Search results for: C-Power

767 results

A list of search results

  • 6 July 2016
    Vessels

    Damen Shiprepair Dunkerque (DSDu) has inspected thrusters of DEME’s DP1 jack-up vessel Thor and repainted its hull in the new DEME livery. Thor spent four days in one of the yard’s drydocks. A special docking solution was required due to the size of the vessel’s aft thrusters, which are 3.825 metres high and standard dock blocks are just 1.80 metres. The […]

  • 21 August 2018
    Operations & Maintenance, Wind Farm Update

    James Fisher Marine Services (JFMS) has completed a gearbox oil change project at the Thornton Bank offshore wind farm in Belgium. 

  • 10 March 2013

    Germany: Crane Vessel Stanislav Yudin Transports Tripods to Trianel Wind Farm Borkum The beginning of the month of March has seen the crane vessel, Stanislav Yudin, launch the transportation of tripods from the offshore terminal in Bremerhaven BLG to the Trianel Wind Farm Borkum.   Main Reasons Why U.S. Still Doesn’t See Offshore Wind Turbines […]

  • 20 January 2015
    Authorities, Wind Farm Update

    In 2014, three Belgian offshore wind farms (C-Power, Belwind and Northwind) produced more than 2.2 million megawatt hours of electricity. Belgian Secretary of State for North Sea, Bart Tommelein, said that the production in 2014 is equivalent to the annual consumption of 623,715 households, adding that this is an impressive figure, especially since the Northwind offshore wind […]

  • 23 June 2011
    Wind Farm Update

      The first foundation of the offshore wind farm Thornton Bank 2 has been successfully installed off the coast of Belgium. The around 50 metre high and 550 ton steel foundation (a so-called jacket foundation) was manufactured in Hoboken near Antwerp, and in the past few days it was transported via pontoons through the Scheldt […]

  • 31 January 2018
    Business & Finance

    More than 40 UK offshore wind supply chain companies and the key Belgian offshore wind players met on 25 January in Brussels to discuss opportunities for collaborating in the framework of three future Belgian projects: Mermaid, Seastar and Northwester 2.

  • 7 March 2012
    Ports & Logistics

    Amid great public attention, the new DP2 jack-up vessel ‘Neptune’ was named today at the port of Ostend by Mrs Isabel Casteleyn, partner of Federal State Secretary for Energy and the Environment Melchior Wathelet. This self-propelled jack-up vessel was built by IHC Merwede for GeoSea N.V., the offshore marine construction specialist of the Belgian DEME […]

  • 23 February 2012

    The seminar “Power to the Winds of Change”, with keynote speakers Dr. Bertrand Piccard, Initiator and Chairman of Solar Impulse, Mr. Jaak Rutten, CEO of C-Power, Mr. Melchior Wathelet, Belgian Secretary of State for Environment and Mobility, and Serge de Gheldere, CEO of futureproofed and the Belgian Climate Ambassador, will offer a nuanced insight into […]

  • 3 June 2019
    Business & Finance

    The Limburg investment holding company Nuhma has launched a cooperative through which Belgian citizens and partnerships can now invest in offshore wind projects Nuhma is involved in. The first company in which the general public can invest via the ECO2050 cooperative is Z-Kracht. Z-Kracht, a division of Nuhma, holds shares in and has financed the operational […]

  • 11 January 2019
    Wind Farm Update

    The 309MW Rentel wind farm in the Belgian North Sea has become Belgium’s fifth fully operational offshore wind farm. Rentel has now joined the ranks of C-Power, Belwind, Northwind, and Nobelwind. The combined capacity of the five wind farms is 1,186MW provided by 274 wind turbines. With the addition of the capacity from Rentel, Belgium is now fifth […]

  • 19 February 2013

    Even though offshore wind projects are now constructed faster and safer than ever before, the industry as a whole is still perceived as “high risk” by the majority of external investors. The main reason for this remains the high cost of energy production coupled with the limited financial stability of some contractors. In most cases, […]

  • 4 July 2013
    Wind Farm Update

    Yesterday, the last turbine at the offshore wind farm Thornton Bank was successfully installed. This means that the installation of all 48 wind turbines off the Belgian coast, with a combined capacity of 325 megawatts (MW), is now complete. With the generated electricity, the power plant can supply some 600,000 Belgian housholds every year. In […]

  • 29 June 2012
    Business & Finance

    The European Investment Bank (EIB) will grant EUR 333 million to finance the Northwind offshore wind power plant. The financial close, which was announced yesterday, will cover the construction and operation of a 216 MW offshore wind farm to be built on a sandbank located 37 km from the port of Ostend on the Belgian coast. This new […]

