
Dragados Offshore is planning to add a new production site with 400,000 square metres of space in Spain for the manufacturing of TenneT’s 2 GW offshore converter stations. The production site is currently being built in the southern Spanish coastal town of Algeciras (Campo de Gibraltar region). From

Elia Transmission Belgium (ETB) has decided to temporarily postpone the signing of the high-voltage direct current (HVDC) contracts for Princess Elisabeth Island due to the price increase for the HVDC infrastructure, according to the Belgium transmission system operator (TSO). Princess Elisabeth Isl