The industrial and technology group ThyssenKrupp has started operation of a new test and development center for slewing rings in Lippstadt. Covering an area of 3,000 square meters, the facility is one of the biggest and most modern of its kind in the world. It will be used to test and optimize slewi
The nearshore wave energy technology, WaveRoller®, has got the second endorsement from Lloyd’s Register Energy (LRE). The concept design was evaluated in accordance with Lloyd’s “Qualification of New Technology”- and “Qualification Management” –standards. Lloyd’s Register Energy states that the qual
Wind lidar technology company ZephIR Lidar has released a fully-marinised wind lidar – ZephIR 300M – for the offshore wind and meteorological industries, founded on the company’s remote wind measurement device, ZephIR 300. ZephIR 300M, designed specifically for offshore use, includes as standard: A
AXYS Technologies Inc will now sell its TRIAXYS Wave Buoy directly through its new European office in Belgium and sales office in France. As part of this new European Sales Campaign, the TRIAXYS Wave Buoy has been priced so that it is now the most competitive commercial wave buoy in the market at 30
Offshore Marine Management (OMM) has commenced delivery of a long term scope for Cable Management Consultancy services to Wave Hub Ltd, based in Hayle Cornwall. Wave Hub Ltd is the operating company that manages Wave Hub, a UK-based wave energy test site helping the marine industry harness the abund
The BlueTEC Texel Tidal partnership is now planning the installation of a second, larger turbine following the successful first months of operating the BlueTEC tidal energy platform. “Getting the platform from the drawing board to a grid-connected operating reality in just 6 months is amazing,” says
ABS Group Ltd. has issued its certification of the design basis for Ocean Resource Ltd’s innovative Sea Breeze Gravity “float-out-and-sink” offshore wind turbine foundation system. ABS Group issued its certification in accordance with the relevant standards, including IEC 61400 and the ABS Guide for
Orkney Islands Council continued its work to install a new marine traffic system west of Orkney last Friday. A 16-foot long radar piece of a new VTS (vessel traffic system) was transferred by helicopter from EMEC’s Billia Croo wave test site to the Black Craig. The Black Craig, which EMEC uses as an
A collaborative effort between Instream Energy Systems Corp. of Canada and IT Power Consulting Ltd. of the UK has been approved for financial support from the National Research Council of Canada Industrial Research Assistance Program (NRC-IRAP) and been awarded the EUREKA label. Instream Energy Syst
Adwen and Fraunhofer IWES have signed an agreement to test the drivetrain for Adwen’s next generation turbine of 8MW rated power, the largest offshore turbine on the market. Under the terms of the agreement, the 8MW drive train will be tested in IWES´s new Dynalab (Dynamic Nacelle Testing Laboratory
Cyberhawk Innovations, a specialist in aerial inspection and surveying using Remotely Operated Aerial Vehicles (ROAV), also known as UAVs or drones, has marked its busiest ever year in the renewables sector with the launch of a commercial scale inspection solution for wind turbine blades. This year,
Mojo Maritime’s marine project planning system, Mermaid, is currently undergoing detailed testing with a number of key clients, as the company aims to launch it towards the end of October 2015. Mermaid, Marine Economic Risk Management Aid, gives companies involved in marine operations a more detaile
During August and September 2015, Sound & Sea Technology, Inc. (SST) has managed and participated in the assembly and systems integration of the first Wave Energy Conversion (WEC) device for the U.S. Navy’s Kaneohe Bay Wave Energy Test Site (WETS) in Hawaii. Since May 2015, SST has been assembling a
The new LORC Component & Structure Testing Centre, being established in collaboration with FORCE Technology, is well under way, LORC reported. All major investments have been realized, and the building of the facilities has commenced. In May, all excavation was performed for the out-door structural