2112 results found for 'voltaire'

2112 results found for 'voltaire'
Order results by

A list of search results

  • 7 June 2018
    Contracts & Tenders, Grid Connection, R&D, Technology

    The Carbon Trust-led Floating Wind Joint Industry Partnership has issued a call for Expression of Interest (EoI) to participate in a competition to support the development of high-voltage dynamic cable designs for commercial floating wind projects.

  • 30 January 2013
    Operations & Maintenance

    Strukton Hollandia JointVenture is building an offshore transformer platform for its German client, RIFFGAT GmbH offshore wind park 1. Two transformers are installed on the platform which convert the voltage delivered by the thirty 3.6 MW wind turbines from 33 kV to 155kV. Under normal operating conditions, auxiliary voltage for the platform is generated by […]

  • 10 June 2016
    Business & Finance, Grid Connection, Wind Farm Update

    DONG Energy has awarded Dragados Offshore, a Spanish engineering, procurement, and construction (EPC) contractor and a part of the ACS Group, with a contract to deliver four substation jackets for the 1.2GW Hornsea Project One offshore wind farm in the UK. The scope of work awarded to Dragados Offshore is the procurement and fabrication of the jackets and piles […]

  • 23 November 2020
    Contracts & Tenders, Grid Connection, Wind Farm Update

    NKT has entered into a Preferred Supplier Agreement (PSA) as the main contractor to deliver and install export cable systems on an unnamed European offshore wind farm. Under the contract, NKT will deliver and install high-voltage DC on- and offshore export cable systems for the project. The potential order for NKT will comprise the manufacture […]

  • 30 January 2017
    Business & Finance, Grid Connection

    Prysmian informed today that it had been awarded a GBP 27 million contract for the land cable connection of the East Anglia ONE offshore wind farm.

  • 27 February 2019
    Grid Connection

    Cable laying vessel Cable Enterprise has arrived at Prysmian Group’s factory in Pikkala, Finland, to load the first batch of cables for the IFA2 (Interconnexion France-Angleterre) interconnector project. Over a ten-day period, over 100 kilometres of ± 320 kV DC submarine cables will be loaded onto the vessel. The IFA2 interconnector is a 1GW high voltage direct […]

  • 2 September 2019
    Grid Connection

    The 700MW COBRA Cable interconnector linking the Dutch and the Danish grid will be available for the electricity market as of delivery day, 7 September, Dutch high-voltage grid operator TenneT said. The 325-kilometre subsea high-voltage direct current cable is an initiative of TenneT and the Danish electricity and gas grid operator Energinet. Construction started in 2016 and was […]

  • 22 May 2014
    Business & Finance, Grid Connection, Wind Farm Update

    Following the financial close of the Gemini offshore wind project, nkt cables received a binding order worth approximately 165 mEUR for the delivery of more than 200 kilometers of 220 kV high voltage submarine cables and related accessories, all to be manufactured in Cologne, Germany. The cables are to be delivered ready for installation starting early 2015 […]

  • 10 February 2017
    Contracts & Tenders, Grid Connection

    Transmission system operators Energinet.dk and 50Hz Transmission are looking for a provider of client representative services during unexploded ordnance (UXO) activities along the cable routes at the Kriegers Flak Combined Grid Solution (CGS).

  • 26 January 2011
    Grid Connection

    The project sets new technological milestones reaching 864MW of power rating and 320 KV DC voltage Prysmian is the industry leader involved in most of the major worldwide offshore Windfarms projects Prysmian, a leading worldwide player in the energy and telecommunications cable industry, has been awarded a project worth more than €250 million by the […]

  • 7 August 2018
    Ports & Logistics, Vessels, Wind Farm Update

    Van Oord’s newly upgraded offshore installation vessel Aeolus has started installing monopile foundations on the 370MW Norther wind farm in the Belgian North Sea.

  • 5 August 2015
    Business & Finance

    Prysmian Group has been awarded contracts by Nobelwind NV, an offshore wind farm developer, to supply wind turbine inter-array cables for the Bligh Bank 2 (Belwind 2) offshore wind farm, located off the coast of Zeebrugge in Belgium. Prysmian is responsible for the design, manufacture and supply of the 33 kV submarine cables with various […]

  • 4 September 2014
    Grid Connection

    The onshore preparations for the new 129 MW Eneco Luchterduinen, a partnership of Eneco and Mitsubishi Corporation, offshore wind farm have entered a new stage. Pre-fabricated sub-modules for the Offshore High Voltage Substation (OHVS) have now been transported to the yard of Fabricom in Antwerp, Belgium. In the coming six months, the final assembly and […]

