1096 results found for 'beacon wind 1 '

1096 results found for 'beacon wind 1 '
Order results by

A list of search results

  • 12 February 2026
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The US government will fight the federal court decisions to grant preliminary injunctions in cases challenging the stop-work orders for offshore wind projects under construction, issued on 22 December 2025. The injunctions allowed the construction to resume while the underlying lawsuits are underway. The US Secretary of the Interior, Doug Burgum, told Bloomberg Television the […]

  • 10 February 2026
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Foundations, Supply Chain

    CS Wind Offshore has received the Final Notice to Proceed for the Nordlicht 2 transition pieces (TPs) from Vattenfall, which made the full final investment decision (FID) for its Nordlicht offshore wind projects in January. For the 1.6 GW Nordlicht cluster, CS Wind Offshore will deliver 68 TPs for the 980 MW Nordlicht 1 and […]

  • 13 January 2026
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    The German Federal Maritime and Hydrographic Agency (BSH) has confirmed the permit for Vattenfall’s Nordlicht 2 offshore wind farm. With the permit now irrevocable, the developer has taken the full final investment decision (FID) for the Nordlicht offshore wind cluster, comprising Nordlicht 1 and Nordlicht  2, with construction expected to start this year on the first […]

  • 25 May 2026
    Business & Finance, Cables, Contracts & Tenders, Fixed-Bottom, Supply Chain, Wind Farm Update

    Haesong Offshore Wind has signed preferred supplier agreements (PSAs) with LS Cable & System and LS Marine Solution, alongside a tripartite memorandum of understanding (MoU) with LS Cable & System and KEPCO Engineering and Construction (KEPCO E&C), for its Haesong Offshore Wind 1 and 3 projects in South Korea. According to the company, the agreements […]

  • 27 April 2026
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Supply Chain, Wind Farm Update

    Jan De Nul has completed the installation of two export cables for the Fengmiao 1 offshore wind farm, being built by Copenhagen Infrastructure Partners (CIP) 35 kilometres off the coast of Taichung, Taiwan. The two high-voltage subsea cables, measuring 45 kilometres and 44 kilometres, have been installed and are currently wet stored offshore, awaiting installation […]

  • 23 December 2025
    Cables, Contracts & Tenders, Grid Connection, Supply Chain

    NjordIC has been awarded the UXO Consultancy Services Contract for the Doordewind 1 & 2 Grid Connection System, commissioned by TenneT and forming part of TenneT’s offshore HVDC program supporting the Netherlands’ ambition to deliver 21 GW of offshore wind capacity. Under the contract, NjordIC will provide full-scope UXO consultancy covering survey preparation, offshore survey […]

  • 28 January 2026
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Construction work can restart on the 95-per-cent-complete Vineyard Wind 1 offshore wind farm after the US District Court for the District of Massachusetts issued a decision to allow full activities to resume in the Vineyard Wind lease area on the US Outer Continental Shelf (OCS). This is the fourth of the five offshore wind projects […]

  • 19 January 2026
    Authorities, Business & Finance, Contracts & Tenders, Fixed-Bottom, Planning & Permitting

    The Dutch government plans to launch a subsidy-based, 1 GW offshore wind tender in September to ensure its success before the Contract for Difference (CfD) scheme, on which the government is working, is implemented from mid-2027. According to the Dutch Minister of Climate Policy and Green Growth, the temporary measure is necessary to maintain the momentum […]

  • 19 February 2026
    Authorities, Business & Finance, Fixed-Bottom, Floating Wind, Planning & Permitting

    The US Department of Justice, Environment & Natural Resources Division, filed a Notice of Appeal on 17 February in the case in which a federal judge ruled in favour of 18 states that sued the Trump administration over the sweeping ban on wind energy projects. In May 2025, seventeen US states and the District of […]

  • 17 April 2026
    Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update

    OEG will provide crew transfer vessels (CTVs) during the construction of the Baltica 2 offshore wind farm in Poland, jointly developed by PGE Polska Grupa Energetyczna and Ørsted.  According to a contract award notice on the EU tenders’ website, on 27 February, Ørsted selected Opus Marine (which was acquired by OEG in 2022) to provide […]

  • 17 January 2026
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The US District Court for the Eastern District of Virginia has granted Dominion Energy’s request for a preliminary injunction allowing construction to resume on the Coastal Virginia Offshore Wind (CVOW) project while the company’s lawsuit challenging the stop-work order proceeds. “Our team will now focus on safely restarting work to ensure CVOW begins delivery of […]

  • 11 June 2026
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    All monopile foundations have been installed at the Yeonggwang Nakwol project site in South Korea, where Nakwol Blue Heart (Nakwol Wind) is building a 364.8 MW offshore wind farm. Located off the coast of Nakwol-myeon in Jeollanam-do Province, the offshore wind farm will comprise 64 Vensys wind turbines, each with a capacity of 5.7 MW, and […]

  • 12 January 2026
    Authorities, Fixed-Bottom, Planning & Permitting

    New York Attorney General (AG) Letitia James has filed two lawsuits against what the AG says is “the Trump administration’s unlawful attempt to halt construction” on Empire Wind 1 and Sunrise Wind, two large-scale offshore wind projects being built in the US federal waters off New York. In the lawsuits, filed simultaneously for the two […]

