
MJR Power and Automation, together with Blackfish Engineering and Tidal Transit, have completed the harbour trials of the company’s platform-mounted automated offshore power and charging system. The harbor trials were carried out at the Port of Blyth in the UK using the Crew Transfer Vessel (CTV) Ti

RWE has launched its second annual Innovation Competition, looking for solutions in the domains of ecology, system integration, and circularity in offshore wind. The energy company and one of the leading offshore wind developers has invited start-ups, scale-ups, research institutes, as well as other

GE could soon join the list of wind turbine manufacturers who have surpassed the current 15 MW “threshold” by producing and/or announcing more powerful models. According to information recently shared with investors, the US-headquartered company is likely to climb up the offshore wind turbine output

Gulf Wind Technology (GWT) has partnered with Shell to establish a research, training, and technology demonstration programme in an effort to advance offshore wind development in the Gulf of Mexico. GWT, supported by a USD 10 million investment from Shell, will create 30 new direct jobs and the Loui

Marshall Futureworx, the venture building and advanced technologies arm of Marshall of Cambridge, has unveiled plans to provide offshore wind farm inspection services using a resident robotic ecosystem. Lilypad is an ecosystem of multiple autonomous BVLOS (Beyond Visual Line of Sight) UAVs (Unmanned

LM Wind Power and GE Renewable Energy are joining twelve partners in the Blades2Build (B2B) project to develop new recycling solutions for manufacturing waste as well as end-of-life blades. By 2030, the European onshore and offshore wind energy market is expected to increase by approximately 40 per

RWE has selected Siemens Gamesa’s RecyclableBlade for 44 SG 14-222 DD offshore wind turbines to be installed at the Sofia offshore wind power project off the east coast of the UK. In total, 132 individual recyclable blades will be installed at the 100-turbine offshore wind project. This is the maxim

South Korean SK ecoplant and its compatriot POSCO have announced that their K-Floater, a floating body model for offshore wind power developed with domestic technology, secured basic design certification from DNV. The K-floating body is a 10 MW semi-submersible floating model which is capable of wit

X1 Wind has announced that its floating offshore wind turbine prototype delivered first power to PLOCAN’s smart grid in the Canary Islands, Spain. First Power was fed from the prototype, installed at a 50-metre water depth in a downwind configuration, into PLOCAN’s offshore platform smart grid via a

Vestas has completed the sale of its converters and controls business, marking the transfer of the company’s three converters and controls factories to KK Wind Solutions (KK). Following the acquisition, KK becomes a world leader within converter and controls for the wind industry, adding 600 employe

A consortium of Dutch companies has launched a government-backed project to explore the synergies between offshore wind, offshore solar and hydrogen production at sea for improved sustainability of North Sea renewable energy projects. The four-year project, dubbed Solar Enhanced North Sea Energy Hub

Danish wind farm installation vessel owner and operator Cadeler A/S has invested in Høglund Ship Performance Monitor (SPM) which could reduce fuel consumption and improve the environmental footprint of their two offshore wind vessels, Wind Osprey and Wind Orca. “The Høglund SPM system will give us d

Odfjell Oceanwind has launched the Deepsea Star™ harsh environment floating wind foundation designed to support wind turbines with a capacity of 15 MW and more. The Deepsea Star™ is a column-stabilised, semi-submersible steel design with centre wind turbine tower, designed to take the weights and lo

Germany’s Federal Network Agency has launched another offshore wind tender, this one for 1,800 MW of capacity to be developed across four centrally pre-examined areas in the North Sea. This is in addition to the tender for 7 GW of capacity in areas that had not been centrally pre-examined launched a