Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farm Update

Loading filters...
FeaturedHeadlinesFixed-BottomFoundationsProject UpdatesSupply ChainGrid ConnectionAuthoritiesPlanning & PermittingOffshore PlatformsWind TurbinesBusiness & FinanceContracts & TendersEquipmentVessels
First Hornsea 3 Monopiles Arrive in UK from Spain
Wind Farm Update

First Hornsea 3 Monopiles Arrive in UK from Spain

The first monopile foundations for Hornsea 3 offshore wind farm have arrived at Port of Teesworks in the UK from Bilbao, Spain, where Haizea Wind Group is producing the monopiles for Ørsted’s 2.9 GW project. Six XXL monopiles, of the total 197 that Hornsea 3 will comprise, arrived in two batches, wi

about 8 months ago
German Offshore Wind Farms Fed 26.1 TWh of Electricity Into Grid in 2025
Wind Farm Update

German Offshore Wind Farms Fed 26.1 TWh of Electricity Into Grid in 2025

Germany’s total offshore wind power generation in 2025 amounted to 26.1 TWh, of which 20.8 TWh came from the North Sea and 5.38 TWh from the Baltic Sea, according to TenneT Germany, the transmission system operator (TSO) in charge of the country’s North Sea grid. In this article: With onshore wind f

about 8 months ago
Corio, TotalEnergies Get Development Consent for 1.5 GW UK Offshore Wind Farm
Wind Farm Update

Corio, TotalEnergies Get Development Consent for 1.5 GW UK Offshore Wind Farm

about 8 months ago
Nordseecluster A Substation Topsides Ready for Offshore Installation
Wind Farm Update

Nordseecluster A Substation Topsides Ready for Offshore Installation

Chantiers de l’Atlantique has completed the construction and integration of two offshore electrical substations for the 660 MW Nordseecluster A offshore wind farm, currently under construction off the German coast. Each of the topsides is approximately 40 metres long and 22 metres high, with one wei

about 8 months ago
Stowen Nets Job at Greater Gabbard
Wind Farm Update

Partrac to Deploy Metocean Equipment at North Falls Offshore Wind Farm Area

A metocean survey campaign is set to commence this month at the North Falls offshore wind farm site in the southern North Sea, approximately 40 kilometres off the East Anglian coast. The campaign will be carried out by Partrac, which will use the vessel CT Vector to deploy the metocean equipment at

about 8 months ago
Fugro to Start Geophysical Surveys at 2 GW Scottish Offshore Wind Farm Site
Wind Farm Update

Fugro to Start Geophysical Surveys at 2 GW Scottish Offshore Wind Farm Site

Fugro is scheduled to soon start conducting geophysical surveys at a site in the Outer Moray Firth, Scotland, where Ocean Winds plans to build its 2 GW Caledonia offshore wind farm. The work, to be carried out within the wind turbine array site, will be conducted by the vessels Fugro Pioneer and Kom

about 8 months ago
CWHI Completes Delivery of Inch Cape Transition Pieces
Wind Farm Update

CWHI Completes Delivery of Inch Cape Transition Pieces

CNOOD-Wenchong Heavy Industries (CWHI) has delivered all transition pieces (TP) the Chinese company was contracted to manufacture for the Scottish Inch Cape offshore wind farm. CWHI said on 10 February that it completed the load-out and on-time departure of the final batch of TPs for Inch Cape from

about 8 months ago
Ørsted, JERA Nex BP Submit Environmental Applications for Offshore Wind Projects in Australia
Wind Farm Update

Ørsted, JERA Nex BP Submit Environmental Applications for Offshore Wind Projects in Australia

Ørsted and JERA Nex BP have applied for federal environmental approval under Australia’s Environment Protection and Biodiversity Conservation (EPBC) Act for their Gippsland 1 and Blue Mackerel offshore wind projects, respectively. According to information on the Department of Climate Change, Energy,

about 8 months ago
China Three Gorges Grid-Connects ‘World’s First’ 20 MW Wind Turbine Installed Offshore
Wind Farm Update

China Three Gorges Grid-Connects ‘World’s First’ 20 MW Wind Turbine Installed Offshore

China Three Gorges (CTG) has commissioned the 20 MW wind turbine recently installed offshore, the first turbine of this generation capacity to be installed at sea, according to the Chinese company. The wind turbine was connected to the grid and started operation on 5 February. The 20 MW model, which

about 8 months ago
He Dreiht first power
Wind Farm Update

Google Enters Offshore Wind Power Purchase Agreement in Germany

Google has entered into a 15-year Power Purchase Agreement (PPA) with EnBW for electricity produced by 100 MW of capacity at the 960 MW He Dreiht offshore wind farm in Germany. The He Dreiht offshore wind farm is currently under construction about 85 kilometres northwest of the German island of Bork

about 8 months ago
Lidl Buys Offshore Wind Power from RWE in UK
Wind Farm Update

Lidl Buys Offshore Wind Power from RWE in UK

RWE has signed a five-year Power Purchase Agreement (PPA) with the discount supermarket Lidl GB. The agreement, which has already begun, covers an annual electricity supply of 100 GWh from RWE’s Gwynt y Môr offshore wind farm in the Irish Sea. Gwynt y Môr comprises 160 Siemens 3.6 MW wind turbines f

about 8 months ago
CDWE to Use CAPE Holland’s Vibro Lifting Tool at Fengmiao 1 Offshore Wind Farm
Wind Farm Update

CDWE to Use CAPE Holland’s Vibro Lifting Tool at Fengmiao 1 Offshore Wind Farm

CAPE Holland, a Venterra Group company, has secured a contract with CSBC-DEME Wind Engineering (CDWE) to supply its CAPE VLT-640 Tandem Vibro Lifting Tool for the installation of pin piles for the offshore wind turbine and substation jacket foundations at the Fengmiao 1 project site in Taiwan. CDWE,

about 8 months ago
Amazon Signs Power Purchase Agreement for Nordseecluster B Offshore Wind Farm
Wind Farm Update

Amazon Signs Power Purchase Agreement for Nordseecluster B Offshore Wind Farm

Amazon has signed a Power Purchase Agreement (PPA) for 110 MW from Nordseecluster B offshore wind farm, the second phase of the Nordseecluster project in Germany, owned by RWE and Norges Bank Investment Management. The PPAbuilds on the Strategic Framework Agreement that RWE and Amazon signed in June

about 8 months ago
Geotechnical Surveys Underway at TotalEnergies’ 2 GW Offshore Wind Site in Germany
Wind Farm Update

Geotechnical Surveys Underway at TotalEnergies’ 2 GW Offshore Wind Site in Germany

TotalEnergies has contracted Fugro to perform geotechnical surveys for the NordSee Energies 1 (NSE1) offshore wind farm at the N-12.1 site in Germany, where survey work is already underway. Investigations will be carried out at around 140 locations, reaching depths of up to 50 metres below the seabe

about 8 months ago
  • 1
  • …
  • 21
  • 22
  • 23
  • …
  • 648