind Farm Update

    First eight jackets built by Lamprell for the 714MW East Anglia ONE offshore wind farm have arrived at the BOW Terminal in Vlissingen, the Netherlands.

  • 2 December 2020
    Technology

    Tractebel Overdick has developed a new floating wind foundation concept for 15+ MW wind turbines with a “hydrogen ready” option, and an offshore hydrogen production platform which can utilise the potential of large-scale offshore wind farms at an industrial scale of up to 800 MW. The new floater design is said to have been optimised […]

  • 16 May 2024
    Fixed-Bottom, Project Updates, Wind Farm Update

    The 500 MW Fécamp offshore wind farm, owned by Eolien Maritime France (EMF), a joint venture between the French company EDF Renouvelables; EIH S.à.rl, owned by Enbridge Inc. and CPP Investments; and Skyborn Renewables (formerly wpd offshore), is now fully operational. The inauguration ceremony was held by the project partners and Roland Lescure, French delegated […]

  • 24 February 2020
    R&D, Technology

    RWE Renewables and Saitec Offshore Technologies have joined forces to test new ways to install and operate offshore wind farms in deep waters. In a joint pilot project called “DemoSATH”, the RWE subsidiary specialising in renewable energy and the Spanish engineering company Saitec Offshore Technologies will start testing a floating platform for wind turbines off […]

  • 17 February 2023
    Wind Farm Update

    IberBlue Wind, the joint venture created to promote floating offshore wind farms in the Iberian Peninsula, has revealed its first project for Portugal – a floating offshore wind farm off the coast of Figueira da Foz. Called Botafogo, in honour of the Portuguese galleon that was built in the 16th century and became known as […]

  • 30 September 2022
    Wind Farm Update

    Swedish renewable energy developer OX2 has signed letters of intent with companies Kobb and Nordic Seafarm to investigate opportunities for large-scale cultivation of seaweed at its Galatea-Galene offshore wind farm in Sweden. Seaweed cultivation absorbs carbon dioxide from eutrophication such as nitrogen and phosphorus from the sea and is circulated back to land as food, […]

  • 2 February 2016
    Authorities, Business & Finance, Environment, Grid Connection, Operations & Maintenance, R&D, Technology, Training & Education, Vessels, Wind Farm Update

    Sea Worker Runs Aground off Denmark, Crew Evacuated Offshore installation vessel Sea Worker ran aground south of Denmark’s Hvide Sande on the night between 26 and 27 January while under tow to Esbjerg, A2SEA said in a statement. Umoe Ventus Sinks After Catching Fire off Langeland The Wave Craft Surface Effect Ship Umoe Ventus sank yesterday […]

  • 13 June 2012

    IBERDROLA has announced it is commencing the detailed engineering phase of Wikinger, the company’s first offshore windfarm in Germany, with a view at starting operations on the €1.6billon project by 2016. UK based engineers, project managers and technicians from IBERDROLA’s Offshore Business Division, based in Glasgow and London will have a crucial role in the […]

  • 28 May 2013

    Three months after opening the new prototype production facility in Sassnitz/Mukran on the island of Rügen, Germany, independent rotor blade designer and manufacturer EUROS delivers its first offshore blade to the customer Mitsubishi. This type of rotor blade with a length of 81.6 m and a mass of 32.5 tons will operate on Mitsubishi’s “Sea […]

  • 6 September 2023
    Contracts & Tenders, Fixed-Bottom, Ports & Logistics, Project Updates, Supply Chain, Wind Farm Update

    Moray West has selected the Port of Nigg in the Cromarty Firth, Scotland, as the location for marshalling all 62 transition pieces (TPs) prior to installation as part of the 882 MW offshore wind farm. Moray West has signed an agreement with Global Energy Group (GEG), which owns and operates the Port of Nigg, to […]

  • 27 March 2013
    Grid Connection

    Ballast Nedam has signed a contract for the installation of foundations at the German EnBW Baltic 2 offshore wind farm with ARGE BALTIC 2 Foundations, a joint venture between HOCHTIEF Solutions AG, GeoSea N.V. and HOCHTIEF Offshore Crewing GmbH. Ballast Nedam will erect the project’s 39 monopile and transition piece foundations and provide the logistics […]

  • 22 January 2015
    Business & Finance, Wind Farm Update

    The Rt Hon Ed Davey, Secretary of State for Energy & Climate Change, today joined Siemens global executives to mark ground-breaking on wind turbine manufacturing and assembly facilities in Hull.  Mr Davey visited Hull’s Alexandra Dock to celebrate the beginning of construction on the site where Siemens will operate blade manufacturing, assembly and servicing facilities. […]

