10000 results found for 'turbine'

10000 results found for 'turbine'
Order results by

A list of search results

  • 8 April 2020
    Contracts & Tenders

    EnBW He Dreiht GmbH has issued a tender seeking the detailed design of the substructures and foundations of wind turbines for the 900 MW EnBW He Dreiht offshore wind project in the German North Sea. The contract scope covers the structural design of jacket and monopile foundations, electrical and mechanical design, and corrosion protection design. […]

  • 2 January 2020
    Wind Farm Update

    The structure comprises a floating platform developed by Principle Power and an MHI Vestas 8.4MW turbine, the largest wind turbine ever installed on a floating structure.

  • 20 December 2019
    Contracts & Tenders, Wind Farm Update

    The contract includes the supply and supervision of ten turbines delivered in 3.8 MW and three turbines delivered in 4.0 MW operating modes.

  • 21 October 2019
    Wind Farm Update

    The first WindFloat Atlantic platform with the turbine fully installed has set off from the Spanish Port of Ferrol towards its final destination 20 kilometres off the coast of Viana do Castelo in Portugal. Once at the final location, the three floating structures –stretching 30 metres in height and with a distance between each one […]

  • 16 August 2018
    Ports & Logistics, Vessels, Wind Farm Update

    Nine Siemens Gamesa 7MW wind turbines have so far been installed on the 588MW Beatrice offshore wind farm in the Outer Moray Firth, Scotland, Beatrice Offshore Windfarm Limited (BOWL) said.

  • 13 November 2018
    Authorities, Business & Finance

    India’s Ministry of New and Renewable Energy (MNRE), in consultation with the National Institute of Wind Energy (NIWE), has prepared a draft certification scheme incorporating guidelines for wind turbines.

  • 25 September 2018
    Technology

    The Offshore Renewable Energy (ORE) Catapult has launched an onshore LiDAR verification service at its Levenmouth turbine in Fife, UK.

  • 28 May 2018
    Technology, Wind Farm Update

    Jack-up vessel Bold Tern installed the eleventh MHI Vestas 8MW wind turbine on Ørsted’s Borkum Riffgrund 2 wind farm in the German North Sea on 26 May, which was the 100th MHI Vestas V164 turbine model to be installed worldwide. 

  • 23 April 2019
    Operations & Maintenance, Technology

    SeaRoc Group has launched a new, fully portable communications solution that allows technicians to communicate from within a wind turbine. As radio signals are not able to be detected from within the confines of the turbine because of the metal structure, this can create a challenge for offshore wind farm maintenance. SeaRoc’s new solution enables […]

  • 12 April 2019
    Technology

    The Spanish EnerOcean has launched its floating wind turbine prototype W2Power at the Astican Shipyard in Gran Canaria. W2Power, built and assembled at the Astican Shipyard, will be installed at the PLOCAN offshore test site in the coming weeks, project partner Ghenova said. According to the company, sea trials in a real environment are the next […]

  • 27 March 2019
    R&D

    Wind turbines rated 8MW or higher comprised more than 40% of offshore order capacity in 2018, with MHI Vestas accounting for 64% of this ratings segment, according to new research by Wood Mackenzie Power & Renewables. The Global Wind Turbine Order Analysis: Q1 2019 report writes that the industry announced almost 8GW of offshore order capacity in 2018, […]

  • 21 January 2019
    Wind Farm Update

    Fred. Olsen Windcarrier’s jack-up vessel Brave Tern has installed the last turbine at the Horns Rev 3 offshore wind farm in Denmark. The jack-up vessel loaded the final batch of the MHI Vestas units destined for the 406.7MW project on 10 January at the Port of Esbjerg. Offshore construction began back in July last year when the […]

  • 18 June 2020
    Ports & Logistics, Wind Farm Update

    Global Wind Service (GWS) has completed the load-out of the wind turbine components for the Coastal Virginia Offshore Wind (CVOW) pilot project in the US. All turbine parts have now been loaded onto Jan De Nul’s jack-up Vole au vent at the port of Halifax in Canada and the vessel is now on her way […]

  • 8 July 2019
    Operations & Maintenance, Wind Farm Update

    Siemens Gamesa has taken over operational control of the scheduled maintenance and troubleshooting of turbines at the Beatrice offshore wind farm in the UK, according to the project’s latest Weekly Notice of Operations. Siemens Gamesa has engaged crew transfer vessels (CTVs) Seacat Mischief and Seacat Magic, as well as WIKING Helicopter’s Airbus H145 to assist in the […]

