offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Project Updates

Loading filters...
Business & FinanceWind Farm UpdateFixed-BottomCablesGrid ConnectionManufacturingSupply ChainOffshore PlatformsOperations & MaintenanceFoundationsFloating WindPlanning & PermittingAuthoritiesContracts & Tenders
An aerial photo of Formosa 2 Offshore Wind Farm in Taiwan
Project Updates

Macquarie to Sell Stake in 376 MW Formosa 2 Offshore Wind Farm in Taiwan

Pine Wind Power Co., Ltd (Pine Wind) has agreed to purchase a 26 per cent equity and debt stake in the 376 MW Formosa 2 offshore wind farm in Taiwan from Macquarie Asset Management. The proposed investment will be acquired through J&V Energy’s wholly owned subsidiary, Pine Wind, and will be supporte

about 1 year ago
Inc Cape financial close
Project Updates

1.1 GW Inch Cape Wind Farm Entering Offshore Construction Phase

ESB and Red Rock Renewables have reached a financial close on the 1,080 MW Inch Cape offshore wind farm in Scotland, and the project will now progress into its offshore construction phase. The Scottish offshore wind project has reached a financial close, securing a GBP 3.5 billion financing package

about 1 year ago
An image rendering Brayton Point subsea cable plant
Project Updates

Prysmian Drops Plan to Build USD 200 Million Offshore Wind Cable Factory in Massachusetts

Prysmian has informed local authorities in Somerset, Massachusetts, about the company’s decision not to move forward with the factory for offshore wind power cables that was planned to be built at Brayton Point on a site that previously housed a coal-fired power plant which was shut down in 2017. Ac

about 1 year ago
GPB Completes Two Substation Topsides for 1.2 GW Baltic Power Offshore Wind Farm
Project Updates

GPB Completes Two Substation Topsides for 1.2 GW Baltic Power Offshore Wind Farm

Grupa Przemysłowa Baltic Sp. z o.o. (GPB) has completed the construction of two offshore substation topsides for the 1.2 GW Baltic Power offshore wind farm in Poland’s Baltic Sea. Under a contract signed in 2023, GPB manufactured the two offshore substation topsides that will be installed at the Bal

about 1 year ago
RWE to Start Building New Offshore Wind Farm Control Centre in Germany
Project Updates

RWE to Start Building New Offshore Wind Farm Control Centre in Germany

RWE is preparing to start construction of a new building in Jemgum, in Germany’s East Friesland region, which will serve as a base for round-the-clock monitoring and control of RWE’s existing and future offshore wind farms in both Germany and continental Europe. The developer, who will take a long-t

about 1 year ago
New Batch of Monopile TPs for Coastal Virginia Offshore Wind Project En Route to US
Project Updates

New Batch of Monopile TPs for Coastal Virginia Offshore Wind Project En Route to US

The heavy load carrier Sun Rise is on its way to the US from the Port of Aalborg, Denmark, with 18 transition pieces (TPs) for the wind turbine foundations at the Coastal Virginia Offshore Wind (CVOW) project. According to a social media post by CS Wind Offshore, which is delivering 176 TPs for the

about 1 year ago
Scottish Floating Wind Project Completes Metocean Campaign
Project Updates

Scottish Floating Wind Project Completes Metocean Campaign

A joint venture between Ørsted, Simply Blue Group and Subsea7 has retrieved floating LiDARs and wave buoy equipment as part of the metocean campaign for the proposed Salamander floating offshore wind farm off the North East of Scotland. The campaign started in October 2023 with the deployment of two

about 1 year ago
Ossian geophysical
Project Updates

Geophysical Cable Route Survey Completed for Ossian Floating Offshore Wind Farm

Ireland-based XOCEAN has completed the geophysical survey along the 420-kilometre cable route for the proposed 3.6 GW Ossian floating offshore wind farm in Scotland. The survey, conducted using uncrewed survey vessels (USVs), took place over a span of 13 months, in water depths ranging from the shor

about 1 year ago
Deep Wind Offshore Korea
Project Updates

Deep Wind Offshore Secures Permit for Up to 1.5 GW South Korean Project

Deep Wind Offshore Korea has secured a Public Waters Occupancy and Use Permit for its Admiral Lee offshore wind project in South Korea. “This achievement marks an essential step forward in our mission to advance renewable energy development in South Korea. The permit allows us to complete offshore l

about 1 year ago
baltic power svanen
Project Updates

Monopile Installation Nears as Offshore Work Starts at Baltic Power

Preparatory and trial operations for offshore construction are underway at the Baltic Power offshore wind farm site in the Polish sector of the Baltic Sea, with several vessels involved, including Van Oord’s heavy-lift ship Svanen, in advance of the upcoming monopile installation work. Van Oord’s he

about 1 year ago
Moray West Ocean Winds Cadeler
Project Updates

Ocean Winds Receives Final BOEM Approval for 2.4 GW SouthCoast Wind

The US Bureau of Ocean Energy Management (BOEM) has approved the Construction and Operations Plan (COP) for the SouthCoast Wind offshore wind project. This is the final approval needed for the project from BOEM following the Record of Decision (ROD) from the Department of the Interior (DOI) in Decem

about 1 year ago
An image showing a map of Hornsea offshore wind projects with Hornsea 4 highlighted
Project Updates

Geotechnical Surveys to Start at Hornsea Four Site in February

Geotechnical survey works are scheduled to commence at the Hornsea Four offshore wind farm site in the UK in February 2025. The geotechnical seabed investigations, which include boreholes and cone penetration tests (CPTs), will be conducted using survey vessels Connector, Geoquip Saentis, and Geoqui

about 1 year ago
Estonia Invites Competing Applications for Saare 7 Offshore Wind Area as Developer Submits Proposal
Project Updates

Estonia Invites Competing Applications for Saare 7 Offshore Wind Area as Developer Submits Proposal

Estonian developer Sunly Wind has applied for a superficies licence with Estonia’s Consumer Protection and Technical Regulatory Authority (CPTRA) for an offshore wind farm in the Saare 7 area. The CPTRA has now initiated a procedure for the area under which it invites any competing applications to b

about 1 year ago
Aker Solutions-Siemens Energy Consortium Receives Full Notice to Proceed for RWE’s Two Norfolk Offshore Wind Projects
Project Updates

Aker Solutions-Siemens Energy Consortium Receives Full Notice to Proceed for RWE’s Two Norfolk Offshore Wind Projects

RWE has given the consortium of Aker Solutions and Siemens Energy the full notice to proceed on the offshore and onshore substations for the Norfolk Vanguard West and East offshore wind projects in the UK. Aker Solutions has provided work for the projects under a limited notice to proceed announced

about 1 year ago
  • 1
  • …
  • 54
  • 55
  • 56
  • …
  • 102