offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Fixed-Bottom

Loading filters...
FeaturedHeadlinesAuthoritiesBusiness & FinancePlanning & PermittingProject UpdatesWind Farm UpdateSupply ChainWind TurbinesContracts & Tenders
Centre Manche 2 TotalEnergies RWE
Fixed-Bottom

TotalEnergies-RWE Consortium Wins France’s Largest Offshore Wind Tender as RWE Signals Exit

A consortium between TotalEnergies and RWE has won the Centre Manche 2 tender to develop a 1.5 GW offshore wind farm off the coast of Normandy, making it the largest renewable energy initiative in France to date. As part of a strategic review of its investment, RWE has expressed the wish to exit the

about 11 months ago
Orsted Revolution Wind COP
Fixed-Bottom

Offshore Construction Work Resumes on Revolution Wind After US Judge’s Ruling

A US judge in Washington has cleared the way for work to resume on the 704 MW Revolution Wind offshore wind farm after granting a temporary injunction that lifted the federal stop-work order imposed in August. On 22 August, the US Department of the Interior’s (DOI) Bureau of Ocean Energy Management

about 11 months ago
Scroby Sands RWE
Fixed-Bottom

Fire-Damaged Turbine Being Removed at RWE’s UK Offshore Wind Farm

More than two years after a fire caused damage, a wind turbine at the Scroby Sands offshore wind farm in the UK is being removed by RWE. In August 2023, turbine T06 at the 58 MW Scroby Sands offshore wind farm caught fire in the nacelle, with the fire extinguishing on its own. Work to […]

about 11 months ago
Tahkoluoto, Finland's first offshore wind farm
Fixed-Bottom

Metsähallitus Picks Arenso for Offshore Wind EIA Work in Finland

Finnish state-owned enterprise Metsähallitus has selected Arenso Oy to carry out the technical planning of the environmental impact assessment (EIA) programme phase of the Ebba offshore wind project in Finland. The planning work will commence in autumn 2025. Arenso is responsible for the early-stage

about 11 months ago
Cadeler to Install Turbines at Ocean Winds’ First Polish Offshore Wind Project
Fixed-Bottom

Cadeler to Install Turbines at Ocean Winds’ First Polish Offshore Wind Project

Cadeler has signed a firm contract with Ocean Winds for the transportation and installation of turbines at the 390 MW BC-Wind offshore wind farm in Poland. The installation is planned to commence in 2028 and to continue for approximately four months. Cadeler will deploy one of its O-class wind turbi

about 11 months ago
Vestas Kitakyushu Hibikinada offshore wind farm
Fixed-Bottom

All Vestas Turbines Stand at 220 MW Japanese Offshore Wind Farm

Installation of all 25 Vestas V174-9.6 MW turbines at Japan’s Kitakyushu-Hibikanada offshore wind farm has been completed. Back in February 2017, the government of Kitakyushu City selected the consortium of Kyuden Mirai Energy, Kyuden Corporation, Hokutaku Renewable Energy Service, J-Power, and Saib

about 11 months ago
Synera Renewable Energy Siemens Gamesa Formosa 4
Fixed-Bottom

SRE’s Formosa 4 Offshore Wind Farm to Feature Siemens Gamesa 14 MW Turbines

Synera Renewable Energy (SRE) has partnered with Siemens Gamesa for the third time, selecting the company to supply 35 14 MW turbines for the Formosa 4 offshore wind farm in Taiwan. The turbines will be provided by Siemens Gamesa’s industrial nacelle factory in Taichung, Taiwan. The wind turbine fou

about 11 months ago
A photo of the Block Island Wind Farm's turbine with a US flag visible on the right
Fixed-Bottom

Trump Administration Moves to Vacate Federal Approval for Maryland Offshore Wind Project

[NOTE: Article updated on 16 September with a statement from US Wind and to specify project capacity as 1.7 GW.] The US Department of the Interior (DOI) has filed a motion in the US District Court in Maryland to remand and/or vacate its approval of the Construction and Operations Plan (COP) for US W

about 11 months ago
Western Australia Offshore Wind Project Set in Motion
Fixed-Bottom

Origin-RES Joint Venture Puts 1.5 GW Australian Offshore Wind Project on Hold

The developers behind the 1.5 GW Navigator North offshore wind farm in Australia have announced that they do not plan to participate in the state’s first round auction. The Navigator North offshore wind farm is being developed by a joint venture between Origin Energy and Renewable Energy Systems (RE

about 11 months ago
Ørsted Initiates EUR 8 Billion Rights Issue to Build Sunrise Wind, Cover Revolution Wind Halt Impact
Fixed-Bottom

Ørsted Initiates EUR 8 Billion Rights Issue to Build Sunrise Wind, Cover Revolution Wind Halt Impact

Ørsted is launching the rights issue announced last month, offering new shares with pre-emptive rights to existing shareholders during the period from 19 September to 2 October 2025. The company is looking to raise DKK 60 billion (around EUR 8 billion) to fund the construction of the Sunrise Wind pr

about 11 months ago
US Interior Secretary: ‘No Future for Offshore Wind Under This Administration’
Fixed-Bottom

US Interior Secretary: ‘No Future for Offshore Wind Under This Administration’

US Interior Secretary Doug Burgum said at a press conference on 10 September that offshore wind has no future in the US under the Trump administration and that the government was reviewing five offshore wind projects that are now under construction. Speaking to the press at the Gastech event in Mila

about 1 year ago
A photo of the Galloper offshore wind farm for illustration
Fixed-Bottom

UK Gov’t Pushes Back Ruling on RWE’s Five Estuaries Offshore Wind Farm

The UK government has extended the deadline by three months for a decision on the development consent order for RWE’s 1.1 GW Five Estuaries offshore wind farm. The statutory deadline for the decision on the Five Estuaries offshore wind farm was 17 September 2025. However, the UK Energy Secretary, Ed

about 1 year ago
Seaway7 Dogger Bank C
Fixed-Bottom

All Monopiles Installed at World’s Largest Offshore Wind Farm

Seaway7’s Seaway Strashnov has installed the final monopile at Dogger Bank C, the third phase of the 3.6 GW Dogger Bank Wind Farm, the world’s biggest offshore wind farm under construction, in the UK. This marks the completion of 277 monopile foundations installed by Seaway7 across Dogger Bank A, B,

about 1 year ago
First Foundation Dieppe Le Treport Ocean Winds
Fixed-Bottom

First Turbine Jacket Foundation In Place at Dieppe Le Tréport

The first wind turbine foundation has been installed at the 496 MW Dieppe Le Tréport offshore wind farm in France, developed by Eoliennes en Mer Dieppe Le Tréport (EMDT), a joint venture between Ocean Winds, Sumitomo Corporation, and Banque des Territoires. The foundations are steel jackets fabricat