Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›‘Rem Forza’ Working on Sheringham Shoal
Operations & Maintenance

December 1, 2014 · about 11 years ago

‘Rem Forza’ Working on Sheringham Shoal

The vessel Rem Forza will be undertaking essential retrofit operations throughout the Sheringham Shoal Offshore Wind Farm site form 24th November. She will navigate onto the wind farm site through the North-East entry/exit gate between wind turbine generator Sheringham Shoal (WTG ShS) F1 in position

1 minutes read
  • LinkedIn
  • X
  • Email

The vessel Rem Forza will be undertaking essential retrofit operations throughout the Sheringham Shoal Offshore Wind Farm site form 24th November.

She will navigate onto the wind farm site through the North-East entry/exit gate between wind turbine generator Sheringham Shoal (WTG ShS) F1 in position 53°09.662’N 01°07.852’E and WTG ShS K5 in position 53°07.196’N 01°12.011’E.

The vessel is expected to remain on site for 8-10 weeks, and will make scheduled port calls during this time for supplies and crew changes. All entering and exiting site will be done through the North-East entry/exit gate.

All vessels are to give Rem Forza a 500m exclusion zone and to call the vessel on CH10 to request entry or transit through the exclusion.

[mappress mapid=”14905″]

Source: KIS-ORCA; Image: Scira (Archive)

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

Operations & MaintenanceVessels

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Gets New Offshore Wind Farm as All Turbines Installed at 704 MW Revolution Wind
  2. 2Vietnam-Made Cable Layer Enters Into Service in Taiwan
  3. 3Germany’s 960 MW He Dreiht Offshore Wind Farm Inaugurated
  4. 4200th Vestas V236-15.0 MW Wind Turbine Installed Offshore

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free