E.ON’s announcement on choosing Newhaven Port as its O&M base for the Rampion offshore wind project has been warmly welcomed by Seaford MP Norman Baker, East Sussex County Council leader Peter Jones and Lewes District Council leader James Page. The fact that most of the permanent jobs that could be
DONG Energy seeks for maintenance services for offshore wind farms. The company has three offshore wind farms and more than 300 onshore wind turbines in Denmark. The 3 offshore wind farms are Anholt off the coast of Grenå, Horns Rev 2 off the coast of Esbjerg and Nysted Havmøllepark off the coast of
ABC Marine has announced that it has successfully completed sea trials for the latest launch of ‘Channel Chieftain VI’, which is the first in class 19m Catfish CrewCat. This unique design allows for a semi elevated helm yet still retaining full forward visibility for the lower cabin. Powered by twin
It’s been a busy month for Seacat Services Ltd, as it starts to deploy an increasing number of vessels to European offshore wind projects. The two 19metre vessels, ‘Endeavour’ and ‘Reliance’, are three months into a five-month contract on the Anholt offshore wind farm in Denmark. Contracted to Nexan
E.ON has today announced that Newhaven port would be the operations and maintenance base for its proposed Rampion Offshore Wind Farm if the development is granted approval. The decision has been made following a rigorous technical assessment of both Newhaven and Shoreham Ports. The move could create
Island Shipping has acquired a 22 Metre Multi Category Vessel to be called the Island Kestrel. The vessel is equipped with powerful winches, a deck crane and fuel and water transfer systems. She is state of the art and boasts the very latest equipment. A powerful and versatile twin screw workboat, t
VisSim has supplied a comprehensive VTMS solution to manage Vessel Traffic Management, Personnel Tracking and Communications at Sheringham Shoal wind farm. To control the operation of the Sheringham Shoal wind farm, VisSim has supplied a comprehensive solution for surveillance, control and managemen
CLS Offshore has been awarded a new contract with new client Wood Group for remedial works following the completion of Scira’s Sheringham Shoal wind farm off the North Norfolk coast. A crew of electricians, platers, welders, painters, and technical workers, operating from an offshore accommodation v
Arklow Marine Services have recently been awarded a painting, on the seven offshore wind turbines on Arklow Bank. Arklow Marine Services is Ireland’s leading aluminium and steel boat builder. The company provides creation of a new vessel or the refurbishing of an existing boat. The company also work
After securing and successfully completing two major cable projects in the Irish Sea, and a further fault investigation on an Interconnector underway, the joint venture of Osiris Marine Services and Nordic Offshore Marine look to the spot charter market to provide a cost effective solution to subsea
Fyns Kran Udstyr A/S showcases solutions for lifting and handling of heavy wind turbine components at Husum WindEnergy, in hall B, stand no. 5B01D-7 Husum WindEnergy exhibition draws each year more than 36,000 visitors from 90 countries and 1,200 exhibiting companies. Fyns Kran Udstyr A/S is represe
Working under a joint venture for NSW, Osiris Marine Services & Nordic Offshore Marine mobilised the DP1 barge the Atlantis with a full survey/diving/cable repair complimented by subcontractor Reef Subsea Dredging & Excavation’s twin R2000 shallow water controlled flow excavation tool. The East West
Air Charter Service (ACS), one of the world’s leading providers of passenger and cargo charter flights, will present itself at the HUSUM WindEnergy 2012 fair. As an exclusive partner of the fair the globally active charter service provider presents its extensive range of services which is especially
Jumbo has successfully completed the TP-installation (Transition Pieces) for the Anholt Offshore Wind Farm, off the Danish coast. Jumbo’s DP2 Heavy Lift Vessel Jumbo Javelin installed the 111 TP’s with a record-breaking installation rate of 3 TP’s per day. The transport, installation, access to the