Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Maersk Connector Grounds for Walney Extension (Video)
Grid Connection

June 12, 2017 · about 9 years ago

Maersk Connector Grounds for Walney Extension (Video)

DeepOcean has performed the first engineered grounding of the Maersk Connector during export cable pull-in operations on DONG Energy’s 660MW Walney Extension offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

DeepOcean has performed the first engineered grounding of the Maersk Connector during export cable pull-in operations on DONG Energy’s 660MW Walney Extension offshore wind farm.

The company has shared a video of the maiden grounding of the Maersk Connector at Morecambe Bay.

The Walney Extension wind farm is being constructed in the Irish Sea, some 35km northwest from the Fleetwood and Blackpool coast.

The wind farm will consist of 40 MHI Vestas and 47 7MW Siemens wind turbines, scheduled to be commissioned in 2019.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Grid ConnectionVesselsWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Gets New Offshore Wind Farm as All Turbines Installed at 704 MW Revolution Wind
  2. 2Vietnam-Made Cable Layer Enters Into Service in Taiwan
  3. 3Germany’s 960 MW He Dreiht Offshore Wind Farm Inaugurated
  4. 4200th Vestas V236-15.0 MW Wind Turbine Installed Offshore

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free