  • 7 November 2011
    Grid Connection

      While the high-voltage submarine cable sector remains a niche market, underwater power transmission is becoming more prevalent in the infrastructure plans of countries around the world. The current push for more readily available renewable power has created new opportunities – for grid interconnections and connecting offshore wind farms to nearby landmasses, for example – […]

  • 5 February 2013
    Grid Connection

    LS Cable & System announced on the 5th of February the supply of 150kV level submarine cables, 150kV&275kV extra high-voltage underground cable and connection materials to a scale of 16 million Euros (approx. KRW 23 billion) to Dong Energy, a Danish state enterprise and the largest wind power generation company in Europe. LS Cable & […]

  • 26 June 2014
    Business & Finance

    Avantha Group Company CG, along with the other consortium partners Fabricom and Iemants, has been selected by Van Oord, for the offshore wind project “Gemini” in the Netherlands. As part of the scope CG, will design, deliver and install 2 high voltage (HV) offshore substations and 1 HV onshore substation. The volume of the order […]

  • 14 October 2020
    Contracts & Tenders, Grid Connection

    TenneT has invited applications to qualify for a tender that will be launched in February 2021, when the Dutch transmission system operator will seek a subsea cable supplier for the Hollandse Kust West Beta platform. The scope of the contract will include the design, engineering, production, delivery, and installation of 220 kV AC sea cables […]

  • 20 July 2011

    J. J. Sietas KG of Hamburg is the first German shipyard to build an installation vessel for the erection of offshore wind farms. Siemens Marine Solutions will supply the appropriate diesel-electric propulsion and automation system as well as the medium voltage system for power generation and distribution. The order has a value of several million […]

  • 21 August 2014
    Grid Connection, Technology

    ABB has announced a breakthrough in cable technology. It has successfully developed and tested a 525 kilovolt (kV) extruded high-voltage direct current (HVDC) cable system to make renewable energy installations more efficient and cost-effective. This latest innovation will more than double the power capacity to about 2,600 megawatts (MW) from 1,000 MW. It will also […]

  • 27 August 2014
    Grid Connection, Technology

    ABB, the leading power and automation technology group, has successfully developed all major equipment required for the deployment of 1,100 kilovolt (kV) UHVDC power transmission systems. This advance in technology enhances power transfer capacity to 10,000 megawatts (MW) and extends the distance capability of such links to over 3,000 kilometers (km).  Higher voltage levels allow […]

  • 10 July 2020
    Contracts & Tenders

    EDS HV has secured two contracts with Vattenfall to provide high voltage network commissioning and safety management at the Kriegers Flak, Vesterhav Syd and Vesterhav Nord offshore wind projects in Denmark. In addition to the commissioning scope, EDS HV will be offering full high-voltage safety management. The company is also providing full management of all […]

  • 15 November 2019
    Grid Connection, Wind Farm Update

    DEME’s cable laying vessel Living Stone has departed Greece carrying the export cables for the 487MW SeaMade offshore wind farm in the Belgian North Sea. Living Stone loaded the export cables with a combined length of around 28 kilometres at Hellenic Cables’ facility in Soussaki. The vessel is currently en route to Vlissingen, the Netherlands. […]

  • 9 August 2013
    Business & Finance, Grid Connection, Operations & Maintenance

    TenneT Offshore GmbH is seeking a contractor who will undertake maintenance of the stored parts and SLA for the repair of the high voltage cable systems alpha ventus (Lot 1) and BorWin1 (Lot2) maintenance. This involves regular inspection and maintenance of embedded parts for the high voltage cable (sockets, spare cables) SLA Repair: In the […]

  • 19 June 2015

    Belgian wind farm developer Nobelwind has awarded Bladt Industries and Semco Maritime a new EPCI contract for the manufacturing of the Offshore Substation (OSS) for the upcoming Belwind 2 Offshore Wind Farm. The substation is to be delivered in the fourth quarter of 2016 – only 16 months after the signing of the contract. Bladt […]

  • 1 June 2012

    The new Cooper Power Systems 36(42) kV bolted tee connector for IEC- rated wind farm applications helps users to increase capacity and reduce losses. Designed to meet higher voltage ratings and cable diameters of up to 800 mm, the new fully-screened bolted tee connectors can be used for both indoor and outdoor installations, but are […]

  • 26 November 2010
    Business & Finance, Grid Connection

    ABB, the leading power and automation technology group, has won an order worth $125 million from the Belgian company C-Power NV to link a wind farm 30 kilometers off the coast of Belgium to the mainland grid. The transmission link is part of an expansion of the Thornton Bank wind farm. In the first phase […]