The Port of Rotterdam Authority and PUMA, a joint venture between Royal Boskalis Westminster NV and Van Oord NV, signed a contract for the construction of the the Rotterdam Offshore Center Maasvlakte 2.
Works on the export cables which will bring ashore the energy generated by the 400MW Rampion offshore wind farm are scheduled to gather pace in the next couple of weeks, according to a notice to mariners.
A 1:200 scale model of the SOUL wind turbine installation vessel (WTIV), a joint development of SeaOwls and Ulstein Design & Solutions, is currently being tested at the PEUTZ test facility in the Netherlands.
Offshore Turbine Services (OTS) are, in conjunction with Seazip Offshore Service BV, providing a crew transfer vessel (CTV) – Lieutenant P – for the construction of the 42MW Tahkoluoto offshore wind farm in Finland.
Rhenus Logistics has officially opened its new quay and has added a new harbour mobile crane at the Deep Sea Terminal on the Maasvlakte in the Port of Rotterdam.
Fred. Olsen Windcarrier has shared a photo of the jack-up Brave Tern installing the 35th Adwen 5MW wind turbine on Iberdrola’s Wikinger offshore wind farm to mark a halfway milestone on the project in the German part of the Baltic Sea.
United Wind Logistics’ new special purpose vessel Vestvind arrived at the Port of Esbjerg today, 7 July, the port reported via social media.
A2SEA’s jack-up Sea Installer has, together with DONG Energy and Siemens Wind Power, installed 23 out of 91 Siemens 6MW turbines on the 576MW Race Bank offshore wind farm off North Norfolk, UK.
GeoSea is set to acquire the full ownership of A2SEA, owned by DONG Energy and Siemens, after the three companies signed an agreement today, 7 July.
Holland-based Barge Master and Bosch Rexroth have jointly introduced a new motion compensated gangway to the offshore wind market.
Leask Marine’s vessel C-Fenna supported DeepOcean’s Maersk Connector during recent work on DONG Energy’s Walney Extension offshore wind project.
Gulliver, Scaldis Salvage & Marine Contractors’ heavy lift, DP2 vessel, has left the ROC shipyard in Qidong, China, Royal IHC reports. The vessel is now en route to the Huisman yard in Xiamen for the installation of two cranes, each capable of carrying 2,000 tonnes. Scaldis ordered Gulliver, formerl
Colchester-based offshore services provider CWind has recently carried out urgent inspection and repair projects on the 573MW Race Bank offshore wind farm currently under construction off Norfolk, UK.
Fugro has laid the final inter-array cable at the 400MW Rampion offshore wind farm off Sussex, UK.