Search results for: Gwynt y Môr

375 results

A list of search results

  • 19 March 2013
    Grid Connection, Wind Farm Update

    The latest stage in the construction of Gwynt y Môr Offshore Wind Farm, off the North Wales coast, has got underway with the start of inter-array cable installation. The subsea cables will connect all 160 turbines to the two offshore substations already installed more than eight miles off North Wales in Liverpool Bay. The work […]

  • 29 March 2017
    Operations & Maintenance, Vessels, Wind Farm Update

    Fugro will start a geophysical survey in and around the 586MW Gwynt y Môr offshore wind farm in early April, a notice to mariners reveals.

  • 26 January 2015
    Business & Finance, Grid Connection

    Ofgem has decided to grant an offshore transmission licence for the Gwynt y Môr offshore wind farm to a proposed licensee entity set up by a consortium comprising Balfour Beatty Investments Limited and Equitix Limited.  Ofgem noted that the final confirmation of its decision has not yet been made. Gwynt y Môr is a greater than £2billion offshore wind farm which is capable […]

  • 31 March 2015
    Grid Connection

    Lancashire based EDS is marking the completion of a £10m contract for cable termination work at the world’s second largest operating offshore wind farm, with an exemplary health and safety record. EDS has now completed all high voltage and fibre optic cabling works on the 160 wind turbine transition pieces and both offshore substations at the wind farm, located […]

  • 12 July 2012
    Business & Finance, Wind Farm Update

    From spring 2013, A2SEA will play a key role in helping build one of the largest offshore wind farms in the world. A2SEA will provide specialist jack-up’s SEA JACK and SEA WORKER to install 160 Siemens 3.6MW turbines on RWE’s Gwynt y Môr offshore wind farm. Gwynt y Môr offshore wind farm, located off the […]

  • 10 July 2013
    Grid Connection, Wind Farm Update

    All four export cables have been installed at RWE npower renewables’ flagship Gwynt y Môr Offshore Wind Farm off the North Wales coast. The final subsea cable burial was completed between the coast and one of the two offshore substations on Tuesday 2 July. In addition, half of the foundations are finished with a monopile […]

  • 21 October 2020
    Wind Farm Update

    The RWE-led Awel y Môr offshore wind farm has completed its first offshore geophysical exploratory works with Fugro GB Marine Ltd taking the helm. As part of the development of the Awel y Môr wind farm offshore Wales, studies of the seafloor have to be carried out. These in turn will help inform the final […]

  • 5 October 2011

    RWE Innogy today signed agreements on the use of areas at Birkenhead port near Liverpool. From October this year, RWE Innogy will use these areas as a base port for constructing the offshore wind farm Gwynt y Môr (Welsh for “sea wind”). The lease agreements concluded between RWE npower renewables and the Cammell Laird shipyard […]

  • 16 February 2015
    Grid Connection, Wind Farm Update

    The European Investment Bank has agreed to provide GBP 51 million backing for the GBP 352 transmission link to the second largest wind farm in the world. The Gwynt y Môr offshore wind farm, located in Liverpool Bay, eight miles off the north Wales coast, will produce enough electricity to cater for the energy needs […]

  • 17 March 2015
    Business & Finance

    Gwynt y Môr Offshore Wind Farm has announced a £570,000 donation to the Royal National Lifeboat Institution (RNLI) in North Wales and the appointment of Community and Voluntary Support Conwy (CVSC) to administer its £multi-million Community Fund. The substantial funding package for the RNLI will support a new rescue support vehicle to be based at St […]

  • 10 June 2014
    Operations & Maintenance, Wind Farm Update

    Works at the Gwynt y Môr Offshore Wind Farm are in full swing, as several vessels are currently carrying out their job. The cable maintenance vessel Ndurance is expected to start operations at the Gwynt y Môr offshore wind farm today (June 10). Ndurance will work for six weeks in the eastern part of the […]

  • 13 April 2012

    Bladt Industries and EEW SPC have successfully completed the load-out of the first two foundations for the Gwynt Y Môr Offshore Wind Farm located in the Irish Sea. Monday April 9th the Transition Pieces were loaded out from German facilities in Lubmin and subsequently load-out of the two Monopiles, fabricated by EEW SPC in Rostock, […]

  • 10 June 2010
    Environment

    Situated in Liverpool Bay near the North Wales coast, Gwynt y Môr will be one of the largest offshore wind farms in construction, eventually…   [mappress] Source: wirralglobe, June 09, 2010;

  • 23 August 2011
    Operations & Maintenance, Technology

      Demag Cranes has won an order from Granada Material Handling Ltd to supply 164 electric rope hoists for a renewable energy project – the new Gwynt y Môr offshore windfarm in Wales. The order comes in the wake of a contract, awarded to Granada by RWE npower renewables, to design, supply, certify, deliver, test […]

  • 25 December 2018
    Business & Finance

    Innogy has distributed GBP 1.4 million in Wales in 2018 through community funding from its renewable energy projects.

