Safeway BV has introduced a new type of its motion-compensated walk-to-work gangway said to be designed to offer increased flexibility.
Damen Shipyards Group signed a contract with High Speed Transfers (HST) for a Fast Crew Supplier (FCS) 2710 during the Global Wind Summit in Hamburg.
The six largest European offshore helicopter airports have officially established the North Sea Heliports Alliance (NSHA) dedicated to servicing the offshore wind market.
James Fisher Subsea Excavation (JFSE), part of James Fisher and Sons plc, has completed three projects at offshore wind farms in European waters.
Siemens Gamesa Renewable Energy and SkySpecs have signed an agreement for autonomous drone inspections of Siemens Gamesa wind turbine blades both onshore and offshore.
Ørsted has signed an engineering, procurement and construction (EPC) contract with Delta Electronics to build its first megawatt-size energy storage pilot system at the National Changhua University of Education (NCUE) in Taiwan.
Ørsted will start sharing data with technical universities from the Westermost Rough wind farm featuring 6MW turbines to further improve wind farm design and inspire future engineers to join the green energy industry.
JDR Cable Systems has completed the loadout of 55km of cable for the EnBW Hohe See offshore wind farm in the German North Sea.
Canadian power company Northland Power Inc. has opened an offshore wind operations hub in Germany.
Alpha Offshore Service has completed more than 4,000 offshore wind turbine blade inspections so far in 2018, a 56% increase compared to 2017, previously said to be the company’s most productive period.
Airbus Helicopters views the support for wind farms as a business segment that is undergoing global growth and expects demand for up to a thousand helicopters over the coming two decades, corresponding to revenues of approximately EUR 9 billion.
Swedish offshore wind power developer and operator Vattenfall has signed a five-year cable repair framework agreement with power cable and asset management services provider CWind covering Vattenfall’s European assets.
The 385MW Arkona offshore wind farm in the German part of the Baltic Sea has supplied the first electricity to the German electricity grid.
The development of floating offshore wind will be held up by the limitations of current port infrastructure, a recent research has revealed.