DNV GL Wind at Sea Breakfast session detail page

DNV GL Wind at Sea Breakfast session
  • Date:
    November 24th 2015 until November 24th 2015
  • City:
    London , United Kingdom

Event location

  • Olympic Stadium
  • Queen Elizabeth Olympic Park , London , E20 2ST
  • United Kingdom

At this exclusive breakfast session DNV GL will guide you, with contributions from PwC and Eneco, through the top 5 critical issues for your offshore wind business case:

  • Wind Resource Assessment. How reliable is your wind resource data? And which model do you choose? How to interpret different figures from different methodologies? The quality of your wind resource assessment has immediate and far-reaching impact on the success of your business case. If your wind output estimates are too low, you lose straight away. If they are too high, you lose in the end.
  • Wind Farm Design. How to optimize turbine positioning and technological design, as to ensure optimal financial performance? Which aspects affect your business case and to what extent?
  • Turbine & Foundation Design. Looking at the upcoming cost reduction targets for 2016 and beyond: how to realize cost reductions of our offshore wind parks with 40% or even 50%? How to organize this and how to realize? What to expect from a technology point of view?
  • The winner takes it all – can financing make the difference? What is required to win tenders? What are the key parameters which can make the difference and which role can financing play? Which options are available?
  • Offshore operations & maintenance – challenges and risks. How to organize an efficient and comprehensive operations & maintenance strategy? From timing of maintenance to deployment of helicopters and ships: a smart O&M strategy is a winner for your business case.

More info

Related events

List of related events