10000 results found for 'DOE'

10000 results found for 'DOE'
Order results by

A list of search results

  • 11 May 2017
    Authorities, Wind Farm Update

    A bill aiming to prohibit the permitting of an offshore wind energy project within the Monhegan Lobster Conservation Area, or within 10 nautical miles of the area, was dismissed by the U.S. State of Maine’s Energy, Utilities and Technology committee.

  • 14 March 2017
    Vessels, Wind Farm Update

    Ahead of the turbine installation at the Race Bank offshore wind farm, due to start at the end of April, A2SEA’s jack-up vessel Sea Installer has been fitted with four massive adapter rings for wind turbine tower sea fastening.

  • 7 April 2023

    DEME and Allseas have signed a contract for the installation of the offshore substation for the Îles d’Yeu et de Noirmoutier offshore wind farm in France. The 496 MW offshore wind farm has just moved into the construction stage after the consortium behind the project reached the final investment decision. DEME has been contracted for the […]

  • 16 September 2014
    Business & Finance, Operations & Maintenance, R&D

    Do you really know how OEMs are running your wind farm? The fast-approaching expiry dates of many five-year equipment service warranties could spell uncertainties, opportunities and strategic decision-making for many offshore asset operators. Fortunately, there are attractive alternatives.  Article by Green Marine Solutions Time flies  The shape of O&M services could soon change quite radically […]

  • 11 April 2014

    Ctruk is about to officially name its sixth CTruk 20T MPC offshore wind support vessel intended for Offshore Turbine Services (OTS), the ‘Lieutenant P’. The naming ceremony will take place in Brightlingsea, Essex, next Wednesday afternoon. The seventh vessel for OTS is currently under construction. Both vessels were ordered last year in May and are […]

  • 23 July 2021
    Grid Connection, Wind Farm Update

    Jan De Nul has completed the installation of all export cables for the 376 MW Formosa 2 offshore wind farm in Taiwan. The company installed four export cables with a total length of 34 kilometres using its cable laying vessel (CLV) Willem de Vlamingh, which was able to position itself close to the beach and […]

  • 7 June 2013

    The Hanseatic Offshore Group (Germany), founded in 2012 and specialised in offshore construction management, secured a contract with Fred.Olsen windcarrier, to finalise the OWF BARD O1 in the north sea. Hanseatic Offshore Group supplies Construction Manager and backoffice support in Germany for the finalisation of the OWF. Fred.Olsen windcarrier carries out the work with teh […]

  • 12 June 2025
    Business & Finance, Ports & Logistics

    Spain’s Bilbao Port Authority has approved a 128,688-square-metre expansion of Haizea Bilbao’s concession area, a company that manufactures offshore wind towers and foundations. The granted area spans Docks AZ-2 and AZ-3 and is adjacent to the company’s existing concession. Haizea Bilbao, part of the Haizea Wind Group, will have a concession area of nearly 340,000 […]

  • 29 August 2012
    Authorities

    As Reuters reports, German Chancellor Merkel’s cabinet gave a green light to a draft law aimed at spurring offshore wind development, which is the key part of the German green energy shift. The draft will now go through the parliamentary legislative process. So far the offshore wind development has been falling behind solar and onshore […]

  • 20 September 2019
    Business & Finance, Contracts & Tenders, Wind Farm Update

    Offshore wind projects selected in the third Contracts for Difference (CfD) Allocation Round 3 will be delivered at a strike price as low as GBP 39.65/MWh, a near 30% reduction compared to the second CfD auction held in 2017. For the first time renewables are expected to come online below market prices and without additional […]

  • 8 May 2012
    Business & Finance

    THE European Marine Energy Centre has strengthened its senior team with the appointment of marine renewable energy expert Max Carcas of Caelulum Ltd to work on external liaison activities. Mr Carcas will work with EMEC to assist the world-leading wave and tidal energy test facility boost its industry engagement due to increased demand. Mr Carcas […]

  • 26 May 2020
    Vessels

    Jan De Nul has started the construction of its next-generation jack-up installation vessel Voltaire with a steel cutting ceremony at the Cosco Shipping Shipyard (Nantong) in China. The Voltaire is specifically designed to transport, lift and install offshore wind turbines, transition pieces, and foundations for current and future developments. The jack-up is equipped with a […]

  • 15 January 2015
    R&D, Wind Farm Update

    On January 12, in the Port of IJmuiden, Deep BV started the mobilisation of the vessels to be used for the geophysical survey of Sites I and II of the Borssele Wind Farm Zone. Depending on the weather, the due date for the survey is mid-March and will be followed by a geotechnical investigation. The geophysical survey is […]

