offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Ports & Logistics

Loading filters...
Wind Farm UpdateBusiness & FinanceContracts & TendersJobs & RecruitmentOperations & MaintenanceTraining & EducationVesselsAuthoritiesR&DTechnology
Scottish Offshore Wind Farm to Come Online Later Than Planned
Ports & Logistics

Scottish Offshore Wind Farm to Come Online Later Than Planned

The full commissioning of the Neart na Gaoithe (NnG) wind farm offshore Scotland has been postponed until 2024 due to the effects of the Covid-19 pandemic both in Europe and in the Far East, the developers of the 450 MW project said. NnG, jointly owned by EDF Renewables and ESB and under constructio

about 4 years ago
Iberdrola to Invest USD 10 + Billion in Wind Projects Offshore Massachusetts
Ports & Logistics

Iberdrola to Invest USD 10 + Billion in Wind Projects Offshore Massachusetts

Iberdrola will invest more than USD 10 billion in the development of three offshore wind complexes in Massachusetts, the Spanish energy company’s CEO, Ignacio Galán, told the Governor of Massachusetts, Charlie Baker. During the meeting, Galán also explained the company’s growth plan in the United St

about 4 years ago
Fécamp Gravity-Based Foundations Rise, Saipem 7000 to Handle Them
Ports & Logistics

Fécamp Gravity-Based Foundations Rise, Saipem 7000 to Handle Them

The first of the 71 gravity-based foundations for the Fécamp offshore wind farm has been completed at the Grand Port Maritime of Le Havre, France. The consortium of Bouygues Construction, Saipem, and Boskalis is in charge of supplying and installing the foundations for the 500 MW wind farm located b

about 4 years ago
UK Monopile Factory Changes Location, New Address at Teesworks
Ports & Logistics

UK Monopile Factory Changes Location, New Address at Teesworks

SeAH Wind Ltd will build a GBP 200-300 million UK XXL monopile manufacturing facility at Teesworks and not at Able UK’s Able Marine Energy Park (AMEP) on the South Bank of the Humber as initially planned. SeAH Wind Ltd, a subsidiary of South Korea’s pipe manufacturer SeAH Steel Holdings, has not spe

about 4 years ago
UK Raises Passenger Limit for Vessels Transporting Offshore Wind Workers
Ports & Logistics

UK Raises Passenger Limit for Vessels Transporting Offshore Wind Workers

As of 9 February, the high-speed offshore service craft of up to 500 GT will be able to carry up to 60 workers to and from wind farms offshore the UK while still meeting safety standards under new rules proposed by the UK Maritime and Coastguard Agency. Vessels which transported workers to offshore

about 4 years ago
Thialf Gearing to Unlock Baltic Sea and Shore Power
Ports & Logistics

Thialf Gearing to Unlock Baltic Sea and Shore Power

Heerema Marine Contractors is modifying the giant semi-submersible crane vessel Thialf to be able to access and work on projects in the Baltic Sea such as the Arcadis Ost 1 offshore wind farm scheduled to start later this year. Thialf is currently moored at the Calandkanaal, Port of Rotterdam, where

about 4 years ago
Montrose Port
Ports & Logistics

Inch Cape Picks Montrose Port for O&M Base

Inch Cape Offshore Limited, a joint venture between the Edinburgh-based Red Rock Power Limited and Ireland’s energy company Electricity Supply Board (ESB), has selected Montrose Port as the future operations and maintenance (O&M) base for the Inch Cape offshore wind farm. Should the Inch Cape projec

about 4 years ago
Heerema Shows XXL Offshore Wind Turbine Floating Installation Method – Video
Ports & Logistics

Heerema Shows XXL Offshore Wind Turbine Floating Installation Method – Video

Following the recent completion of the first offshore test, Heerema Marine Contractors has issued a video showing a novel method of assembling and installing XXL wind turbines onboard a floating, dynamically positioned (DP) vessel. The method was tested in the Dutch North Sea onboard the largest sem

about 4 years ago
Huisman Ringer Crane
Ports & Logistics

Mammoet Starts Patent Infringement Probe Against Huisman and BMS

Dutch heavy lifting company Mammoet said it has started investigating what the company describes as ”the possible violation of its intellectual property rights by Huisman and BMS Heavy Cranes.” The investigation concerns the recently announced series of land cranes, including a 3000-ton ring crane,

about 4 years ago
First Mediterranean Sea Wind Turbine Rises – Gallery
Ports & Logistics

First Mediterranean Sea Wind Turbine Rises – Gallery

Van Oord’s jack-up MPI Resolution has started installing wind turbines at the 30 MW Taranto wind farm offshore Italy, the first wind farm to be built in the Mediterranean Sea. In the photos provided by Renexia SpA, the developer of the wind farm, MPI Resolution is seen installing the first of the te

about 4 years ago
Edda Wind Orders More Commissioning Service Operation Vessels
Ports & Logistics

Edda Wind Orders More Commissioning Service Operation Vessels

Edda Wind has ordered three more Commissioning Service Operation Vessels (CSOV) in addition to the six vessels the company has under construction. The vessels are specially designed for service operations during the commissioning and operation of offshore wind farms. The three CSOVs will be prepared

about 4 years ago
Seajacks Scylla Arrives in Taiwan to Start Greater Changhua Work
Ports & Logistics

Seajacks Scylla Arrives in Taiwan to Start Greater Changhua Work

The jack-up vessel Seajacks Scylla has arrived in the Port of Taichung in Taiwan in preparation for the turbine installation work on the 900 MW Changhua 1 and 2a offshore wind farms. The installation work is expected to start as soon as a favourable window opens. Seajacks Scylla will transport and i

about 4 years ago
DEME Selects Port of Roenne as Arcadis Ost 1 Base
Ports & Logistics

DEME Selects Port of Roenne as Arcadis Ost 1 Base

DEME Offshore has selected the Port of Roenne on Denmark’s Bornholm Island as the storage and marshaling hub for the 257 MW Arcadis Ost 1 offshore wind farm in the German Baltic Sea. DEME is the EPCI contractor for the project’s 27 wind turbine foundations and one offshore substation foundation. ”We

about 4 years ago
Jack-Up That Lifts Feeder Barge Out of Water Offers Jones Act Solution – Video
Ports & Logistics

Jack-Up That Lifts Feeder Barge Out of Water Offers Jones Act Solution – Video

American Bureau of Shipping (ABS) has granted Approval in Principle (AIP) to a coordinated design for a wind turbine installation vessel (WTIV) in conjunction with the BargeRack feeder barge system by Friede and Goldman (F&G). The design is said to enable the Jones Act-compliant barge in a lifting s

about 4 years ago
  • 1
  • …
  • 26
  • 27
  • 28
  • …
  • 84