Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
AuthoritiesContracts & TendersOperations & MaintenanceBusiness & FinanceTechnologyGrid Connection
East Anglia Consultation Enters Phase 4
Wind Farm Update

East Anglia Consultation Enters Phase 4

ScottishPower Renewables is launching the consultation phase 4 for East Anglia One North and East Anglia Two offshore wind projects in early 2019. This consultation phase will be based around a draft Environmental Statement which will set out the proposed infrastructure and its likely potential envi

about 7 years ago
Hollandse Kust (zuid) III and IV Seabed Lease Fee Remains
Wind Farm Update

Hollandse Kust (zuid) III and IV Seabed Lease Fee Remains

The future operator of the Hollandse Kust (zuid) III and IV wind farms will not be exempt from paying the seabed lease fee for the portions of the wind farms situated within the 12-mile zone of the Dutch territories in the North Sea, according to Eric Wiebes, the country’s Minister of Economic Affai

about 7 years ago
Hornsea One Nears Turbine Installation
Wind Farm Update

Hornsea One Nears Turbine Installation

Windhoist Limited has pre-assembled the first Siemens Gamesa turbines destined for the Hornsea Project One offshore wind farm in the UK. According to the UK-based company, 24 Siemens Gamesa SWT-7.0-154 turbines are now standing ready for the vessel to pick them up next month. Siemens Gamesa awarded

about 7 years ago
Vineyard Wind Meetings to Proceed Despite Shutdown
Wind Farm Update

Vineyard Wind Meetings to Proceed Despite Shutdown

The US Bureau of Ocean Energy Management (BOEM) will reschedule public meetings for the 800MW Vineyard Wind wind projects offshore Massachusetts ”very soon”, according to David Bernhardt, the Interior Department’s Acting Secretary. As previously reported, BOEM postponed public meetings scheduled for

about 7 years ago
First Turbine Up at Chinese Offshore Wind Farm
Wind Farm Update

First Turbine Up at Chinese Offshore Wind Farm

China Communications Construction Company (CCCC) has installed the first out of the 36 5.5MW wind turbines on the 198MW Guangdong Yudean Zhanjiang Wailuo offshore wind farm. CCCC installed the first Mingyang Wind Power MySE5.5/7.0MW unit at the site offshore Guangdong Province, China, in six days, t

about 7 years ago
Ørsted Timetables Ocean Wind Geo Surveys
Wind Farm Update

Ørsted Timetables Ocean Wind Geo Surveys

Fugro will commence geophysical surveys at the Ocean Wind project offshore New Jersey this month, according to the project’s Notice to Mariners. Fugro’s 170-foot research vessel R/V Enterprise will carry out the investigations off the Atlantic and Cape May counties within the Northern section of the

about 7 years ago
Ireland: Parkwind, ESB to Jointly Develop Oriel and Clogherhead OWFs
Wind Farm Update

Ireland: Parkwind, ESB to Jointly Develop Oriel and Clogherhead OWFs

Parkwind and ESB have reached an agreement under which ESB will acquire up to 35% stake in the Oriel offshore wind project in Ireland. The companies will also work together on the Clogherhead offshore wind farm, as Parkwind plans to acquire up to 35% in this project, for which ESB holds a foreshore

about 7 years ago
SSE Issues Offshore Blade Inspection Casting Call
Wind Farm Update

SSE Issues Offshore Blade Inspection Casting Call

SSE Services PLC has invited companies to pre-qualify for a tender to provide offshore blade inspection services using unmanned aerial vehicles (UAVs). More specifically, Greater Gabbard Offshore Winds Limited, a joint venture between SSE plc and innogy, is looking to inspect 105 turbines during 201

about 7 years ago
LiDAR Campaign Starts on FEW Baltic II Offshore Wind Farm
Wind Farm Update

LiDAR Campaign Starts on FEW Baltic II Offshore Wind Farm

Baltic Trade & Invest (BTI) has announced the deployment of a Seawatch Wind LiDAR buoy within the area of the 350MW FEW Baltic II offshore wind farm project in the Polish Baltic Sea. The Seawatch Wind LiDAR buoy will measure a number of parameters at the site some 50km offshore, on the north side of

about 7 years ago
All Horns Rev 3 Turbines In Place
Wind Farm Update

All Horns Rev 3 Turbines In Place

Fred. Olsen Windcarrier’s jack-up vessel Brave Tern has installed the last turbine at the Horns Rev 3 offshore wind farm in Denmark. The jack-up vessel loaded the final batch of the MHI Vestas units destined for the 406.7MW project on 10 January at the Port of Esbjerg. Offshore construction began ba

about 7 years ago
TEPCO and Ørsted Form Offshore Wind Pact, First Stop Japan
Wind Farm Update

TEPCO and Ørsted Form Offshore Wind Pact, First Stop Japan

Japan’s largest power company Tokyo Electric Power Company Holdings, Inc. (TEPCO) and Ørsted have signed a memorandum of understanding to work jointly on offshore wind projects. TEPCO and Ørsted will work jointly on the Choshi offshore wind project near Tokyo, for which TEPCO has been carrying out a

about 7 years ago
TenneT and Vattenfall Pen Hollandse Kust Zuid Grid Agreements
Wind Farm Update

TenneT and Vattenfall Pen Hollandse Kust Zuid Grid Agreements

Grid operator TenneT and wind farm developer Vattenfall have signed agreements for the offshore grid connection for the Hollandse Kust Zuid I and II wind farms in the Dutch North Sea. The agreements relate to the realisation of the connection and the transmission of electricity between Vattenfall’s

about 7 years ago
More Vineyard Wind Meetings Shelved Due to US Government Shutdown
Wind Farm Update

More Vineyard Wind Meetings Shelved Due to US Government Shutdown

The Bureau of Ocean Energy Management (BOEM) will postpone public meetings on its Draft Environmental Impact Statement for the Vineyard Wind offshore wind project originally scheduled for 15-17 January. The public meetings were scheduled to take place in Hyannis, Nantucket, and Martha’s Vineyard, Ma

about 7 years ago
Belgium Blows Past 1GW Offshore Wind Mark as Rentel Goes Full Throttle
Wind Farm Update

Belgium Blows Past 1GW Offshore Wind Mark as Rentel Goes Full Throttle

The 309MW Rentel wind farm in the Belgian North Sea has become Belgium’s fifth fully operational offshore wind farm. Rentel has now joined the ranks of C-Power, Belwind, Northwind, and Nobelwind. The combined capacity of the five wind farms is 1,186MW provided by 274 wind turbines. With the addition

about 7 years ago
  • 1
  • …
  • 352
  • 353
  • 354
  • …
  • 645