offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Business & FinanceOperations & MaintenanceVesselsR&DTechnologyEnvironmentContracts & TendersGrid Connection
SSE Ups Output from Renewables
Wind Farm Update

SSE Ups Output from Renewables

SSE has marked a 21.4 increase in total electricity output from renewable sources for the nine months ended 31 December, 2015, compared to the same period a year earlier. The Perth-headquartered energy company’s output from renewable resources, including offshore wind farms, was 6.8 TWh for the peri

about 10 years ago
DONG Sets Up Burbo Bank Construction Base in Birkenhead
Wind Farm Update

DONG Sets Up Burbo Bank Construction Base in Birkenhead

DONG Energy has signed a lease for construction base facilities at the Cammell Laird site in Birkenhead to serve as the focal point for the construction of the 288 MW Burbo Bank Extension offshore wind farm. It is expected that the site will employ up to 50 people, with the UK supply chain further b

about 10 years ago
Finland to Build 40 MW Offshore Wind Farm
Wind Farm Update

Finland to Build 40 MW Offshore Wind Farm

Finnish wind energy developer Suomen Hyötytuuli Oy will start building a 40 MW offshore wind farm in Pori this spring, the company informed this morning. The project, worth almost EUR 120 million, is the world’s first offshore wind farm suitable for icy conditions, according to Suomen Hyötytuuli. Si

about 10 years ago
Mainstream Raring to Build 450 MW Neart na Gaoithe OWF
Wind Farm Update

Mainstream Raring to Build 450 MW Neart na Gaoithe OWF

Mainstream Renewable Power is in exclusive discussions with a consortium led by power company InterGen to take its 450 MW Neart na Gaoithe offshore wind farm to financial close and into construction. The consortium also includes Siemens Project Ventures, The Marguerite Fund and Infrared Capital. Spe

about 10 years ago
Photo of the Day: Nordsee One Foundations Falling into Place
Wind Farm Update

Photo of the Day: Nordsee One Foundations Falling into Place

RWE AG has shared a photo of the world’s biggest jack-up vessel in operation, Innovation, installing one of 54 foundations at the 332MW Nordsee One offshore wind farm in the German waters of the North Sea. The installation work is being carried out by GeoSea, part of DEME Group. The contract include

about 10 years ago
Norfolk Marine Completes Phase 1 of Scroby Sands Subsea Inspection
Wind Farm Update

Norfolk Marine Completes Phase 1 of Scroby Sands Subsea Inspection

Norfolk Marine Ltd has completed the first phase of a three year framework agreement with E.on Climate & Renewables UK Offshore Wind Ltd to provide subsea inspection services to Scroby Sands offshore wind farm. A full assessment of the condition of all subsea structures on the site is being carried

about 10 years ago
Hexicon Moves Forward with Scottish Floating OW Project
Wind Farm Update

Hexicon Moves Forward with Scottish Floating OW Project

Swedish design and engineering company Hexicon AB has submitted a scoping report to Marine Scotland for its proposed floating wind demonstration project off Dounreay, Scotland. The Dounreay Trì project will consist of a single semi-submersible platform and two wind turbines with a total capacity of

about 10 years ago
Rampion Shakes Off Bad Weather
Wind Farm Update

Rampion Shakes Off Bad Weather

The Rampion offshore wind farm project remains on schedule with the installation of the first turbine foundation due to start this week, despite adverse weather conditions disrupting enabling works to prepare the seabed, according to E.ON. The 400MW project, being built by E.ON, the UK Green Investm

about 10 years ago
Vattenfall Wraps Up First Ever Offshore Wind Farm Decommissioning
Wind Farm Update

Vattenfall Wraps Up First Ever Offshore Wind Farm Decommissioning

Vattenfall’s Yttre Stengrund wind farm has disappeared from the horizon in Kalmar Sound, Sweden, the power company said in a statement. Work on dismantling the five wind turbines with a total capacity of 10 megawatt (MW) which made up the Yttre Stengrund wind farm in Kalmar Sound began at the end of

about 10 years ago
DONG Energy to Develop Another OWF Project in Germany
Wind Farm Update

DONG Energy to Develop Another OWF Project in Germany

DONG Energy has acquired project rights for OWP West offshore wind farm from Erste Nordsee-Offshore-Holding GmbH, a company owned by STRABAG and Northern Energy Projects. Information about the acquisition first appeared in late December 2015, after DONG Energy took over the project on 16 December, 2

about 10 years ago
Trianel Windpark Borkum Phase 2 Cable Laying Tender Out
Wind Farm Update

Trianel Windpark Borkum Phase 2 Cable Laying Tender Out

Oldenburg-based Trianel Windkraftwerk Borkum II has invited tenders for the production and turnkey installation of the inner park cabling at the 200 MW Trianel Windpark Borkum (TWB) Phase 2, situated in the German exclusive economic zone in the North Sea. The TWB Phase 2 sits 45 kilometers north of

about 10 years ago
Galloper Wind Farm Fund Up For Grabs
Wind Farm Update

Galloper Wind Farm Fund Up For Grabs

Galloper Wind Farm Ltd, the developer of the 336 MW Galloper Offshore Wind Farm, has invited applications for the Galloper Wind Farm Fund (GWFF). The fund aims to contribute to the appearance, setting, conservation, amenity, accessibility and enjoyment of the Suffolk Coast & Heaths AONB and the area

about 10 years ago
CIP Hikes Beatrice Stake
Wind Farm Update

CIP Hikes Beatrice Stake

Scotland-based SSE has sold a further 10% stake in the Beatrice offshore wind farm to its joint venture partner Copenhagen Infrastructure Partners (CIP). SSE now holds a 40% stake in the project, with CIP controlling a 35% stake, and Repsol the remaining 25%. SSE says that the sale marks another key

about 10 years ago
Galloper Gets Quality Inspectors
Wind Farm Update

Galloper Gets Quality Inspectors

Consultant engineers from WSP Parsons Brinckerhoff will provide quality inspection services on the 336MW Galloper Offshore Wind Farm. The company’s engineers will undertake inspection and surveillance planning services including assurance, quality, control and audit services on the sub-sea high volt

about 10 years ago
  • 1
  • …
  • 533
  • 534
  • 535
  • …
  • 644