Search results for: drix

374 results

A list of search results

  • 16 January 2012

      Many nations have set challenging targets for renewable energy production and it was in this setting that AMI held the latest global conference on Wind Turbine Blade Manufacture in December 2011 in Dusseldorf, Germany. The UK Minister for the Environment had announced potential plans for another 29,000 wind turbines mainly offshore, and Siemens Energy […]

  • 13 August 2013

    When working offshore there should be one golden rule: Safety first! All kinds of legislation and regulations have been set up to ensure that both the health and safety of the employees are respected, in facet of their work, and rest time, offshore. However these rules can vary by country and also by the different […]

  • 12 June 2013

    Since April 2012 the wind farm support vessel industry has experienced success and failure, both large and small. 2012 will be remembered for the number of new vessels built and delivered to operators, but predominantly it will be the collapse of South Boats Special Projects in the autumn that shook this sector of the industry […]

  • 15 August 2014

    Year: 2013  Type: Windfarm Service Vessel FCS 2610  Length (m): 20,00  Classification: MCA1  Deck Area (m2): 32  Max. Load (t): 5  Crane: 1 x Stern Mounted Crane  Engines: 2 x Caterpiller C32, 1319 HP  Propulsion:   Fuel Load (l):   Sleeping Berths: 4 

  • 30 May 2017
  • 10 April 2017

    Year:   Type:   Length (m):   Classification:   Deck Area (m2):   Max. Load (t):   Crane:   Engines:   Propulsion:   Fuel Load (l):   Sleeping Berths:  

  • 10 April 2017

    Year:   Type:   Length (m):   Classification:   Deck Area (m2):   Max. Load (t):   Crane:   Engines:   Propulsion:   Fuel Load (l):   Sleeping Berths:  

  • 15 August 2014

    Year:   Type: Wind Farm Service Vessel  Length (m): 19,00  Classification: MCA1,2  Deck Area (m2): 34  Max. Load (t): 7  Crane: 1 x Palfinger 6500 Hydraulic  Engines: 2 x Cummins QSK19, 800 HP  Propulsion:   Fuel Load (l):   Sleeping Berths: 2 

  • 30 May 2017

    By deploying fast, high performance vessels for this purpose, they are able to operate very competitively. The vessels are equipped to gather data at a speed of no less than 20 knots, with a maximum wave height of 3.50 metres. Special depth measurements are done allowing clients to effectively manage working processes like dredging-, port-and-water-way-maintenance […]

  • 13 February 2023
    Business development, Collaboration, Equipment, Infrastructure, Innovation, Market Outlooks, Outlook & Strategy, Research & Development, Transition

    Clarksons Offshore Renewables team is a leader in offshore vessel chartering, newbuilding, offshore logistics and strategic marine advisory services. Supporting all vessel types and all offshore energy sources, we’re your go-to partner for all stages and sizes of offshore renewables projects. We continue to push the boundaries and stay at the heart of the marine […]