  • 23 April 2026
    Grid Connection, Industry

    Five European transmission system operators (TSOs) have signed a memorandum of understanding (MoU) on cooperation on offshore cable infrastructure in the North Sea. The agreement was signed at WindEurope’s Annual Event in Madrid by Elia (Belgium), Energinet (Denmark), 50Hertz (Germany), and TenneT, which operates in Germany and the Netherlands. The initiative aims to improve the […]

  • 11 December 2025
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The Blue Mackerel offshore wind project, being developed by JERA Nex BP (a 50:50 joint venture between JERA Co. and BP), has been awarded Major Project Status (MPS) by the Australian federal government. With the MPS recognition, the proposed 1 GW project secures dedicated support from the Federal Major Projects Facilitation Agency (MPFA), which will […]

  • 13 May 2026
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Mubadala Investment Company has invested USD 325 million (approximately EUR 300 million) in the UK’s Hornsea 3 offshore wind farm, being built by Ørsted at a site located around 120 kilometres off the Norfolk coast. The Abu Dhabi-based investor is joining a consortium led by Apollo-managed funds, which also includes USS and La Caisse. The […]

  • 21 January 2026
    Environment, Fixed-Bottom, Project Updates, Research & Development, Wind Farm Update

    The Neart na Gaoithe (NnG) offshore wind farm in Scotland is launching what the project owner says is the country’s largest seabird monitoring study, aimed at gathering detailed data on bird behaviour around offshore wind turbines. The 450 MW wind farm, located around 15.5 kilometres off the Fife coast in the Outer Firth of Forth, […]

  • 6 February 2026
    Vessels

    Hanwha Ocean has secured an order from Ocean Wind Power 1 for a wind turbine installation vessel (WTIV) worth KRW 768.7 billion (approximately EUR 444 million). Scheduled for delivery in the first half of 2028, the new vessel will be the first WTIV in Korea capable of installing 15 MW-class offshore wind turbines, and is […]

  • 9 December 2025
    Authorities, Business & Finance, Environment, Industry, Market Outlooks, Outlook & Strategy, Planning & Permitting, Supply Chain

    A federal judge has struck down the US President Donald Trump’s indefinite halt of all federal approvals and permitting for new wind energy projects. In a ruling on 8 December, Judge Patti Saris of the US District Court for the District of Massachusetts ruled in favour of 17 US states and the District of Columbia, […]

  • 11 February 2026
    Fixed-Bottom, Grid Connection, Wind Farm Update

    Germany’s total offshore wind power generation in 2025 amounted to 26.1 TWh, of which 20.8 TWh came from the North Sea and 5.38 TWh from the Baltic Sea, according to TenneT Germany, the transmission system operator (TSO) in charge of the country’s North Sea grid. In this article: With onshore wind farms contributing 106.5 TWh […]

  • 16 February 2026
    Authorities, Contracts & Tenders, Fixed-Bottom, Planning & Permitting

    The New York State Energy Research and Development Authority (NYSERDA) has closed the state’s fifth offshore wind solicitation, launched in 2024, without awarding any offshore renewable energy credits (ORECs). The state agency has also launched a Request for Information (RFI) to inform a potential process through which the state would support the predevelopment of offshore […]

  • 12 June 2026
    Authorities, Business & Finance, Contracts & Tenders, Fixed-Bottom, Floating Wind, Supply Chain

    The French government published a call for tenders notice in the Official Journal of the European Union on 11 June 2026, launching the process to award development rights for eleven offshore wind projects, seven floating and four fixed-bottom, totalling a little over 10 GW. The offshore wind sites offered through this tender are located off […]

  • 20 April 2026
    Authorities, Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    A Massachusetts Superior Court has granted Vineyard Wind a preliminary injunction preventing GE Vernova from terminating its role in the offshore wind project off Martha’s Vineyard, according to the court filing shared by US media outlets. The decision, issued on 17 April after a hearing on 16 April, halts GE Vernova’s planned termination of the […]

  • 4 December 2025
    Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    The Borkum Riffgrund 3 offshore wind farm fed its first power into the German grid on 3 December, according to Ørsted, which owns the project together with Nuveen Infrastructure. Once fully commissioned, which is expected in the first quarter of 2026, the 913 MW offshore wind farm will become the largest in Ørsted’s German portfolio. […]

  • 23 April 2026
    Grid Connection, Planning & Permitting

    The New Jersey Board of Public Utilities (NJ BPU) has requested to terminate the State Agreement Approach (SAA) it signed with PJM Interconnection (PJM) in 2021 to develop offshore wind transmission projects in a more streamlined and cost-efficient way that also allow for minimal disruption to communities and nature while providing certainty for offshore wind […]

  • 1 January 2026
    Authorities, Business & Finance, Contracts & Tenders, Equipment, Fixed-Bottom, Floating Wind, Foundations, Grid Connection, Industry, Infrastructure, Jobs & Recruitment, Manufacturing, Operations & Maintenance, Outlook & Strategy, Planning & Permitting, Ports & Logistics, Project Updates, R&D, Supply Chain, Technology, Wind Farm Update, Wind Turbines

    OffshoreWIND.biz has millions of views per year and hundreds of thousands per month. In 2025, some stories received significantly bigger attention than others, and in this overview, we are bringing the ten most popular news in the now-past year. In August, only days after Ørsted reported that Revolution Wind was at 80 per cent of […]