Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Grid ConnectionBusiness & FinanceContracts & TendersJobs & Recruitment
Lamprell team in from of the last Moray East jacket foundations at the facility in Dubai
Wind Farm Update

Lamprell Wraps Up Moray East Jacket Delivery

The last jacket foundations manufactured by Lamprell for the Moray East offshore wind farm have been loaded onto a heavy lift vessel at Rig Metals in Dubai, UAE, and will soon set sail to Europe. According to DEME Offshore, the last jacket delivery from Lamprell and the recent installation of the th

about 6 years ago
Construction on Dutch Offshore Wind Farm Enters Final Stretch
Wind Farm Update

Construction on Dutch Offshore Wind Farm Enters Final Stretch

Around three-quarters of wind turbines have been installed at the 731.5 MW Borssele III and IV wind farm off the Netherlands, MHI Vestas said. The first of the wind farm’s 77 MHI Vestas 9.5 MW turbines was installed at the site some 55 kilometres off Vlissingen at the end of May. Van Oord’s installa

about 6 years ago
EDS HV Wraps Up Substation Maintenance at Welsh Offshore Wind Farm
Wind Farm Update

EDS HV Wraps Up Substation Maintenance at Welsh Offshore Wind Farm

EDS HV Group has completed substation maintenance work at the Rhyl Flats offshore wind farm located off the coast of North Wales. Maintenance work was done for every electrical asset, including 132kV open mesh switches, power transformers, auxiliary transformers, battery systems, shunt reactors and

about 6 years ago
First Turbine Installed at TPC Changhua Phase 1
Wind Farm Update

First Turbine Installed at TPC Changhua Phase 1

Jan De Nul’s jack-up vessel Taillevent has installed the first turbine at Taiwan Power Company’s Changhua Phase 1 offshore wind project. The 109.2 MW project will feature a total of 21 Hitachi 5.2 MW turbines with a downwind rotor mounted on jacket foundations. According to Jan De Nul, with the firs

about 6 years ago
Galloper Offshore Wind Farm in the UK
Wind Farm Update

Galloper Bolsters Green Credentials

The Galloper offshore wind farm in the UK has received the ISO 14001 certificate in recognition of improved environmental performance. Awarded by Lloyds Register, the ISO 14001:2015 is an internationally recognized Environment Management System (EMS) that highlights continuous improvement and reduce

about 6 years ago
GE Grid Solutions Kit for Saint-Brieuc Offshore Substation
Wind Farm Update

GE Grid Solutions Kit for Saint-Brieuc Offshore Substation

Ailes Marines has selected GE Renewable Energy’s Grid Solutions to provide the main electrical equipment for the Saint-Brieuc Bay offshore wind farm’s substation. GE’s Grid Solutions will be in charge of the design, manufacturing, installation, and commissioning of the high-voltage electrical equipm

about 6 years ago
UXOcontrol-and-Louis-Dreyfus-Checking-Saint-Brieuc-Site
Wind Farm Update

UXOcontrol and Louis Dreyfus Checking Saint-Brieuc Site

UXOcontrol and its consortium partner Louis Dreyfus TravOcean have secured a contract to carry out the UXO identification and debris removal campaign at the Saint-Brieuc offshore wind project in France. The campaign mobilized in July with Louis Dreyfus Armateur’s UXO survey and identification vessel

about 6 years ago
Geotechnical Survey Needed for Irish Offshore Wind Farm
Wind Farm Update

Geotechnical Survey Needed for Irish Offshore Wind Farm

Codling Wind Park Ltd has issued a contract notice for an offshore geotechnical survey across the Codling wind farm and the export cable route off the east coast of Ireland. The survey will include geotechnical boreholes with samplings and in-situ testings, seabed CPTs, seismic seabed CPTs, grab sam

about 6 years ago
First Nacelle for France's First Offshore Wind Farm Rolls Out
Wind Farm Update

First Nacelle for France’s First Offshore Wind Farm Rolls Out

GE Renewable Energy has produced the first turbine nacelle for the 480 MW Saint-Nazaire – France’s first offshore wind farm. This nacelle, which contains the generator, is the first in a series of 80 Haliade 150-6 MW wind turbines produced for the Saint-Nazaire offshore wind farm to be assembled by

about 6 years ago
ODE to Design Polish Offshore Wind Farm
Wind Farm Update

UK Firm to Design Polish Offshore Wind Farm

Polish energy company PKN Orlen has selected the UK-based Offshore Design Engineering (ODE) to carry out preliminary technical and construction design of an offshore wind farm in the Baltic Sea. As part of the contract, ODE has agreed to work with Polish companies on the project. The project will in

about 6 years ago
LOC Wraps Up French Offshore Wind Work
Wind Farm Update

LOC Wraps Up French Offshore Wind Work

Longitude, part of LOC Group, has completed a range of environmental engineering analyses for the Saint-Nazaire offshore wind project to support the planning for the export cable installation operations. Under the contract with Prysmian, the work included analysis of vessel grounding and mooring in

about 6 years ago
Avangrid Opens Offshore Wind Office in Virginia
Wind Farm Update

Avangrid Opens Offshore Wind Office in Virginia

Avangrid Renewables, the developer of the Kitty Hawk offshore wind project, has opened a new Virginia field office to support project development and help ignite a new industry off the coast of Virginia and North Carolina. Kitty Hawk is a proposed offshore wind energy project to be built approximate

about 6 years ago
Bladt Starts Shipping Out Hornsea Two Hardware
Wind Farm Update

Bladt Starts Shipping Out Hornsea Two Hardware

Bladt Industries has loaded out the first six out of the 135 anode cages built for the 1.4 GW Hornsea Project Two offshore wind farm. The first six transition pieces will soon follow, Bladt Industries said. The Danish company is in charge of manufacturing and delivering 135 transition pieces for the

about 6 years ago
OHT Firms Dogger Bank B Deal
Wind Farm Update

OHT Firms Dogger Bank B Deal

Dogger Bank Wind Farm has signed the contract with OHT to transport and install foundations for the second phase of the world’s largest wind farm – the 3.6 GW Dogger Bank. Dogger Bank Wind Farm and OHT signed the contract for the 1.2 GW Dogger Bank A phase in July. The new contract covers the [&hell

about 6 years ago
  • 1
  • …
  • 276
  • 277
  • 278
  • …
  • 645