Singapore-based marine and offshore engineering group Sembcorp Marine has landed a contract with Jan De Nul to fabricate 15 jacket foundations for the Formosa 2 offshore wind farm in Taiwan. Located four kilometres offshore Miaoli County in the Taiwan Strait, the 376MW Formosa 2 will be Taiwan’s lar
The 962-ton Northwester 2 offshore high voltage station has completed its journey from Aalborg, Denmark to the Port of Oostende in Belgium. The Port of Oostende will be a temporary home to the substation prior to the installation at the site some 48 kilometres north-west of Oostende. The substation’
All 31 MHI Vestas 8.4MW monopile foundation wind turbines have been installed on the 269MW Deutsche Bucht offshore wind farm in the German North Sea, Northland Power said. The commissioning of the installed wind turbines is ongoing. The wind farm’s remaining two MHI Vestas wind turbines will be inst
A bipartisan group of US East Coast state governors has urged the Trump administration to expeditiously complete the environmental review of the Vineyard Wind so that a Record of Decision for the offshore wind project can be issued by March 2020. In a letter sent to the US Department of Interior and
UK-based Specialist Marine Consultants (SMC) has been awarded a contract to provide marine coordination services to Siemens Gamesa across the Formosa 1 Phase 2 offshore wind farm in Taiwan. The Formosa 1 Phase 2 project will comprise 20 6MW Siemens Gamesa wind turbines and is an extension to the alr
The Crown Estate has completed the plan level Habitats Regulations Assessment (HRA) for the 2017 offshore wind project extension applications confirming that seven out of the eight projects which applied will now progress to the award of rights. The HRA, which The Crown Estate has undertaken as a re
A consortium including DEME and Eiffage Métal has won an engineering, procurement, construction, and installation (EPCI) contract for 80 foundations at the Saint-Nazaire offshore wind farm in France. The scope includes the design, fabrication, and installation of full face drilled monopile foundatio
Fred. Olsen Windcarrier’s jack-up vessel Bold Tern has installed 79 turbines at the Hornsea Project One offshore wind farm in the UK. According to the company, Bold Tern is on its way back to the Port of Hull to pick up another load of Siemens Gamesa turbines for the 1.2GW project. Hornsea Project O
Danish transmission system operator Energinet has issued a tender for the procurement of services regarding an unexploded ordnance (UXO) Box survey for the Thor offshore wind farm. Energinet is performing the initial geophysical and geotechnical investigations in the Danish North Sea prior to the pr
Sif Holding has entered into an agreement with DEME Offshore to use Maasvlakte 2 in the Netherlands for marshaling services for the Borssele 1 & 2 offshore wind project. The deal comes as Sif agreed with the Port of Rotterdam on the lease of an additional 20ha of industrial land, adjacent to the com
The UK-based Better Risk has begun providing unexploded ordnance (UXO) risk management support for the Triton Knoll offshore wind farm in the UK. Better Risk is providing quality assurance of planned explosive risk-management support throughout the project lifecycle, while James Fisher Marine Servic
The offshore substation built for the Northwester 2 offshore wind farm has left Bladt Industries’ facility in Aalborg, Denmark, and is on its way towards the project site in Belgium. Bladt designed, built and assembled the substation with its partners Semco Maritime and ISC under a contract won in M
Van Oord’s offshore installation vessel MPI Resolution has started a blade repair and upgrade campaign at the Princess Amalia offshore wind farm in the Netherlands. MPI Offshore, a subsidiary of Van Oord, has won a contract to repair and upgrade all the blades for 29 out of the 60 turbines at the 12
FairWind has completed the pre-assembly of all towers for the EnBW Hohe See and Albatros offshore wind projects in Germany. According to the company, all 87 towers have been pre-assembled for the wind farms at the Port of Esbjerg with the help of crane partner BMS A/S. Hohe See and Albatros have a c