Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›GEOxyz Secures IJmuiden Ver Geophysical Survey Work
Contracts & Tenders

June 19, 2020 · about 6 years ago

GEOxyz Secures IJmuiden Ver Geophysical Survey Work

The Netherlands Enterprise Agency (RVO.nl) has awarded GEOxyz BVBA with the contract to carry out geophysical surveys at the IJmuiden Ver offshore wind zone. Under the contract, GEOxyz will conduct geophysical investigations required to obtain the soil information at a part of the Ijmuiden Ver zone

2 minutes read
  • LinkedIn
  • X
  • Email
GEOxyz Secures IJmuiden Ver Geophysical Survey Work
Tennet/Illustration

The Netherlands Enterprise Agency (RVO.nl) has awarded GEOxyz BVBA with the contract to carry out geophysical surveys at the IJmuiden Ver offshore wind zone.

Under the contract, GEOxyz will conduct geophysical investigations required to obtain the soil information at a part of the Ijmuiden Ver zone in the Dutch North Sea.

The acquired soil information will be made available to all potential bidders for offshore wind farms in the Netherlands.

The objective of the geophysical soil investigation is to improve the bathymetrical, morphological, and geological understanding of the wind farm zone, and the identification of objects in the designated wind farm sites.

Another objective is to obtain geophysical information on these locations, which is suitable for the preparation of geotechnical investigations and suitable to progress the design and installation requirements for offshore wind farms, including, but not limited to foundations and infield cables.

The contract, valued at around EUR 4.2 million, is expected to be completed by April 2021. The fieldwork is scheduled to start in spring/summer 2020.

As reported earlier, RVO.nl hired BLIX to support the soil investigations at the wind farm zone located some 62 kilometres offshore.

The 4 GW IJmuiden Ver is one of three sites identified by the Dutch Offshore Wind Energy Roadmap 2030, which have a combined capacity of 6.1 GW and are expected to help the Netherlands reach the target of 11.5 GW of offshore wind capacity by 2030. The wind farms are expected to be commissioned between 2024 and 2030.

There will be four wind farm sites designated within the 400 km2 IJmuiden Ver zone, IJmuiden Ver I,II, III, and IV.

The Dutch government will issue two tenders for the permits to develop the sites, in 2023 for IJmuiden Ver I and II and in 2025 for IJmuiden Ver III and IV.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Contracts & TendersWind Farm Update

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Pacifico Energy Launches Survey Campaign for 1.8 GW Offshore Wind Projects in Vietnam
  2. 2Inter-Array Cable Installation About to Start at 2.9 GW UK Offshore Wind Farm
  3. 3Ørsted Orders Third Saab Seaeye Cougar ROV for Offshore Wind Operations
  4. 4Hampidjan Advant to Equip Cadeler's Wind Ace for East Anglia Two Job

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free