  • 9 January 2012

    Wind power production in UK reached record due to the storm before the New Year. Onshore and offshore wind turbines produced almost 20% more power than previous record, and supplied 12.2% of UK energy demand on December 28, reports Reuters. Currently, there are 3515 wind turbines installed in the UK, with total capacity of 5,970.6 […]

  • 9 December 2011
    Business & Finance

    Ocean Power Technologies, Inc. (“OPT” or “the Company”) today announces financial results for its fiscal 2012 second quarter ended October 31, 2011. “We ended the second quarter of fiscal 2012 with further progress on PowerBuoy deployments, and a number of business development initiatives to commercialize our technology are currently underway,” said Charles F. Dunleavy, Chief […]

  • 3 June 2022
    Technology, Vessels

    The Norway-based company OSC AS (previously known as Offshore Simulator Centre) will build a high-end simulator for Jan De Nul’s two next generation offshore wind installation vessels, Voltaire and Les Alizés. The crane simulator will be a digital twin, based on real physics and the actual vessel models, enabling Jan De Nul to train its […]

  • 16 June 2015
    Wind Farm Update

    RWE will officially open its Gwynt y Môr offshore wind farm on Thursday, June 18, the company has announced on its social media pages.  The 576MW project is the second largest operating offshore wind farm in the world, comprising 160 Siemens 3.6MW turbines which can power 400,000 homes. The O&M work on the wind farm is being done from a dedicated base […]

  • 23 January 2013
    Business & Finance

    Siemens is starting fiscal 2013 with solid figures. Compared to the same period last year, revenue increased slightly in the first quarter due to the good order backlog. Although new orders declined moderately year-over-year, the book-to-bill ratio was again above 1, having been below 1 for the previous three quarters in a row. Total Sectors […]

  • 21 September 2022
    Contracts & Tenders, Wind Farm Update

    Spain’s Naturgy and Equinor have unveiled the 200 MW Floating Offshore Wind Canarias (FOWCA) project located in the maritime area of ​​eastern Gran Canaria. The FOWCA project, which would be connected to the Barranco de Tirajana substation of Red Eléctrica Española, will be developed using semi-submersible floating platform technology that, among other advantages, allows the […]

  • 12 June 2020
    Wind Farm Update

    Installation of export and inter-array subsea cables at Taiwan Power Company’s Changhua Phase 1 offshore wind farm are set to start on 15 June. The work will be carried out by Jan De Nul’s cable-laying vessels (CLVs) Isaac Newton and Willem de Vlamingh, with the support of Volstad Maritime’s OSV Grand Canyon II. JDR Cable […]

  • 8 November 2019
    Business & Finance

    EnBW reported an operating result of EUR 298.6 million in the Renewable Energies division in the first nine months of 2019, a 38.5% growth compared to the year before. According to EnBW, the increase is due to the overall improvement in wind conditions at offshore and onshore wind farms in Germany, as well as due […]

  • 3 November 2015
    Business & Finance

    Spain’s Acciona posted an attributable net profit of EUR 166 million in the first nine months of 2015, an 11.6% increase compared with the same period in 2014, mainly due to the growth in renewable power generation and the sales of wind turbines manufactured by Acciona Windpower in international markets. Ordinary earnings before tax (EBT) grew 69.5% […]

  • 12 January 2016
    R&D, Technology

    ECN has confirmed that the Fugro Oceanor Seawatch floating LiDAR is in the pre-commercial stage according to the Offshore Wind Accelerator (OWA) roadmap for the commercial acceptance of floating LiDAR technology. In collaboration with RWE, Eneco and Fugro Oceanor, ECN has performed a Fugro Oceanor Seawatch floating LiDAR validation trial near the offshore meteorological mast IJmuiden, […]

  • 30 September 2014
    Operations & Maintenance, Wind Farm Update

    Construction works at London Array Offshore Wind Farm are complete and the wind farm is operational. However, some remedial construction works are required. Due to the long term essential maintenance, the wind turbine D20, located on the west side of the wind farm, has a 500m safety exclusion zone in place from the 8th September […]

  • 22 October 2012
    Business & Finance, Operations & Maintenance

    Mercon and Liandon announce that Imtech has joined their MLK Projects consortium. MLK Projects was founded by Liandon and Mercon earlier this year to market a new innovation in offshore substations named COSS for Compact Offshore Substation. As associated engineering company, KCI was heavily involved in the design. Victor Krijt, Business Development Manager at Liandon […]

  • 5 July 2012

    The 216MW Northwind offshore wind farm project, located in the North Sea, 37km off the Belgian coast, has reached financial close. Mott MacDonald is the lenders’ technical advisor and lenders’ engineer for the project. Northwind will cover an area of approximately 14.5km² and will include 72 Vestas V112 wind turbines each with 3MW capacity. It […]