Edda Passat, the first Service Operation Vessel (SOV) built in Spain, commenced sea trials earlier this month, after which the vessel will head to Ørsted’s Race Bank offshore wind farm in the UK.
Leask Marine’s vessel C-Fenna has completed the recovery of ten seabed frames and buoys at Ørsted’s Borssele 1 and 2 offshore wind farm in the Netherlands on behalf of Fugro.
GustoMSC has commissioned the jacking system for GeoSea’s multi-purpose self-propelled jack-up vessel Apollo at the Uljanik Shipyard in Croatia.
The Seafox 5 jack-up has arrived in Eemshaven to load the first set of wind turbine components for the 396MW Merkur offshore wind farm project in the German North Sea.
Service operations vessel (SOV) Vestland Cygnus has arrived at DHSS’ new supply base in the Port of Eemshaven, the Netherlands, where it will mobilize for the Merkur offshore wind farm.
DEME Group’s advanced cable lay vessel Living Stone caught fire while under construction in a shipyard in Santurtzi, Spain.
Jan De Nul’s jack-up vessel Vole au vent has left a shipyard in Poland where the vessel underwent certain modifications to the layout of the deck and is now ready for the Borkum Riffgrund 2 offshore wind farm project.
Today, 14 February, Siemens’s Rotra Mare roll on/roll off (Ro-Ro) vessel brought the first Siemens Gamesa 7MW wind turbine components for the Rentel offshore wind farm to the REBO site in Ostend. Two blade sets and six top towers have been shipped from Esbjerg.
RollDock and SAL Heavy Lift will establish the world’s first pool for dock vessels on 1 April to jointly handle Roll-On / Roll-Off and Float-In / Float-Out heavy lift cargoes with six geared dock vessels, all being operated under the RollDock brand. Five of the vessels come from RollDock’s fleet and
Offshore WIND has chosen a photograph of Eidesvik’s vessel Viking Neptune working at the Wikinger site on 21 January as our latest photo of the day.
Ulstein has installed the SMST equipment on Acta Marine’s new walk-to-work vessel Acta Auriga at Ulstein Verft in Norway.
The 151-metre, self-propelled, DP2, jack-up rig Seafox 5 has left the Damen Verolme Rotterdam (DVR) shipyard following a four-month refit.
Tidal Transit’s crew transfer vessels (CTVs) Ginny Louise and Eden Rose started supporting operation and maintenance works at the Westermost Rough offshore wind farm on 27 January, after the UK-based CTV provider signed a charter contract with Ørsted. The two vessels, from Ørsted’s O&M Base in Grims
C-bed Floating Hotels has sold the oldest floatel in its fleet, the Wind Solution, to an undisclosed buyer.