  • 20 August 2024
    Authorities, Business development, Floating Wind, Planning & Permitting, Research & Development

    The US State of Maine and the Federal Bureau of Ocean Energy Management (BOEM) have agreed on a floating offshore wind research lease in the Gulf of Maine, which could allow for the deployment of twelve floating wind turbines capable of generating 144 MW. The research lease site, an area of up to 15 square […]

  • 7 April 2017
    Business & Finance

    According to Bladt Industries’ 2016 annual results, the company saw a very favourable year with offshore wind projects as the main driver. Bladt reported a revenue increase from DKK 3 billion (approx. EUR 403 million) in 2015 to DKK 3.5 billion (approx. EUR 470 million) last year.

  • 17 January 2013

    NaiKun Wind Energy Group Inc. (the “Company” or “NaiKun Wind”) announced its financial results for the year ended September 30, 2012, a fiscal period during which the Company continued to explore ways to forward the NaiKun Wind Project while controlling its costs. A substantial restructuring effort was undertaken in fiscal 2010 and the Company has […]

  • 19 January 2012

    Windstream Energy has announced its decision to build Ontario’s first contracted offshore wind power project in the Hamilton area. At a press conference yesterday organized by the Lake Ontario Offshore Network, Windstream announced preliminary agreements with Bermingham Foundation Solutions, Walters Group, McKeil Marine and the Hamilton Port Authority to build its 300 MW Wolfe Island […]

  • 20 June 2014
    Business & Finance

    Van Oord is holding a two-day event along the Rotterdam Wilhelminakade quay to mark the entry into service of Aeolus, its first transport and installation vessel for the construction of offshore wind farms. Today, business relations have the opportunity to inspect the vessel. On Saturday 21 June, Mrs K. Aboutaleb-Erahoutan, wife of the Mayor of […]

  • 20 December 2021
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Nexans has won a turnkey contract with Ocean Winds to design, manufacture, install and protect the 220kV subsea and onshore export cable system for the Moray West offshore wind farm. The Moray West project is an 860 MW offshore wind farm in the outer Moray Firth, located off the northeast coast of Scotland. Nexans’ tailor-made […]

  • 2 September 2024
    Fixed-Bottom, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    China’s Dajin Heavy Industry has completed the final shipment of monopiles for the 488 MW îles d’Yeu and Noirmoutier offshore wind farm in France. Dajin Heavy Industry announced the delivery of the final shipment of 20 monopiles on their social media, marking the completion of all 61 monopiles. The monopiles have been loaded onto heavy […]

  • 4 July 2022
    Wind Farm Update

    The first wind turbine foundation at the Saint-Brieuc offshore wind farm has been installed, the developer Ailes Marines informed today, 4 July. Using Subsea 7’s Seven Borealis vessel, Van Oord installed the first jacket foundation, located in the northern part of the project site and has already started installing the second one in the same […]

  • 8 December 2022
    Vessels, Wind Farm Update

    CAPE Holland has announced that 56 jacket foundation pin piles were installed at the Ishikari offshore wind farm in Japan. From May to August 2022, the CAPE VLT-320 was used for the installation of 56 pin piles with lengths of 60 metres and a diameter of 2.5 metres for the Japanese offshore wind project. The […]

  • 16 January 2023
    Authorities, Contracts & Tenders, Wind Farm Update

    The Italian offshore wind developer, Regolo Rinnovabili, a subsidiary of BayWa r.e., has applied for a 30-year maritime concession to build and operate a 510 MW floating wind farm off the northwest of Sardinia. Regolo Rinnovabili submitted the application with the Guardia Costiera di Porto Torres to install 34 wind turbines with an individual capacity […]

  • 4 May 2023
    Contracts & Tenders, Wind Farm Update

    The Netherlands-based CAPE Holland has announced that its Vibro Lifting Technology was selected for the 882 MW Moray West offshore wind project in Scotland. The Moray West project, located in the North Sea, off the coast of Scotland, will utilise the CAPE Vibro Lifting Technology to install up to 62 monopiles in water depths ranging […]

  • 23 March 2023
    R&D, Wind Farm Update

    Equinor and Polenergia have completed geophysical and geotechnical surveys for the MFW Bałtyk II and MFW Bałtyk III offshore wind farms, located in the Polish Baltic Sea. The seabed surveys were carried out by a fleet of ten vessels owned by different contractors along a 1,000-kilometre section for the two wind farms with a total […]