  • 9 August 2019
    Wind Farm Update

    25 out of 33 MHI Vestas 8.4MW turbines have been installed at the Deutsche Bucht offshore wind farm in Germany, according to Northland Power. The company emphasized that the construction of the project is progressing according to schedule and is on budget. Deutsche Bucht produced first power to the German grid at the end of July, when the […]

  • 24 July 2019
    Wind Farm Update

    Jan De Nul’s offshore installation vessel Taillevent has begun loading the first turbine components for the Trianel Windpark Borkum II (TWBII) offshore wind farm. The 200MW TWBII offshore wind farm will comprise 32 Senvion 6.2M152 turbines installed at the project site some 40km north of the island of Borkum in Germany. Taillevent loaded the first three towers, blades […]

  • 6 November 2014
    Business & Finance

    Siemens released its financial figures for the fourth quarter and fiscal year 2014 today, reporting that its fourth-quarter profit in the Energy Sector declined to €403 million, as ongoing challenges within the Sector led to lower results year-over-year. A year earlier, fourth-quarter profit of €564 million was burdened primarily by €151 million in “Siemens 2014” charges. […]

  • 1 October 2014

    Havvind Aarhus Bugt (HAB) selected Siemens as a preferred supplier for the wind energy project off east Jutland, Denmark. The German manufacturer confirmed they are in talks with the developer of the 80MW Mejlflak over the possible deal to deliver twenty 4MW offshore wind turbines for the project. The negotiations are expected to be completed […]

  • 26 February 2015
    Business & Finance, Technology

    RenewableUK commented today on the release of Offshore Renewable Energy (ORE) Catapult’s ‘Cost Reduction Monitoring Framework’ on behalf of the Offshore Wind Industry Council. This is the most substantial and comprehensive look at what progress is being made in reducing offshore wind costs. A backward look at how costs have fallen between 2011 and 2014, the […]

  • 17 February 2015
    Business & Finance, Technology

    SCHOTTEL HYDRO has launched a new turbine generation, SIT SCHOTTEL Instream Turbine, which allows the harvesting of hydrokinetic energy for commercial projects. SIT features passive-adaptive composite blades with no need for any active pitch mechanism. Its drive train is standardized with a two-stage planetary gearbox and an induction generator. The ambient water ensures a steady […]

  • 5 December 2014
    R&D

    The Offshore Renewable Energy (ORE) Catapult’s Marine Farm Accelerator (MFA) initiative, in collaboration with Carbon Trust, may shortly launch a competitive design competition. The objectives of the competition are to reduce the cost of the installation processes for seabed mounted tidal turbine foundations and to standardise the mechanical interface between the foundation structure and turbine.The […]

  • 3 December 2014
    Wind Farm Update

    Siemens has installed two of its SWT-6.0-154 offshore wind turbines at an onshore site in Wehlens near Wilhelmshaven. This represents the first onshore installation of 6MW offshore turbines, however it is already being installed at 210MW Westermost Rought offshore wind farm. Project owner Bioenergie Nord GmbH and planning engineering agency Pommer & Schwarz selected the […]

  • 24 March 2015
    Technology

    Japanese company Hitachi has completed the installation of  its 5MW downwind offshore wind turbine in Ibaraki prefecture. The turbine, featuring permanent-magnet generator, medium-speed gearbox and a rotor diametre of 126 metres, will undergo testing throughout the summer. The installation of the HTW 5.0-126 turbines next to the port of Kashima was delayed several times. Hitachi […]

  • 11 March 2015
    Business & Finance, Technology

    Siemens has presented its new SWT-7.0-154 wind turbine at EWEA Offshore conference in Copenhagen.  After setting standards with its flagship 6MW offshore wind turbine, the SWT-6.0-154, Siemens today introduced a generator upgrade to seven megawatt (MW), the new Siemens SWT-7.0-154. The turbine delivers nearly ten percent more energy production than the predecessor under offshore wind conditions, […]

  • 10 March 2015
    Technology

    Senvion SE has finished commissioning and initial test phase of the prototype of its Senvion 6.2M152. The turbine has been operating at Langen-Neuenwalde (Germany), about 20 kilometres north of Bremerhaven, since January. It generated the first kilowatt hour (kWh) on 18 December 2014 and received the Design Assessment. With a rated power of 6.15 megawatts, the Senvion […]

  • 27 March 2017
    Wind Farm Update

    Two and a half months ahead of schedule, Veja Mate has reached the halfway installation milestone with 34 of the total 67 wind turbines now installed.