  • 17 June 2014
    Wind Farm Update

    All 160 wind turbine generators at the Gwynt y Môr offshore wind farm are now installed. A2SEA’s jack-up vessel Sea Worker,  supported by Sea Bravo and Sea Echo, was deployed to install Siemens’ 3.6MW turbines. Now, the work is underway on the last wind turbine to fit the blades. Cable laying vessel Sia, owned by […]

  • 12 May 2016
    Business & Finance, Grid Connection

    Germany’s RWE Group recorded an operating result of EUR 154 million at its renewables division in the first quarter of 2016, a slight increase compared to EUR 153 million reported for the same period a year earlier, with two newly commissioned offshore wind farms in the UK and Germany helping offset a one-off income included in […]

  • 13 January 2015
    Business & Finance

    German utility, RWE, has slashed its renewables investment plans to EUR 1 billion from 2015 to 2017, having invested the same amount between 2008 and 2014. This move comes after the company’s debt reached EUR 31 billion due to crisis in the power sector. Hans Buenting, chief executive of RWE Innogy, said: “These are the […]

  • 10 September 2014
    Grid Connection, Wind Farm Update

    Fugro has undertaken two key tasks at the Gwynt y Môr offshore wind farm, successfully completing the trenching and burial of inter-array cables for CT Offshore and providing unexploded ordnance (UXO) survey support. Once complete, RWE Innogy’s 160-turbine Gwynt y Môr, in the Irish Sea off the North Wales coast, will be the second largest […]

  • 7 January 2011

    RWE npower renewables has today announced the award of a multi-million pound inter-array cabling contract to Draka Offshore for Gwynt y Môr… By Anna Ohlden (science20) [mappress] Source: science20, January 07, 2011

  • 20 January 2015
    Operations & Maintenance

    Hughes Sub Surface Engineering (SSE) Have received another safety award for their work on the world’s second largest wind farm – Gwynt y Môr. Colin Christian of RWE presented the award to Managing Director Ian Hughes at the O&M Base in Mostyn. After Ian Hughes accepted the award, he commented: “Hughes SSE’s operations on the […]

  • 22 April 2013

    The SEA JACK jack-up vessel has anchored in the Carrick Roads in the UK, seeking shelter from bad weather conditions on its way from IJmuiden to Mostyn in North Wales, the Falmouth Packet informs. Along with the sheerlegs vessel Norma 1, which is on her journey to the Suez Canal for wreck removal operations, the […]

  • 14 April 2022
    Grid Connection, Operations & Maintenance, Wind Farm Update

    The Gwynt Y Mor offshore wind farm in the UK is set to undergo a pre-construction survey of its export cable corridor, following a series of export cable issues. Titan Endeavour will carry out the work, starting around 15 April and scheduled to take up to seven days, subject to weather conditions. The pre-survey of […]

  • 26 July 2013
    Grid Connection

    Ofgem has appointed the Balfour Beatty Equitix Consortium as the preferred bidder to own and operate the high voltage transmission links to the Gwynt y Môr wind farm. At 576MW it is currently the second largest project to have reached this tender stage. The estimated value of the transmission assets is £346m. Balfour Beatty Equitix […]

  • 16 April 2015
    Vessels

    Tidal Transit’s personnel transfer vessel (PTV) Tia Elizabeth is following its sister vessel, Kitty Petra, to fulfill a contract at Gwynt y Môr offshore wind farm off the Welsh coast. While the contract for Kitty Petra ended in September 2014, after which she moved on to the Westermost Rough offshore wind farm, the contract for Tia Elizabeth, due […]

  • 21 July 2021
    Grid Connection, Operations & Maintenance, Wind Farm Update

    An uncrewed surface vessel (USV) is set to begin a hydrographic survey at the operational Gwynt y Môr offshore wind project located off the North Wales Coast. The USV will be performing the hydrographic survey of the export routes from 26 July for up to 7 days until 2 August, subject to weather conditions. The […]