  • 12 December 2014

    On Wednesday December 10th, the first edition of the Belgian Offshore Day took place on the Rebo-site in the Port of Oostende. The Belgian Offshore Day is a business event that completely fits within the framework of the offshore wind business. All regional players operating in the sector were present and had the opportunity to put their knowledge […]

  • 21 February 2012

    Huisman, the specialist in lifting, drilling and subsea solutions, successfully delivered the 600mt Wind Turbine Installation Crane onboard GeoSea’s DP2 jack-up vessel “Neptune”. The crane was handed over to the builder of the vessel IHC Offshore and Marine BV, part of IHC Merwede, who subcontracted the crane to Huisman in 2010. The 600mt Pedestal Crane […]

  • 14 November 2014
    Environment, R&D

    A new paper on macrobenthic recovery after dredging activities in offshore wind farms has been published by Springer Link. The article was authored by Delphine A. Coates, Gert van Hoey, Liesbet Colson, Magda Vincx and Jan Vanaverbeke. The abstract says: The development of offshore wind farms (OWFs) in the North Sea has increased considerably to create alternatives for fossil fuel energy. […]

  • 28 May 2014
    Business & Finance, R&D, Technology

    FLiDAR has recently strengthened its team with three experienced engineers. Bruce Douglas, General Manager of FLiDAR said: “Based on recent commercial successes we are delighted to be able to grow the team with talented and experienced individuals. We aim to deliver better services to our clients and further expand in the growing offshore wind markets […]

  • 9 February 2012

    EDF Energies Nouvelles has started offshore construction work on the Teesside offshore windfarm off the coast of North East England. This 62 MW windfarm is due to start generating by the end of 2012. Located off the coast of Redcar in North East England, the windfarm will be equipped with 27 offshore wind turbines supplied […]

  • 4 January 2021
    Wind Farm Update

    Belgian offshore wind farms generated 6.7 TWh of electricity in 2020, which represented 8.4 per cent of total electricity consumption in Belgium, or the electricity consumption of around 1.9 million families. Eight offshore wind farms are currently operational in the Belgian North Sea, with a total installed capacity of almost 2.3 GW. This includes Northwester […]

  • 30 January 2013

    German offshore wind projects – the current accomplishments, technical challenges and future opportunities, these topics and many others surrounding them will be discussed at GL Garrad Hassan’s 11th Hamburg Offshore Wind Conference (HOW) on 20-21 February 2013. The conference invites developers, manufacturers, and operators of wind turbines, engineering consultants, investors, energy companies, as well as […]

  • 28 June 2012
    Business & Finance

    GeoSea, subsidiary of the Belgian DEME Group and specialising in offshore constructions, has just signed a contract with Northwind NV for the construction and installation of foundations for Northwind’s offshore wind farm project off the Belgian coast. The project includes the installation of 73 steel monopiles and transition elements as foundations for the turbines and […]

  • 6 July 2011
    Operations & Maintenance, Wind Farm Update

      Sparkling on the horizon from the Belgian seaside resort of Oostende stands the Thornton Bank offshore wind farm. Last week the EWEA team set out to see these turbines – six tall towers which form phase one of the offshore farm’s development – up close and personal. At some 30km from the coast the […]

  • 3 August 2012
    Operations & Maintenance, Training & Education

    A2SEA Chief Operation Officer demonstrates how to overcome the logistic problems posed on the Ormonde offshore wind farm to deliver on time, incident free and on budget. Adoption of an end to end approach and employing a blend of cutting edge and proven techniques means A2SEA boost one of the most enviable track records in […]

  • 5 September 2012
    Business & Finance, Wind Farm Update

    Suzlon Group-subsidiary, REpower Systems SE, has signed a contract with RWE Innogy for the delivery of 54 REpower 6M offshore turbines, each with 6.15 MW of rated power, for the Innogy Nordsee 1 wind farm. The project, with a total capacity of 332 MW, is based in the German North Sea, around 40 km north […]

  • 5 August 2012

    More than 20 offshore wind parks have been approved in the North Sea and three more in the Baltic, all outside the 12 nautical mile Exclusive Economic Zone (EEZ). Inside the EEZ, four wind parks have been approved in the North Sea and two in the Baltic. In total, there are 4,700 turbines planned to […]

  • 9 October 2012

    In little over a month, the first-ever Offshore Wind Energy Summit with an exclusive focus on grids, foundations and installation technology will take place in Hamburg, the principal location for offshore wind in Europe. More than 150 senior level wind industry executives – already comprised of 25 Utilities and 80 installation specialists – have begun […]