Search results for: Hywind scotland

2677 results

A list of search results

  • 14 May 2021
    R&D

    Total, an oil major which entered the offshore wind market last year, has become a member of the Carbon Trust’s Offshore Wind Accelerator (OWA). In the Accelerator, dedicated to offshore wind research and development, Total has existing members: EnBW, Equinor, Ørsted, RWE Renewables, ScottishPower Renewables, Shell, SSE Renewables, and Vattenfall. “Total has great ambition for […]

  • 30 July 2014

    Beatrice Offshore Windfarm Ltd (BOWL), a joint venture partnership formed between SSE Renewables (75%) and Repsol Nuevas Energias UK (25%), announced that Wick Harbour is likely to become the future location of the Beatrice offshore wind farm Operation and Maintenance base (O&M). A memorandum of understanding (MoU) has been finalised with Wick Harbour Authority and BOWL this week. Subject […]

  • 27 August 2012
    Technology

    Finnish wave energy developer, Wello Ltd, has released first testing results of the Penguin wave energy converter installed in Orkney, Scotland. The Penguin wave energy converter is a floating device connected to mooring system and to the grid with 11kV cable. Initial results confirmed efficient rotating movement of the device even in smaller waves than […]

  • 28 July 2016
    Business & Finance, Technology, Wind Farm Update

    Air traffic services company NATS has signed a contract with Vattenfall to provide radar mitigation services for the 92.4MW European Offshore Wind Deployment Centre (EOWDC) off the Aberdeenshire coast. The mitigation solution will see NATS ‘blanking’ the EOWDC development on its Perwinnes radar and the installation of a Wide Area Multilateration radar system to infill the […]

  • 5 April 2018
    Grid Connection, Operations & Maintenance, Vessels, Wind Farm Update

    Nexans has completed the manufacturing of the 220kV offshore export cable for the Beatrice wind farm, with the final section now en route to the offshore site in the Outer Moray Firth, Scotland.

  • 27 October 2017
    Contracts & Tenders, Wind Farm Update

    GeoSea has signed an agreement with Moray Offshore Windfarm (East) Ltd for the supply and installation of turbine and substation foundations, as well as the transport and installation of three offshore substation platforms for the 950MW Moray East offshore wind farm off Scotland.

  • 5 October 2021
    Contracts & Tenders, Operations & Maintenance, Wind Farm Update

    Nexans has won a contract with Parkwind to provide turnkey business continuity services to four of its offshore wind farms in Belgium. The Northwind, Belwind, Nobelwind and Northwester 2 farms are among the biggest in Belgium, with a combined installed capacity of 771 MW. Together, these four wind farms can power over 800,000 homes. The […]

  • 27 January 2022
    Contracts & Tenders, Vessels

    Danish wind farm installation vessel owner and operator Cadeler A/S has secured a contract with Vestas, and a reservation agreement with an undisclosed client. The contract with Vestas is said to have strengthened Cadeler’s order backlog and ensured optimal utilization of the company’s O-class vessels, Wind Osprey and Wind Orca, up until the planned vessel […]

  • 21 August 2018
    Contracts & Tenders, Wind Farm Update

    After being selected as the preferred turbine supplier for the Moray East offshore wind project in October 2017, MHI Vestas today (21 August) signed a conditional agreement with Moray Offshore Windfarm (East) Limited for the supply and installation of one hundred of its V164-9.5 MW offshore wind turbines. 

  • 9 June 2016
    Business & Finance, Grid Connection, Operations & Maintenance, R&D, Technology, Training & Education

    Cable protection systems (CPS) supplier Tekmar Energy has successfully carried out a full-scale demonstration of its products at The Underwater Centre, the subsea training and trials facility based in Fort William, Scotland. The objective of the demonstration was to prove the ability to remove a CPS without the need for divers, which is seen as key for […]

  • 2 January 2023
    Vessels

    Edda Wind has revealed that it expects delays for its newbuild Commissioning Service Vessel (CSOV) Edda Breeze and Service Operation Vessels (SOVs) Edda Brint and Edda Goelo (C416). Edda Breeze and Edda Brint have both been delivered from the respective yards and are currently in the process of installing the gangway systems in Denmark. Based […]

  • 2 August 2022
    Vessels, Wind Farm Update

    This article was updated at 11:19 CET on 2 August. Heerema Marine Contractors’ vessel Sleipnir has started installing the gravity-based foundations at the site of the 500 MW Fécamp offshore wind farm in France, according to an update Heerema posted via social media. Yesterday morning (1 August) HAROPA – Port of Le Havre announced the first three gravity-based […]

  • 28 December 2020
    Wind Farm Update

    The 103rd and final jacket foundation has been installed at the Moray East offshore wind farm site in Scotland. The Seajacks Scylla jack-up vessel installed the first three-legged jacket in July. The wind farm’s three offshore transformer modules (OTMs), together with their three jacket foundations, have been in place since mid-September. DEME’s installation vessel Orion, initially scheduled to be […]

  • 11 April 2017
    Business & Finance, Contracts & Tenders, R&D, Technology

    E.ON has announced that it will invest in the development of a demonstration site for airborne wind technology in County Mayo in Ireland, and that it entered into a collaboration agreement with Ampyx Power as the first user of the test site.

