Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Technology

Loading filters...
Operations & MaintenanceBusiness & FinanceVesselsR&DTraining & EducationAuthoritiesEnvironmentGrid ConnectionWind Farm Update
JDR Invests in World’s 2nd Largest Horizontal Lay-Up Machine
Technology

JDR Invests in World’s 2nd Largest Horizontal Lay-Up Machine

JDR has unveiled its new horizontal lay-up machine (HLM), the biggest in the UK and the second largest in the world, which is part of JDR’s ongoing Hartlepool expansion to better service its growing oil, gas and renewables industry, the company said. The new HLM will provide increased manufacturing

about 10 years ago
Siemens to Upgrade DONG Energy’s OWF Systems
Technology

Siemens to Upgrade DONG Energy’s OWF Systems

DONG Energy has awarded Siemens with a contract to upgrade the existing central Infrastructure Control System (ICS) on DONG Energy’s offshore wind farms. The contract covers hardware and services necessary for upgrading the existing central ICS. This includes upgrading hardware and configurations (s

about 10 years ago
WindEurope CEO: The Future of Oil and Gas Sectors Is in Offshore Wind
Technology

WindEurope CEO: The Future of Oil and Gas Sectors Is in Offshore Wind

Companies across the oil and gas value chain stand to benefit significantly from the further development of offshore wind industry, WindEurope CEO Giles Dickson said in his speech at the annual Offshore Northern Seas (ONS) event in Stavanger, Norway. In his speech, Dickson described how some oil and

about 10 years ago
ALL NRG Stands United
Technology

ALL NRG Stands United

Denmark’s ALL NRG has merged all of its units and is heading into the future as a united service provider for onshore and offshore energy industries. “ALL NRG enters the market as one of the largest service partners to the energy industry onshore and offshore – and combines more than 85 years of exp

about 10 years ago
Offshore Project Support All-Rounder Formed in Den Helder
Technology

Offshore Project Support All-Rounder Formed in Den Helder

Den Helder Support Service (DHSS), Den Helder Aircraft Systems (DHAS), Glomar Offshore and GEOxyz have formed a joint venture – Offshore Project Support (OPS) – to provide a complete package of specialized services above and below water in the offshore energy industry. The joint venture, called OPS,

about 10 years ago
Adwen and Winergy Unveil World’s Largest Wind Turbine Gearbox
Technology

Adwen and Winergy Unveil World’s Largest Wind Turbine Gearbox

Adwen and Winergy have presented the jointly developed gearbox for Adwen’s AD 8-180 offshore wind turbine which, with an input torque of close to 10,000 kilonewton-meters (kNm) and a weight of 86 tonnes, is the largest wind turbine gearbox ever built in the world. Winergy’s gearbox was designed excl

about 10 years ago
Highlights of the Month: August 2016
Technology

Highlights of the Month: August 2016

USA Just Got Its First Offshore Wind Farm “The Block Island Wind Farm is now fully constructed,” Jeff Grybowski, Deepwater Wind’s CEO, informed via social media on 18 August. Bilfinger Exits Offshore Wind Foundations Business Germany’s VTC Group Munich has bought Bilfinger’s share in Bilfinger Mars

about 10 years ago
Red Tape Pushes Gicon SOF Installation to 2017
Technology

Red Tape Pushes Gicon SOF Installation to 2017

German engineering consultancy Gicon will postpone the installation of the full scale demonstrator of its floating offshore foundation, the Gicon SOF, in the Baltic Sea to 2017 due to ”procedural challenges”. The Gicon SOF is a tension leg platform developed by Gicon and ESG GmbH in co-operation wit

about 10 years ago
Vattenfall to Plan OWF Marine Operations with Mermaid
Technology

Vattenfall to Plan OWF Marine Operations with Mermaid

Vattenfall has ordered a full Mermaid system license for the strategic planning of its offshore wind farm operations from James Fisher Marine Services, part of James Fisher and Sons plc. Mermaid provides increased understanding of the impact of weather and tidal forces on a project’s schedule to com

about 10 years ago
Report: Gamesa and Siemens Turn Down GE’s Bid for Adwen
Technology

Report: Gamesa and Siemens Turn Down GE’s Bid for Adwen

Gamesa and Siemens have rejected GE’s first bid to buy offshore wind turbine manufacturer Adwen, Reuters cited sources familiar with the matter as saying. However, GE still has an option to improve its bid before the deadline, a source told Reuters. Adwen is a 50-50 joint venture established in Marc

about 10 years ago
ECN Expands Offshore Measurement Locations, Teams Up with KNMI
Technology

ECN Expands Offshore Measurement Locations, Teams Up with KNMI

Energy research Centre of the Netherlands (ECN) is expanding the number of offshore measuring locations and is entering a partnership with the Royal Netherlands Meteorological Institute (KNMI). ECN, KNMI, Rijkswaterstaat and several other parties have various measurement masts and measurement system

about 10 years ago
Ardmore Craig Ropes In Offshore Wind Contracts
Technology

Ardmore Craig Ropes In Offshore Wind Contracts

UK-based engineering company Ardmore Craig has been awarded numerous contracts for detail design and seafastening work associated with summer campaigns in the offshore wind sector over the past few months. Projects include vessels destined for Burbo Bank, Bligh Bank, Race Bank, Rampion, Wikinger and

about 10 years ago
Adwen Preparing Bremerhaven Site for 8MW Prototype
Technology

Adwen Preparing Bremerhaven Site for 8MW Prototype

Offshore wind turbine maker Adwen has begun the civil works on the site in Bremerhaven where the first prototype of its AD 8-180 wind turbine will be installed. The main components of the wind turbine will arrive gradually until the installation starts in the fourth quarter of the year. The turbine’

about 10 years ago
Gemini Chopper Ready for Work
Technology

Gemini Chopper Ready for Work

Emden-based HeliService International has taken delivery of its first Leonardo AW169 helicopter which will be used to support Siemens’ personnel during maintenance operations on the 600MW Gemini wind farm off the coast of the Netherlands. The aircraft is on a 5-year contract for winching maintenance

about 10 years ago
  • 1
  • …
  • 168
  • 169
  • 170
  • …
  • 351