
The Crown Estate has invited proposals from the pre-qualified bidders in the Round 5 seabed leasing process which will award up to 4.5 GW of floating wind capacity in the Celtic Sea. On 13 August, The Crown Estate said the second phase of the leasing process got underway on 8 August, following the c

The European Commission’s (EC) Directorate-General for Energy (DG ENER) is preparing detailed recommendations on the integration of non-price criteria in offshore renewable energy tenders. The recommendations, expected to be published in March 2025, will also cover multi-source offshore energy parks

RWE and Luxcara have been selected as winners of the latest German tender, offering a total of 5.5 GW of capacity across three sites, N-9.1, N-9.2, and N-9.3, all located in the German North Sea. RWE has secured the sites N-9.1 and N-9.2, where the company plans to build two offshore wind farms with

A multibeam echosounder (MBES) geophysical survey of the Dogger Bank D offshore wind site, using several uncrewed surface vessels (USVs), is scheduled to start on 13 August. According to information in the project’s Notice to Mariners, XOCEAN will deploy multiple USVs to survey the wind turbine arra

South Korea will launch the first in a series of offshore wind tenders this October and (at least) two more until the first half of 2026, according to an Offshore Wind Power Competitive Bidding Roadmap the country’s Ministry of Trade, Industry and Energy (MOTIE) unveiled on 8 August. The tenders fro

A new report published in Scotland has put forward several recommendations for a nature-inclusive design framework for offshore wind projects. The report was commissioned by Crown Estate Scotland and prepared by the global consultancy company Xodus and the Dutch nature enhancement initiative The Ric

The UK Planning Inspectorate has completed the examination of RWE’s application for a development consent order (DCO) for Rampion 2, the proposed 1.2 GW extension to the existing 400 MW Rampion offshore wind farm in Sussex. The Examining Authority (ExA) at the Inspectorate now has three months to ma

The US states that launched the country’s first multi-state offshore wind solicitation last year have pushed back their bid selection deadline(s) by one month. The move comes after the US Department of Energy (DOE) granted funding to New England states for investment into regional electric infrastru

Taiwan’s Ministry of Economic Affairs (MOEA) has released the list of the projects awarded capacity in the latest offshore wind tender round. Five projects have been selected, totalling 2.7 GW in generation capacity. The projects are the 700 MW Youde (Shinfox), the 800 MW Formosa 6 (Synera Renewable

Azerbaijan will soon start wind measurement campaigns to assess offshore wind resources at two locations, according to a recent update from the Azerbaijan Renewable Energy Agency (AREA), part of the country’s Ministry of Energy. In a press release on 2 August, AREA said that work on starting measure

A recently launched UK-based renewable energy developer 17 Energy and a Chilean company SC Power have established a consortium with a plan to build a floating offshore wind farm with an installed capacity of 960 MW. The floating wind farm is proposed to be built off the coast of Chile’s Biobío Regio

The Netherlands Enterprise Agency (RVO) has awarded Fugro and Ocean Infinity AB contracts to carry out geotechnical investigations at the Doordewind zone, one of the three new areas designated by the Dutch Government in 2022 to increase offshore wind capacity. RVO launched the tender for offshore ge

The UK government has decided to increase the budget for the next Allocation Round 6 (AR6) to GBP 1.5 billion, including GBP 1.1 billion for offshore wind. The funding uplift represents more than a 50 per cent increase on the budget previously set in March this year. At the beginning of this year, t

The US Bureau of Ocean Energy Management (BOEM) has released the final Environmental Impact Statement (EIS) for US Wind’s Maryland offshore wind project, indicating that the project is nearing the end of the federal review process. BOEM held three public scoping meetings in June 2022 to solicit publ