offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
offshoreWIND.biz logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Loading filters...
Ports & LogisticsWind Farm UpdateContracts & TendersAuthoritiesBusiness & FinanceGrid ConnectionVessels
SSE's Beatrice offshore wind farm
Operations & Maintenance

SSE Chooses Arklow Harbour for 520 MW Irish OWF

SSE Renewables has selected Arklow Harbour as the preferred location for the operations and maintenance (O&M) base for the second phase of the Arklow Bank offshore wind farm. The developer has been assessing the Wicklow Port and Arklow Harbour as possible locations for the project’s O&M base since e

about 6 years ago
Siemens Gamesa to Maintain DanTysk Turbines
Operations & Maintenance

Siemens Gamesa to Maintain DanTysk Turbines

Siemens Gamesa has won a contract to provide turbine maintenance services at the 288 MW DanTysk offshore wind farm in the German North Sea. In operation since 2015, the DanTysk offshore wind farm comprises 80 Siemens 3.6 MW wind turbines. The contract, awarded to Siemens Gamesa by DanTysk Sandbank O

about 6 years ago
Modus Subsea's HAUV vehichle under water
Operations & Maintenance

Modus Checks Gwynt y Môr Inter-Array Cable Routes

Modus Seabed Intervention has completed a high speed bathymetric and depth of burial survey of the inter-array cable routes at the Gwynt y Môr offshore wind farm. The 160-turbine offshore wind farm, operated by innogy, comprises 161 inter-array cables totaling some 147 kilometres in length. To carry

about 6 years ago
BWTS Secures Nordsee-Ost Work
Operations & Maintenance

BWTS Secures Nordsee-Ost Work

BWTS GmbH has signed the contract for the execution of the statutory inspection, maintenance, and repair of all safety equipment at the Nordsee-Ost wind farm in the German North Sea. Furthermore, BWTS GmbH will take over the general overhaul of the service lifts. The 295 MW Nordsee-Ost consists of 4

about 6 years ago
The Netherlands to Extend Offshore Wind Licences to 40 Years
Operations & Maintenance

The Netherlands to Extend Offshore Wind Licences to 40 Years

The Netherlands intends to extend the licences for new offshore wind projects from 30 to 40 years, according to Eric Wiebes, the country’s Minister for Economic Affairs and Climate Policy. In a letter sent to the Dutch Parliament, Minister Wiebes said that the extended licences will allow the develo

about 6 years ago
Van Oord's Svanen installing the first monopile at Kriegers Flak
Operations & Maintenance

NGI Monitoring Kit for Kriegers Flak Foundations

Norwegian Geotechnical Institute (NGI) has won the contract for a structural measurement campaign at Vattenfall’s Kriegers Flak offshore wind farm. The scope of the contract covers the design, production, and installation of instrumentation on two offshore wind turbines which will monitor the monopi

about 6 years ago
EDS HV Wraps Up Export Cable Work at SeaMade Offshore Wind Farm
Operations & Maintenance

EDS HV Wraps Up Export Cable Work at SeaMade Offshore Wind Farm

EDS HV Group has completed the termination and testing of the export cables at the SeaMade offshore wind farm in Belgium. The first phase of the work was completed at the Mermaid concession 54 kilometers off the coast on behalf of Hellenic Cables. EDS HV said it had secured the contract prior to the

about 6 years ago
Vattenfall Gathers Blade Squad
Operations & Maintenance

Vattenfall Gathers Blade Squad

Vattenfall has signed a Framework Agreement with two UK and one Danish company to provide up-tower blade maintenance and repair at the company’s wind farms for a minimum period of two years. The Swedish energy company selected GEV Wind Power, James Fisher Marine Services, and Danish Blade Service to

about 6 years ago
Chartwell Marine and BAR Technologies Unveil Next-Gen CTV Design
Operations & Maintenance

Chartwell Marine and BAR Technologies Unveil Next-Gen CTV Design

Naval architects Chartwell Marine and BAR Technologies have established a partnership to support the delivery of the next generation of offshore wind crew transfer vessels (CTVs). The partnership will drive forward the development of new vessel designs ranging from 30-metre CTVs through to 60-metre

about 6 years ago
World's Largest Offshore Wind Farm Homeports in Tyneside
Operations & Maintenance

World’s Largest Offshore Wind Farm Selects O&M Base

Equinor and SSE Renewables plan to build a new Operations and Maintenance (O&M) base at the Port of Tyne, UK, to service the 3.6 GW Dogger Bank offshore wind project. Dogger Bank Wind Farm is a 50:50 joint venture (JV) between Equinor and SSE Renewables. The construction of the wind farm, led by SSE

about 6 years ago
EMO Continues Trianel Windpark Borkum Duty
Operations & Maintenance

EMO Continues Trianel Windpark Borkum Duty

EMS Maritime Offshore (EMO) has signed a charter contract for the WINDEA Three crew transfer vessel (CTV) to service the operating phase of the Trianel Windpark Borkum Phase I offshore wind project. WINDEA Three began the three-year charter in February, succeeding its sister vessel WINDEA One which

about 6 years ago
A photo of Trianel Windpark Borkum in sunset
Operations & Maintenance

Scour Protection Works Needed at One Trianel Windpark Borkum Turbine

Trianel Windkraftwerk Borkum has issued a tender for the provision and installation of scour protection at one wind turbine location in the Trianel Windpark Borkum (TWB) offshore wind farm in Germany. The contractor is responsible for the provision of the scour protection material (rocks) and its in

about 6 years ago
A photo of the Wind Innovation vessel mobilising for Borkum Riffgrund 2 offshore wind farm
Operations & Maintenance

Turbine Upgrade Campaign Starts at Borkum Riffgrund 2

The walk-to-work vessel Wind Innovation is currently deployed at the Borkum Riffgrund 2 offshore wind farm in Germany, where a wind turbine upgrade campaign is under way. During the last week of April, the vessel mobilised for the project at DHSS support base in Eemshaven, the Netherlands, according

about 6 years ago
Rovco-Joins-CWind-for-East-Anglia-ONE-Subsea-Work
Operations & Maintenance

Rovco Joins CWind for East Anglia ONE Subsea Work

Rovco has secured a contract by CWind for subsea work on the East Anglia ONE offshore wind project in the UK. The Rovco team, managed by CWind, will carry out a campaign of subsea inspection and survey work on all subsea structures, informing the maintenance of the turbine and substation foundations

about 6 years ago
  • 1
  • …
  • 45
  • 46
  • 47
  • …
  • 202