Search results for: voltaire

1929 results

A list of search results

  • 18 September 2012

    Ofgem E-Serve has today appointed Blue Transmission as the preferred bidder to own and operate the high voltage link for the London Array (Phase 1) wind farm. This is the largest offshore transmission project to have reached this stage; the estimated value of the assets is £428 million. The London Array (Phase 1) windfarm, located […]

  • 6 July 2010
    Technology

    JDR has been awarded a £2million grant to develop high voltage cables. The award forms part of the Department of Energy and Climate Change (DECC’s) plans to help UK companies invest in the equipment and technology required to support the country’s transition to a low carbon future. As a leader in the renewable energy market, […]

  • 8 December 2011
    Grid Connection

    ABB, the leading power and automation technology group, will invest over $ 400 million to double the capacity of its high-voltage cables manufacturing facility in Karlskrona, Sweden, to meet growing demand for subsea cables. The investment plan includes construction of new buildings and installation of additional manufacturing lines at the existing plant. The expansion will […]

  • 8 April 2013
    Grid Connection

    At the Hanover Fair, ABB is exhibiting its complete portfolio of high voltage cables for direct current (DC) and alternating current (AC) on an XLPE basis. For the first time, moreover, ABB is showcasing Cable Care – a support package that subsumes solutional options and the capability portfolio in the field of cable service for […]

  • 17 April 2013
    Business & Finance

    LS Cable & System (President & CEO: Ja-Eun Koo) will be the first cable maker in Korea to introduce the High Voltage Direct Current (HVDC) cables to the European market. On April 15 the company announced that it would supply 24.5km of 285kV extra high voltage submarine cables and connectors to Energinet.dk, and 25.7km of […]

  • 15 December 2015
    Grid Connection, Wind Farm Update

    Balfour Beatty has been awarded a £25 million project by DONG Energy to construct a high voltage onshore substation, as part of the new Hornsea Project One offshore wind farm. Work to construct the new onshore substation is planned to start in January 2016, with Balfour Beatty responsible for the build at North Killingholme, North […]

  • 22 June 2023
    Grid Connection, Wind Farm Update

    Jan De Nul, together with its partner LS Cable & System, has completed the installation of the second subsea cable for the Hollandse Kust West Alpha offshore wind farm grid connection off the coast of Egmond aan Zee for TenneT. The subsea cable installation was carried out by the cable-laying vessel Isaac Newton, the work […]

  • 20 June 2023
    Wind Farm Update

    The 759 MW Hollandse Kust Noord offshore wind farm has produced its first green power and delivered it via TenneT’s offshore grid to the Dutch mainland. “We often talk about milestones along a project’s journey, and CrossWind has had a number to date, but to have the wind turbines generating green electricity safely and successfully […]

  • 31 May 2023
    Grid Connection, Wind Farm Update

    50Hertz has completed the pull-in of two 220 kV subsea cable systems into Iberdrola’s Baltic Eagle platform. The two 220 kV subsea cable systems were previously laid on the seabed in a safe area next to the destination of the substation platform. In February of this year, the substation platform was installed at its intended […]

  • 16 March 2012

    Modularity and flexible use form the basis of a new concept for medium-voltage converters from the Siemens Drive Technologies Division. In the future, it will be possible to use different topologies in a common modular system. This opens up new areas of application for medium-voltage converters in special purpose applications, for example on ships, in […]

  • 21 October 2019
    Grid Connection

    Siemens Gamesa has awarded Prysmian Group with a contract to provide cable and assembly supplies for wind turbines worldwide. Prysmian will supply turbine tower and nacelle cables and assemblies for Siemens Gamesa turbines in 2020. The supply includes low voltage cables and assemblies for nacelle platforms, low voltage cables for towers and fully terminated medium […]

  • 22 March 2022
    Contracts & Tenders, Grid Connection, Wind Farm Update

    A specially formed consortium between GE Renewable Energy’s Grid Solutions and New York-based BOND Civil & Utility Construction has been awarded an Engineering, Procurement & Construction (EPC) contract to supply a digital onshore substation for Empire Wind 1 wind farm offshore New York, USA. Empire Offshore Wind, a joint venture between Equinor and bp, awarded […]

  • 9 July 2015

    RWE Innogy has commissioned the Dutch company Fabricom Offshore Services BV to maintain the inter-array substation of the Nordsee Ost offshore wind farm for the next five years. The contract covers the inspection as well as the structural and mechanical maintenance of the auxiliary systems and the maintenance of the steel structure starting in August […]

  • 14 October 2010
    Grid Connection

    General Cable Corporation (NYSE: BGC) (the Company), a global leader in the wire and cable industry, through its wholly-owned subsidiary Norddeutsche Seekabelwerke GmbH (NSW), has been awarded a major order by 50Hertz Offshore GmbH, a subsidiary of the German-based transmission network operator 50Hertz Transmission GmbH, to provide a complete turn-key solution including the supply and […]

  • 24 April 2018

    Roxtec has delivered a package of cable sealing solutions for the Beatrice offshore wind farm off Scotland, including fireproof and watertight seals to secure high voltage cables on the two transformer modules.