  • 21 March 2014
    Authorities

    Moray Offshore Renewables Ltd welcomed the Scottish Government’s consent award for the construction and operation of 1.116MW of offshore wind generation in the Outer Moray Firth. The project, which, on conservative estimates of the wind resource available, will be capable of meeting the equivalent electricity needs of around 700.000 UK households, consists of the Telford, […]

  • 17 January 2012

    Alstom and the leading Scottish marine developer SSE Renewables have signed a new joint venture agreement to develop the Costa Head Wave Project, an up to 200 Megawatts (MW) wave energy site located north of mainland Orkney, in The Crown Estate’s Pentland Firth and Orkney Waters Strategic Area. Alstom and SSE Renewables will work together […]

  • 2 January 2015

    A2SEA sells Sea Energy wind turbine installation vessel A2SEA has sold its offshore wind installation vessel SEA ENERGY. In the future, the vessel will be engaged in maintenance of oil installations in the Gulf of Guinea, Africa for the company O. I. S. International Ltd. Suction bucket jacket foundation installed at Borkum Riffgrund 1 (Gallery) DONG Energy has […]

  • 22 September 2022
    Contracts & Tenders, Wind Farm Update

    The installation of the wind turbine jacket foundations is soon to commence at the 450 MW Neart an Gaoithe (NnG) wind farm offshore Scotland. Ten three-legged jacket substructures will be installed onto pre-installed piles at the NnG construction site, located some 15 kilometres off the Fife coast. The jacket foundations will be brought directly to […]

  • 5 April 2017
    Training & Education

    DNV GL has confirmed 3sun Academy’s certification for the Global Wind Organisation (GWO) Basic Maintenance Training (BMT), making the 3sun Group’s training division one of only two UK centres accredited to deliver new mandatory safety and technical training for wind turbine technicians, the company said on 4 April.

  • 15 January 2021
    Business & Finance, Wind Farm Update

    Copenhagen Infrastructure Partners (CIP) is selling its 35 per cent stake in the 588 MW Beatrice offshore wind farm to The Renewables Infrastructure Group (TRIG) and funds managed by Equitix Investment Management Limited. TRIG has exchanged contracts with CIP to acquire an equity interest of 17.5 per cent in the project. Funds managed by Equitix […]

  • 21 March 2014
    Business & Finance, Wind Farm Update

    Beatrice Offshore Windfarm Ltd (BOWL) has welcomed the decision by Marine Scotland to grant consent to the £3bn Beatrice offshore wind farm project, situated in the Outer Moray Firth. The project consent marks a positive step forward for BOWL, and it will now assess how to progress Beatrice over the coming months, taking account of […]

  • 4 April 2022
    R&D

    Innosea has announced that its engineering and consulting scope of work on the FLOTANT project has been completed. The project, funded by the European Horizon 2020 Research programme, aims to develop optimised mooring, anchoring, and subsea interconnection arrangement for floating offshore wind turbines. Innosea has completed engineering deliveries within three areas including hydrodynamic assessment and […]

  • 16 June 2022
    Business & Finance, Grid Connection, Wind Farm Update

    Rovco has commenced year three of its survey campaign on the operational Beatrice offshore wind farm located in the Outer Moray Firth in Scotland. Rovco’s UK-based team will deliver survey work on all inter-array cable and subsea jacket locations across the 588 MW wind farm, with activities commencing this month. The project will use the […]

  • 19 November 2018
    Contracts & Tenders, Grid Connection, Wind Farm Update

    The consortium of NKT and Boskalis Subsea Cables & Flexibles has signed a Pre-Construction Agreement (PCA) for the delivery and installation of an export cable system for the 784MW Inch Cape offshore wind project in the UK.

  • 26 April 2018
    Technology, Vessels

    UK marine engineering company MAATS Tech has announced that it received a patent for its latest product, the Vessel Enabler, a modular chute that enables high-tension horizontal cable lay in deep waters and thus eliminates the need for a vertical lay tower or vertical lay system.

  • 11 January 2012

      Niall Stuart, Chief Executive of Scottish Renewables responds to Civitas wind power report.  “There are so many fundamental mistakes and flawed assumptions in this jaundiced report it’s hard not to see this as blatant prejudice masquerading as economics. Ruth Lea’s frequent asides show that she doesn’t believe in climate change or the need to […]