Maryland-based offshore wind developer US Wind, Inc. partnered with Tradepoint Atlantic (TPA), the firm overseeing the 3,100-acre redevelopment of the former Sparrows Point steel mill, to host offshore wind supply chain manufacturers at TPA’s Port of Baltimore facility on 2 November. Representatives
Siemens has recently taken delivery of a heavy cargo “roll on/roll off ” (RoRo) coaster specifically designed for the transportation of wind turbine parts. The Rotra Vente, delivered and commissioned by The Concordia Group, is 141 meters long and 20 meters wide. The vessel has a specially developed
Galloper Wind Farm Limited (GWFL) has agreed a lease in principle with Harwich International Port for an Operations & Maintenance (O&M) base for the 336MW Galloper offshore wind farm. GWFL is currently pursuing planning permission in relation to this, Toby Edmonds, Project Director, Galloper Wind Fa
Thirteen local organisations in Lancashire and Cumbria coastal communities have been awarded grants totalling GBP 250,000 through DONG Energy’s new Walney Extension Community Benefit Fund. Each year, approximately GBP 600,000 will be made available for community projects for the expected 25-year lif
Dutch subsea inspection maintenance and repair (IMR) provider, N-Sea, has increased its fleet through the long term charter of Siem Offshore’s offshore subsea construction vessel, the Siem Barracuda. The vessel is equipped specifically for subsea IMR, survey and construction operations, featuring tw
RenewableUK has welcomed the news that DONG Energy has awarded the UK-based JDR Cables with a multi-milion-pound contract to supply array cables to what will be the world’s biggest offshore wind farm, the 1.2GW Hornsea Project One. The British company will design and manufacture 242 kilometres of ar
UK-based Automated Ships Ltd and Norway’s Kongsberg Maritime have signed a Memorandum of Understanding to build the world’s first unmanned and fully-automated vessel for offshore operations. In January 2017, Automated Ships Ltd will contract ‘Hrönn’, which will be designed and built in Norway in coo
Aberdeen and Houston based M² Subsea Limited, a recently formed subsea services business, has secured a private equity investment to acquire a fleet of 32 remotely operated vehicles (ROVs). M² Subsea is set to become one of the largest independent providers of ROV services globally after attracting
Elisa Floats Self-Installing Offshore Wind Turbine Researchers gathered around the EU-funded Elisa Project have developed an offshore wind turbine system that can be completely pre-assembled and pre-commissioned in controlled harbour conditions. The Big League Offering Lowest Offshore Wind Prices (I
British companies have already won 115 contracts to provide services for 50 offshore wind projects abroad and can stand to benefit further from 250 offshore wind farms in development around the world, according to a document released by RenewableUK. The document shows that British companies are winn
DONG Energy’s recruitment partner Atlas Professionals will host a recruitment day in Liverpool on 11 November. Atlas’ Liverpool recruitment day will be held at the Liverpool Gateway Conference Centre from 10 am to 4 pm GMT. With a variety of long-term frame agreements in place, the recruitment day w
Palfinger Marine has launched a new 3D-compensation module designed for mounting on the company’s knuckle boom, telescopic boom or stiff boom cranes to transfer goods between the service operation vessels (SOVs) and wind turbines or other fixed offshore installations. The 3D-compensation enables pos
DONG Marks 1000th Turbine in Water DONG Energy has become the first company worldwide to have installed 1,000 offshore wind turbines, after recently installing the landmark turbine at the Gode Wind 2 offshore wind farm in German North Sea. DONG Upgrades Tendering System DONG Energy has added a new c
All 67 foundations are now standing in place at the 402MW Veja Mate offshore wind farm in the German North Sea after Offshore Wind Force (OWF) VM installed the last transition piece at the site in the early morning hours of Thursday, 27 October. Construction began in April 2016 when OWF, part of Bos