ScottishPower Renewables is planning to combine the East Anglia One North, East Anglia Two and East Anglia Three offshore wind projects into one single delivery program known as the East Anglia Hub. The three projects will produce 3.1GW of renewable energy and will be procured together to leverage t
Parkwind, MHI Vestas and Heerema Marine Contractors (HMC) will utilize a new floating turbine installation method on the Arcadis Ost 1 offshore wind farm, an industry’s first. The revolutionary construction methodology is based on using a floating installation vessel to assemble the turbine componen
MHI Vestas has confirmed that its V174-9.5 MW was selected as the preferred turbine for the 220MW Hibikinada offshore wind farm in Japan. Hibikinada is the first awarded, commercial-scale project to be announced in Japan. The wind farm is expected to enter the construction phase in FY 2022. It will
The UK Planning Inspectorate has accepted applications for orders granting development consent submitted by ScottishPower Renewables for the East Anglia ONE North and the East Anglia TWO offshore wind farms. The UK Secretary of State has decided to accept these applications for examination. Scottish
The China Three Gorges (CTG) Corporation has commissioned the 300MW Jiangsu Dafeng Three Gorges offshore wind farm in China. According to CTG, the 300MW offshore wind farm was commissioned last week when its final 6.45MW Goldwind turbine started spinning. The Jiangsu Dafeng Three Gorges project comp
Site investigations have commenced on the Star of the South offshore wind project in Australia. Two floating LiDARs and a wave buoy were deployed this week to collect data on the wind profile and conditions in the Bass Strait for what is to be Australia’s first offshore wind farm. The wind and wave
Spain’s Tecade has won a contract to manufacture 20 transition pieces (TPs) for the 950MW Moray East offshore wind project in Scotland. The EUR 12.7 million contract has been secured through Navantia and through Nervión Industries, the company said. Work on the units has already started at Tecade’s
Bureau Veritas has issued Ørsted a Project Certificate for the 450MW Borkum Riffgrund 2 offshore wind farm. Located in Germany’s North Sea, 56 kilometres off the coast of Lower Saxony, Borkum Riffgrund 2 consists of 56 MHI Vestas V164-8.3MW turbines with two different types of foundations – monopile
Equinor and SSE Renewables have signed an agreement with NKT for an Engineering, Procurement, Construction and Installation (EPCI) contract for high-voltage DC on- and offshore export cable systems to be installed on the Dogger Bank Wind Farms Creyke Beck A/B. With a combined capacity of 2,400MW, th
EEW Special Pipe Construction has completed steel construction on all of the monopiles for Vattenfall’s Kriegers Flak offshore wind farm at its plant in Rostock, Germany. 72 monopiles are now structurally ready and the next step is to coat the units, some of which are up to 65.6 metres long. This wo
Eoliennes Flottantes du Golfe du Lion (EFGL) has selected V164-10.0 MW turbines from MHI Vestas Offshore Wind for its 30MW floating wind pilot project in the French Mediterranean. Once installed in 2022, EFGL will feature the world’s most powerful wind turbines in commercial operation, MHI Vestas sa
Nearshore geotechnical surveys along the Neart na Gaoithe export cable corridor route are due to start off the Fife coast in Scotland later this month. The survey work is being carried out by Fugro using a ‘walking’ jack-up barge, Wavewalker 1. The survey is planned to start no earlier than 25 Novem
Jan De Nul’s jack-up vessel Vole au vent has completed the installation of all monopile foundations at the Northwester 2 offshore wind project, a spokesperson from Parkwind told Offshore WIND. According to Parkwind, Vole au vent completed the installation of all 23 monopiles on 13 November and is cu
DEME’s cable laying vessel Living Stone has departed Greece carrying the export cables for the 487MW SeaMade offshore wind farm in the Belgian North Sea. Living Stone loaded the export cables with a combined length of around 28 kilometres at Hellenic Cables’ facility in Soussaki. The vessel is curre