  • 15 June 2023
    Wind Farm Update

    Two 220 kV high-voltage alternate current (HVAC) three-pole submarine cables have been installed for Vineyard Wind 1, America’s first large-scale offshore wind project. Prysmian Group, the supplier of the submarine cables, said that the operations proceed on time with the schedule and that their cable-laying vessel Ulisse is ready to perform submarine cable joints. Prysmian’s […]

  • 23 November 2021
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Siemens Energy will supply the main electrical equipment for the grid connection of Dominion Energy’s 2.6 GW Coastal Virginia Offshore Wind (CVOW) project in US federal waters. The wind farm will include up to 180 Siemens Gamesa’s SG 14-222 Direct Drive turbines standing slightly more than 800 feet tall and is the largest offshore wind […]

  • 27 September 2017
    Business & Finance

    The global high voltage power cable market was valued at USD 33.225 billion in 2016 and is projected to expand at a CAGR of 7.17% over the forecast period to reach USD 50.345 billion by 2022, according to a report at Research and Markets. 

  • 28 July 2011

    The Thanet offshore wind farm is the largest operational wind farm in the world. It consists of 100 turbines each with a 3MW generating capacity. The windfarm is located 11.3 km offshore from Foreness Point, in the North Sea. The WTG’s are interconnected by an offshore 33kV inter array cable network and connected to an […]

  • 7 February 2012
    Grid Connection

    DONG Energy, Fredericia (Denmark) and Nexans Deutschland have concluded a framework agreement for the delivery of up to 900 kilometres of medium-voltage submarine cables. Up until the end of 2015 (or, optionally, 2017), the Danish energy company will take delivery of up to 150 kilometres of high-performance cables every year for new offshore wind farms […]

  • 26 May 2011
    Grid Connection

      Equitix, Amp Capital and Balfour Beatty Consortium Appointed as Preferred Bidder for High-Voltage Link to Greater Gabbard Offshore Windfarm Green Energy Transmission (GET), a consortium comprising Equitix Ltd and AMP Capital Investors, together with Balfour Beatty Capital Limited has been selected by Ofgem E-Serve as the preferred bidder to own and operate the high […]

  • 16 November 2017
    Contracts & Tenders, Wind Farm Update

    Otary, the developer of Seastar and Mermaid offshore wind farms to be built off the coast of Belgium, is looking for EPCI contractor(s) for 225 kV XLPE submarine high voltage cables and connections between the wind farms’ substations and the Belgian modular offshore grid.

  • 25 July 2011
    Grid Connection

    Reportlinker.com announces that a new market research report is available in its catalogue  HVDC and HVAC Submarine Power Cables: Supply Constraints, Demand Drivers, Technology Issues, Prominent Projects, Key Industry Players, and Global Market Forecasts The high-voltage submarine cable market is, by all definitions, a niche market with few purchasers and even fewer manufacturers and installers. […]

  • 18 September 2018
    Grid Connection, R&D, Technology

    Schneider Electric is launching a new 72.5kV variant of its WI switchgear range, developed to optimise the design, safety, cost and reliability of 72.5kV electrical systems in offshore wind farms.

  • 14 May 2014
    Grid Connection, Technology

    Siemens Smart Grid and distribution network operator Netze BW have started a joint project entitled “Distributed Grid Intelligence”. The project’s goal is to equip the power distribution grid in the Niederstetten region of Baden-Württemberg for the challenges of Germany’s transition to a new energy mix by implementing a distributed intelligence system. At the same time, […]

  • 13 May 2016
    Grid Connection, Wind Farm Update

    The 295MW Nordsee Ost offshore wind farm has generated one million megawatt-hours of electricity almost exactly a year after its full commissioning on 8 May 2015, RWE Innogy reports. “One year after the official opening of our wind farm, we have cracked the one million mark. I am proud because it shows that our systems can meet the planned targets and […]