Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Manufacturing

Loading filters...
AuthoritiesBusiness developmentFloating WindFoundationsSupply ChainFixed-BottomProject UpdatesWind Farm UpdateCablesGrid ConnectionBusiness & FinanceWind TurbinesContracts & TendersTechnologyResearch & DevelopmentEquipmentGreen HydrogenIndustryVessels
US Selects Five Floating Wind Technologies Enabling Mass Production and Deployment in Second FLOWIN Phase
Manufacturing

US Selects Five Floating Wind Technologies Enabling Mass Production and Deployment in Second FLOWIN Phase

Principle Power’s WindFloat, PelaStar, Technip Energies’ INO15, Stiesdal’s Tetra Triple-One, and Esteyco’s WHEEL floating wind platforms are the winners of the second phase of the FLoating Offshore Wind ReadINess (FLOWIN) Prize in the United States, set up to support technologies that can facilitate

about 2 years ago
Navantia Ocean Winds jacket foundation
Manufacturing

Iles d’Yeu et de Noirmoutier Offshore Substation Foundation Ready for Sail-Out

Navantia Seanergies has completed the construction of the substation jacket foundation for the Iles d’Yeu et de Noirmoutier offshore wind farm in France. The unit has been loaded onto a barge at the Puerto Real shipyard in Cádiz, Spain, and is ready for transport. The jacket foundation for the offsh

about 2 years ago
A photo of the vertical lay-up machine close up
Manufacturing

Vertical Lay-Up Machine Commissioned at TKF’s New Cable Factory

The new cable factory Twentsche Kabelfabriek (TKF) built in Eemshaven is preparing for full operation as the company completed a type test run in March, producing a three power core-type test cable, and with the vertical lay-up machine (VLM) delivered by PASSER now commissioned and undergoing final

about 2 years ago
Siemens Gamesa Commissions Motion Comfort Monitoring Tool
Manufacturing

Siemens Gamesa Restructuring, Offshore Business Area Goal to Ramp Up Production Capacity

Siemens Gamesa has initiated comprehensive measures for the operational restructuring of the company with the aim of achieving break-even by 2026 and then returning to profitable growth. As part of the long-term strategic development plan, the company will streamline its onshore business and focus o

about 2 years ago
A photo of CS Wind's first tower for Jeonnam I offshore wind farm with CIP, COP and CS Wind team in front
Manufacturing

CS Wind Vietnam Rolls Out First Towers for South Korean Offshore Wind Farm

CS Wind’s yard in Ba Ria Vung Tau, Vietnam, has produced the first wind turbine tower for an offshore wind farm that Copenhagen Infrastructure Partners (CIP) and SK E&S are building in South Korea. According to a social media post by Stuart Livesey, CEO of Copenhagen Offshore Partners (COP) Vietnam,

about 2 years ago
Dajin Ships First Batch of Wind Turbine Towers for Moray West
Manufacturing

Dajin Ships First Batch of Wind Turbine Towers for Moray West

Dajin Heavy Industry has sent off the first batch of three wind turbine towers for the Moray West offshore wind farm, the company said on 3 April via social media. According to Dajin Heavy Industry, the company is the first Chinese supplier to deliver towers for 14 MW offshore wind turbines to the E

about 2 years ago
Swancor to Supply Recyclable Resins for Siemens Gamesa’s RecyclableBlades
Manufacturing

Swancor to Supply Recyclable Resins for Siemens Gamesa’s RecyclableBlades

Taiwan-headquartered Swancor has signed a Letter of Intent with Siemens Gamesa to supply recyclable resins for the company’s recyclable wind turbine blades. Starting in 2026, all the resin supplied from Swancor to Siemens Gamesa will be recyclable, as per an update shared on social media by the Germ

about 2 years ago
WATCH: First Production Line at ‘World’s Largest Monopile Factory’ to Go Live in July
Manufacturing

WATCH: First Production Line at ‘World’s Largest Monopile Factory’ to Go Live in July

The first production line at the new manufacturing halls Sif is building at its Maasvlakte 2 site in Rotterdam is scheduled to go into operation in July 2024, according to the Dutch manufacturer, which is building the new halls as an extension to its existing facilities. Sif made the final investme

about 2 years ago
Orsted Dillinger
Manufacturing

Ørsted Secures Exclusive Access to Lower-Emission Steel from Dillinger

Ørsted will be offered the first production of lower-emission steel from German-based Dillinger, subject to availability and commercial terms and conditions. The steel plates are intended to be used for offshore wind monopile foundations in future projects. Under a large-scale supply agreement enter

about 2 years ago
PASSER Eyeing Floating Wind
Manufacturing

PASSER Eyeing Floating Wind

The work on the vertical lay-up machine (VLM) for JDR’s new cable factory in the UK is now well underway in Klaipeda, Lithuania, where Norway-headquartered PASSER Group recently opened a new fabrication facility. The Group has revealed that, besides expanding its production capacity, it is also look

about 2 years ago
Siemens Gamesa’s Cuxhaven Factory Produces First 14 MW Offshore Wind Turbine Nacelles
Manufacturing

Siemens Gamesa’s Cuxhaven Factory Produces First 14 MW Offshore Wind Turbine Nacelles

Siemens Gamesa has rolled out the first 14 MW wind turbine nacelles at its Cuxhaven plant in Germany as the production of wind turbine components for the Moray West offshore wind farm is currently underway. The first batch of nacelles is now awaiting shipment and installation at the Moray West proje

about 2 years ago
Offshore Wind Accounts for 45 Pct of NKT’s High-Voltage Order Backlog
Manufacturing

Offshore Wind Accounts for 45 Pct of NKT’s High-Voltage Order Backlog

Subsea power cable manufacturer NKT has reported a record-high order backlog for high-voltage cables for 2023, with 45 per cent of orders coming from offshore wind. At the end of last year, NKT’s order backlog was at EUR 10.8 billion, more than double the company saw at the end of 2022. In its full-

about 2 years ago
Sif Group Skybox. Photo, Navingo.
Manufacturing

Equinor, Polenergia Finalise 100-Monopile Order with Sif

Netherlands-headquartered Sif Group has signed the final contracts with Polenergia and Equinor for the supply of 100 monopiles for the Bałtyk II and Bałtyk III offshore wind farms in the Polish Baltic Sea. Manufacturing of the monopiles is scheduled for the second quarter of 2025 with completion in

about 2 years ago
Outer Dowsing Corio Generation offshore wind
Manufacturing

US Company Plans to Produce ‘100% Made in USA’ Offshore Wind Turbine Towers from 2026

US company US Forged Rings has revealed plans for an offshore wind turbine tower fabrication facility that would be operational in 2026 and a steel forging plant that would go into operation the following year. The company, which will invest USD 700 million into the two new facilities on the US East

about 2 years ago
  • 1
  • …
  • 11
  • 12
  • 13
  • 14
  • 15