offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

R&D

Loading filters...
Business & FinanceContracts & TendersTechnologyOperations & MaintenancePorts & LogisticsWind Farm UpdateEnvironmentGrid ConnectionAuthorities
Senvion Gathers 10MW+ Offshore Wind Turbine Team
R&D

Senvion Gathers 10MW+ Offshore Wind Turbine Team

German wind turbine manufacturer Senvion has partnered with EnBW and R&D institutes such as DTU, ECN and Fraunhofer IWES to jointly develop a 10MW+ offshore wind turbine.

about 8 years ago
Hutchinson Engineering Secures Hohe See Contract
R&D

Hutchinson Engineering Secures Hohe See Contract

Hutchinson Engineering Ltd (HEL) has secured a contract to provide anode cage assemblies for EnBW’s Hohe See offshore wind farm in the German North Sea.

about 8 years ago
New York Offshore Wind Alliance Boosts Its Membership
R&D

New York Offshore Wind Alliance Boosts Its Membership

New York State Building & Construction Trades Council has joined the New York Offshore Wind Alliance (NYOWA) in support of the effort to make New York the national leader in offshore wind.

about 8 years ago
Sif Goes Full Steam Ahead with Norther Foundations
R&D

Sif Goes Full Steam Ahead with Norther Foundations

Sif has started the production of monopile foundations and has produced half of the primary steel for the transition pieces (TPs) to be installed on the 370MW Norther offshore wind farm located in the Belgian North Sea.

about 8 years ago
Vattenfall to Seek Thanet Extension PEIR Feedback
R&D

Vattenfall to Seek Thanet Extension PEIR Feedback

Vattenfall will kick off the statutory consultation process on the Thanet Extension offshore wind farm project to get feedback on the Preliminary Environmental Information Report (PEIR).

about 8 years ago
France to Put Offshore and Floating Wind On Fast Track in 2018
R&D

France to Put Offshore and Floating Wind On Fast Track in 2018

France will launch preliminary studies on the development of floating wind farms off Brittany and in the Mediterranean, as well as preliminary technical studies and a public debate on the proposed wind farm off Oléron in 2018, French Prime Minister Edouard Philippe said.

about 8 years ago
DNV GL Sees Diving, Sailing and Crawling Robots in Offshore Wind’s Future
R&D

DNV GL Sees Diving, Sailing and Crawling Robots in Offshore Wind’s Future

DNV GL has published a position paper on artificial intelligence (AI) in solar and wind energy industries, saying AI will increasingly automate operations over the next several years and boost efficiencies across the renewable energy sector.

about 8 years ago
Nexans Opens High Voltage Test Lab in Calais
R&D

Nexans Opens High Voltage Test Lab in Calais

Nexans has opened a new high voltage test laboratory at its Calais Center of Excellence in France, making it fully operational with the capacity to test cable systems up to 1.5 million volts.

about 8 years ago
ATAM Tests Robotic Crawler for Blade Inspection at ORE Catapult
R&D

ATAM Tests Robotic Crawler for Blade Inspection at ORE Catapult

Great Yarmouth-based ATAM Group has tested its robotic crawler, developed for the inspection of wind turbine blades, on the full-size turbine training tower and along test blades at ORE Catapult’s facilities in Northumberland, which is offered as part of a GBP 50,000 grant awarded to ATAM from the G

about 8 years ago
Blue Hammer Nails Lloyd’s Register Noise Test
R&D

Blue Hammer Nails Lloyd’s Register Noise Test

Lloyd’s Register (LR) has assessed Fistuca’s BLUE Hammer technology showing that it has the potential to produce “far less” underwater noise during the installation of offshore wind foundations compared to hydraulic hammers.

about 8 years ago
Deutsche WindGuard Sets Up LiDAR Calibration Tunnel for PTB
R&D

Deutsche WindGuard Sets Up LiDAR Calibration Tunnel for PTB

Deutsche WindGuard Wind Tunnel Services has developed a special wind tunnel for LiDAR Calibration on behalf of the National Metrology Institute of Germany (Physikalisch-Technische Bundesanstalt – PTB).

about 8 years ago
Ørsted Tweaks Hornsea Three Cable Route
R&D

Ørsted Tweaks Hornsea Three Cable Route

Ørsted has invited comments on the proposed modifications to the onshore and offshore export cable corridor for the Hornsea Project Three wind farm located some 120 kilometres off the north Norfolk coast, UK.

about 8 years ago
Mussel Farming Begins at Belwind OWF
R&D

Mussel Farming Begins at Belwind OWF

On 15 November, a bio mussel force line was installed at the Belwind offshore wind farm as part of a research project investigating mussel farming at offshore wind farms.

about 8 years ago
VBMS and Kintech Energy Introduce Resin-Free Hang-Offs
R&D

VBMS and Kintech Energy Introduce Resin-Free Hang-Offs

VBMS and Kintech Energy Ltd. have jointly developed a resin-free hang-off solution for fixing and sealing subsea cables in offshore structures which could potentially be used on the Horns Rev 3 wind farm off Denmark.

about 8 years ago
  • 1
  • …
  • 112
  • 113
  • 114
  • …
  • 354