ST3 Offshore is currently loading out the first jacket foundations for Ørsted’s Borkum Riffgrund 2 offshore wind farm at its serial manufacturing plant in Stettin, Poland.
Edda Passat, the first Service Operation Vessel (SOV) built in Spain, commenced sea trials earlier this month, after which the vessel will head to Ørsted’s Race Bank offshore wind farm in the UK.
MHI Vestas has completed the steel structure of its Fawley Paint & Logistics facility in Hampshire, UK.
TenneT has awarded Aker Solutions, NSG Wind and Fichtner with contracts for the maintenance of onshore and offshore converter station components and AC power transmission systems in the Dutch and German North Sea.
Leask Marine’s vessel C-Fenna has completed the recovery of ten seabed frames and buoys at Ørsted’s Borssele 1 and 2 offshore wind farm in the Netherlands on behalf of Fugro.
The offshore wind terminal at the Belfast Harbour, Ireland, handled 305,000 tonnes of wind farm components in 2017, representing a record since it opened in 2013.
UK-based Quortus and Belgian e-BO Enterprises are collaborating on enabling an LTE voice and data solution for offshore wind farms.
Service operations vessel (SOV) Vestland Cygnus has arrived at DHSS’ new supply base in the Port of Eemshaven, the Netherlands, where it will mobilize for the Merkur offshore wind farm.
Siemens Gamesa has rolled out the first D7 nacelle for the 309MW Rentel offshore wind farm from its new production facility in Cuxhaven, Germany.
The National Centers for Coastal Ocean Science (NCCOS) has completed seafloor mapping in the New York Wind Energy Area, a proposed offshore wind site near Long Island in the US.
RollDock is currently transporting the transition pieces (TPs) for the Merkur offshore wind farm from Aviles, Spain, to the Buss Orange Blue Terminal in the Eemshaven port, the Netherlands.
Ørsted and the University of Oxford have signed a five-year research agreement to optimize the design of foundation structures for offshore wind turbines.
The 30MW Hywind Scotland, the world’s first commercial-scale floating wind farm, performed better than expected in its first three full months in production, Statoil, the operator of the wind farm said.
Siemens Gamesa has unveiled its 3-year strategic plan, with the L3AD2020 program, which includes a series of measures that will unlock EUR 2 billion of cost reductions.