offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
Business & FinanceVesselsOperations & MaintenanceAuthoritiesR&DTechnologyGrid ConnectionEnvironment
ABS Group to Certify Dounreay Trì
Wind Farm Update

ABS Group to Certify Dounreay Trì

ABS Group Ltd., an England-headquartered provider of technical and certification services, has received a contract to provide third-party certification and design verification services for Hexicon AB for the planned Dounreay Trì floating offshore wind farm demonstrator project in Scotland. The Dounr

about 10 years ago
VIDEO: Bilfinger Getting Busy at Sandbank
Wind Farm Update

VIDEO: Bilfinger Getting Busy at Sandbank

The last of the 72 foundations for the 288MW Sandbank offshore wind farm was installed last Friday with the help of Bilfinger Marine & Offshore Systems, the company which was in charge of transporting and installing the monopile foundations and transition pieces. The foundation installation works st

about 10 years ago
First Turbine Going Up at Gemini
Wind Farm Update

First Turbine Going Up at Gemini

The first power from the 600MW Gemini offshore wind farm being constructed off the coast of the Netherlands could be produced by the end of this month, a spokesperson for the Gemini Windpark told Offshore WIND. The Gemini’s first Siemens 4MW turbine is being installed today, Judith Achterberg, Gemin

about 10 years ago
TU Delft Buys Power from Eneco Luchterduinen OWF
Wind Farm Update

TU Delft Buys Power from Eneco Luchterduinen OWF

Delft University of Technology (TU Delft) and Eneco have signed a power supply contract under which a portion of the university’s needs will be met by the power produced from six turbines at the 129 MW Eneco Luchterduinen offshore wind farm. The contract is part of the Dutch university’s s plan to o

about 10 years ago
DONG Picks SMC’s Site Technicians for Gode Wind
Wind Farm Update

DONG Picks SMC’s Site Technicians for Gode Wind

Specialist Marine Consultants Ltd (SMC) has been awarded a contract to supply site technicians to DONG Energy for its 582 MW Gode Wind 1 and 2 offshore wind farm. SMC and DONG Energy have been collaborating on UK offshore construction projects since 2010, but this is the first time for the UK-based

about 10 years ago
Windstream Takes Canada to Arbitration over CAD 475 Million Damages Claim
Wind Farm Update

Windstream Takes Canada to Arbitration over CAD 475 Million Damages Claim

A panel of international arbitrators will today start the hearing in an arbitration between the Windstream Energy LLC and the Government of Canada regarding the US-based company’s CAD 475 million claim for damages under North American Free Trade Agreement (NAFTA) for lost profit due to the Ontario’s

about 10 years ago
Top News of the Week Feb 8 – 14
Wind Farm Update

Top News of the Week Feb 8 – 14

Second Offshore Wind Farm Decommissioning on the Way DONG Energy is preparing to decommission world’s first offshore wind farm, located off Danish island of Lolland. DONG Energy Takes Up Another U.S. Offshore Wind Site DONG Energy has agreed to take over RES Americas Developments Inc.’s newly assign

about 10 years ago
Photo of the Day: Last Foundation Installed at Sandbank OWF
Wind Farm Update

Photo of the Day: Last Foundation Installed at Sandbank OWF

Vattenfall has marked the installation of the 72nd and final foundation at the 288 MW Sandbank offshore wind farm with this group photo showing those involved in the project. The offshore construction work started in summer of 2015, and despite adverse weather conditions in November and December, th

about 10 years ago
TenneT TSO GmbH Looking For AC Subsea Cable Supplier
Wind Farm Update

TenneT TSO GmbH Looking For AC Subsea Cable Supplier

Bayreuth-based TenneT TSO GmbH has, via DC-Netz BorWin3 GmbH, issued a tender for a supplier of an AC submarine cable to link an offshore wind farm in the German North Sea to the grid connection system. The tender calls for manufacture, supply and installation of the subsea cable in the Cluster 8 of

about 10 years ago
Deutsche Bank to Manage Meerwind Refinancing
Wind Farm Update

Deutsche Bank to Manage Meerwind Refinancing

Deutsche Bank’s Global Transaction Banking division has taken on several mandates for the refinancing of the 288MW Meerwind Süd/Ost offshore wind farm in the German North Sea. Similarly to the recently closed Gode Wind 1 wind farm acquisition financing that Deutsche Bank supported, Global Transactio

about 10 years ago
EMO Nets Wikinger Maritime Coordination Gig
Wind Farm Update

EMO Nets Wikinger Maritime Coordination Gig

EnBW has once again chosen EMS Maritime Offshore GmbH (EMO) to provide a Maritime Coordination team for the construction phase of the 350 MW Wikinger offshore wind farm in the Baltic Sea. Last week, EnBW and Iberdrola, the developer of the Wikinger OWF, signed a contract under which EnBW will handle

about 10 years ago
DONG Sells Half of Burbo Bank Extension to PKA, LEGO
Wind Farm Update

DONG Sells Half of Burbo Bank Extension to PKA, LEGO

DONG Energy has signed an agreement to divest 50% of the Burbo Bank Extension project to Danish pension provider PKA and KIRKBI A/S, parent company of the LEGO Group. Each investor will obtain a 25% ownership interest in the project, and the total purchase price amounts to approximately GPB 660 mill

about 10 years ago
Siemens 7MW Turbine to Be Tested Off Denmark
Wind Farm Update

Siemens 7MW Turbine to Be Tested Off Denmark

Nissum Bredning Vindmøllelaug has submitted the winning bid to the Danish Energy Agency’s (DEA) call for the construction of a pilot project for new offshore wind technology. According to DEA, the 28MW project “Testbed for new technologies and integrated design” proposed by Nissum Bredning Vindmølle

about 10 years ago
Neart na Gaoithe Financial Close Hindered by RSPB’s Legal Action
Wind Farm Update

Neart na Gaoithe Financial Close Hindered by RSPB’s Legal Action

Reaching financial close and entering construction phase for Neart na Gaoithe offshore wind project could be jeopardized by the ongoing judicial review, requested by the Royal Society for the Protection of Birds (RSPB) last year. In January 2015, RSPB submitted a legal challenge of the decisions by

about 10 years ago
  • 1
  • …
  • 530
  • 531
  • 532
  • …
  • 644